Solicitation Amendment FA480026Q00090003 SF 30.pdf

PDF 114 KB Posted

Attached to
Ft Eustis Cranes and Hoist Inspection, Maintenance and Repair
Solicitation number
FA480026Q0009
Issued by

About this file

This is Amendment 0003 to Request for Quote (RFQ) FA480026Q0009, issued by the U.S. Air Force at Langley Air Force Base, Virginia on April 3, 2026. The amendment updates the Performance Work Statement (PWS) paragraph 2.8.1 to accurately reflect qualification requirements for crane inspectors and revises Factor 1 (Contractor Certification & Licenses) of the technical evaluation questions. All other terms and conditions remain unchanged.

The RFQ solicits crane and hoist inspection, testing, repair, and certification services. Quoters must submit three volumes: Price Volume (SCA wage rate compliant pricing with no page limit), Technical Volume (limited to 15 pages addressing four factors: Contractor Certification & Licenses, Management/Manpower Plan, Technical Capability/Approach, and Quality Control Plan), and Past Performance Information (two contract references evaluated via CPARS and PPIRS). Factor 1 requires documentation that all proposed crane/hoist inspectors meet the OSHA definition of a qualified person with training and experience per 29 CFR 1910, 29 CFR 1926, and ASME B30 Series standards, supported by nationally recognized certifications, manufacturer authorized training, or employer-validated qualification programs. The evaluation will rank quoters by total contract price, then assess the four lowest-priced quoters on technical acceptability and past performance using an Acceptable/Unacceptable basis. Award will be made to the lowest-priced quoter receiving Acceptable ratings for both technical and past performance. Quote submission deadline is April 10, 2026 at 1:00 PM EST via email to Cornelius Dauterive and Gerell Johnson.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

03 Apr 2026

4. REQUISITION/PURCHASE

REQUISITION NUMBER

5. PROJECT NUMBER (if applicable)

6. ISSUED BY CODE FA4800

FA4800 633 CONS LGCP

14 BURRELL ST BLDG 67, CP 757 225-1669

LANGLEY AFB, VA 23665

UNITED STATES

CORNELIUS DAUTERIVE, Email: cornelius.dauterive@us.af.mil Telephone: 574-8619 GERELL JOHNSON, Email: gerell.johnson@us.af.mil Telephone: 757-225-5256

7. ADMINISTERED BY (if other than Item 6)

CODE

SCD: PAS:

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)

CODE: FACILITY CODE:

9A. AMENDMENT OF SOLICITATION NUMBER

FA480026Q0009

9B. DATED (SEE ITEM 11)

11 Mar 2026

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; 1 or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required) See Section G - Contract Administration Data

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK

ONE

A.THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.)

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

a) Updated PWS paragraph 2.8.1 to accurately reflect the qualification requirements for a crane inspector.

b) Revised Factor 1 Contractor Certification & Licenses of the Technical Evaluation questions.

All other terms and conditions remain the same.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

GERELL R. JOHNSON

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

03 Apr 2026

Computer generated. Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA-FAR (48 CFR) 53.243

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

List of Attachments

The following Attachment modifications were made:

PWS Nov 5, 2025

Information From To AttachmentName PWS Nov 5, 2025 Updated PWS 3 April 2026 AttachmentURL 71881783 73802407

Instructions, Conditions, & Notices to Offerors or Quoters

Header Miscellaneous Text (Modified):

Instructions, Conditions, & Notices to Offerors or Quoters Instructions to Offerors Addendum to FAR 52.212-1 Instructions to Offerors - Commercial Items

1. The purpose of these instructions is to prescribe the format of the quotes in response to this RFQ, FA480026Q0009 and describe the approach for the development and presentation of the request for quote data. This is designed to ensure the essential information required for evaluation is submitted.

2. The Contracting Officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial quotes, the Contracting

Officer will review this determination and if, in the opinion, adequate price competition exists, no additional cost information will be requested Contracting Officer's or required. However, if at any time during this competition the determines that adequate price competition no longer exists, quoters may be Contracting Officer required to submit information, other than certified cost or pricing data, to the extent necessary for the to determine the reasonableness and Contracting Officer affordability of the price.

3. To assure the timely and equitable evaluation of quotes, quoters shall follow the instructions contained herein. Quoters are required to meet and address all of the requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in a quotes being deemed ineligible for award. Quotes must clearly identify any exception to the terms and conditions and provide complete accompanying rationale. The quotes when submitted, shall be comprehensive, complete, self-sufficient, and respond directly to the requirements of the RFQ. Elaborate artwork, expensive paper/binding and expensive visual aids are neither necessary nor desired.

a. The RFQ responses shall consist of the following:

(1) Price Volume

(2) Technical Volume

(3) Past Performance Information.

b. All pages of each part shall be numbered. The volumes will be Times New Roman 12 pitch and no larger than 8 1/2" x 11" paper, (when printed) except for fold-outs used for charts, tables or diagrams, which may not exceed11" x17". Each volume shall contain a cover sheet, clearly marked with the RFQ number, title, and the quoter's name and CAGE Code or DUNS. The technical volume shall not contain any price data or reference to price.

c. If applicable, include a statement in the quotes that it contains proprietary information for your company and cannot be released outside the Government.

d. Failure to comply with these instructions may result in the quoter's being summarily rejected. Any commitments made in the quotes shall become part of the resultant contract.

4. VOLUME I - PRICE VOLUME:

This volume shall include only the prices complying with all SCA wage rates and other pertinent state, local and federal guidelines. Contractor shall use the format in the attached bid schedule to out their pricing information. All unit prices shall be rounded to the nearest dollar. The price volume does not have a page limitation.

FA480026Q00090003

5. VOLUME II- TECHNICAL VOLUME:

Each quoter shall submit a technical volume as part of their quotes, which shall address the technical criteria listed below. The contractor's quotes shall clearly demonstrate the ability to meet all requirements of the Performance Work Statement (PWS).The technical volume shall be limited to no more than 15 pages. The cover sheet is not included in the page limit; however, all pages after the cover sheet will count toward the page limit to include table of contents, abbreviation tables, etc. Pages exceeding 15 will be removed from the technical package and will not be evaluated.

Each quoter shall submit information clearly identifying how they will meet the following technical criteria:

Factor 1 - Contractor Cortication & Licenses

i. The offeror shall provide documentation demonstrating that all proposed crane/hoist inspectors meet the OSHA definition of a qualified person and possess the training, knowledge, and experience necessary to perform inspections in accordance with the applicable requirements of 29 CFR 1910, 29 CFR 1926, and the ASME B30 Series standards. Acceptable documentation includes nationally recognized crane/hoist inspector certifications, manufacturer authorized inspector training, or employer validated qualification programs that verify inspector competency.

Factor 2 - Management/Manpower Plan

i. Business Approach - Includes offeror's approach for planning, controlling, directing, and integrating resources in an efficient manner to full the requirements identified in the PWS.

ii. Staffing Approach - Approach for structuring, staffing (to include a proposed manning mix of personnel), retaining personnel, and utilization of key personnel to plan, control, and direct the labor force to meet the requirements of the PWS. The approach shall include an organizational chart with definition of roles and responsibilities of key operating personnel and staffing levels depicting various job classification. In addition, the plan must identify the individual serving as Contract Manager.

Factor 3 - Technical Capability/Approach

i. The offeror shall provide a narrative description for their approach, techniques, and/or procedures to be utilized to accomplish inspections, testing, and repair requirements set forth in the PWS.

Factor 4 - Quality Control Plan

i. The offeror shall provide a Quality Control Plan IAW Section 4.7 of the PWS. The plan shall describe how the Offeror will ensure strict compliance with the requirements of the PWS and actions to remedy any shortcomings.

6. PAST PERFORMANCE

Past performance shall be evaluated in accordance with FAR13.106-2(b)(3)(ii). The past performance information to be evaluated on each quoter will be information available in CPARS and PPIRS, any other sources identified by the quoter or the Government. Quoter shall provide two contract references for past performance.

7. GENERAL INFORMATION REGARDING SUBMISSION OF THE QUOTES. Below is a list of events and items requiring submission to the via Contracting Officer email by the dates specified. (No Exceptions):

Contractor Site Visit Request NLT: 1600EST, 6 March 2026

Contractor Base Access Request Submittal NLT: 1600EST, 9 March 2026

Contractor Site Visit: Friday, 13 March 2026 @ 1000 EST

Site Visit Questions Due NLT:1100EST, 17 March 2026

Contractor Quotes Due NLT: 1300EST, 10 April 2026

Faxed or mailed quotes WILL NOT be accepted. Quotes shall bee-mailed to the issuing office of this solicitation to the attention of Cornelius Dauterive and Gerell Johnson.

The quoter is responsible for confirming receipt of quotes. For questions, please contact Mr. Dauterive, 757-764-0553, or Cornelius.Dauterive@us.af.mil and Gerell R. Johnson, 757-225-5256 or gerell.johnson@us.af.mil.

Late RFQs will be processed in accordance with FAR52.212-1(f) Late submission, modifications, revisions, and withdrawals of quotes.

Evaluation Factors for Award

Header Miscellaneous Text (Modified):

Evaluation Factors for Award

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) This competitive Request for Quote (RFQ) will be conducted in accordance with Federal Acquisition Regulation (FAR) Part 12,Acquisition of Commercial Items, and FAR Part 13, Simplified Acquisition Procedures. The Government will award a contract resulting from this RFQ to the responsible quoter whose quote conforms to the RFQ and will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate quotes:

1. Price

2. Technical

3. Past Performance

All quoters will be ranked by total contract price from low to high, and will then be evaluated for both Technical and Past Performance. Technical and Past Performance will be evaluated on a "Acceptable/Unacceptable "basis. Quoters shall receive a "Acceptable" rating for both Technical and Past Performance in order to be eligible for award.

The government will evaluate the 4 (four) lowest priced quoters for technical acceptability, past performance acceptability and price reasonableness. Should the lowest priced quoters not receive an acceptable technical and past performance rating and cannot be remedied through minor corrections, the process will continue in order of price until 4 (four) quoters with acceptable technical and past performance rating and fair and reasonable price are identified. Award will be made to the quoter with the lowest proposed price and receiving an "Acceptable" rating for both Technical and Past Performance.

Quoters are cautioned to submit sufficient information and, in the format, specified in these preparation instructions. Quoters may be asked to clarify certain aspects of their proposal or respond to adverse past performance information to which the quoter has not previously had an opportunity to respond before being rated unacceptable.

A written notice of award or acceptance of an offer mailed or otherwise furnished to the successful offeror by the Government within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer

(or part of a offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(b) Options. The Government will evaluate quotes for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that a quote is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s). In accordance with FAR 52.217-8, Option to Extend Services, the Government will evaluate 50%(or 6 months' worth) of the final option year price to determine the price to be fair and reasonable in the case that this extension clause needs to be utilized.

(c) By submission of its quote, in accordance with the instructions in clause 52.212-1 "Instructions to Offerors", the quoter accedes to all solicitation requirements, including terms and conditions, representations and certifications, and Performance Work Statement requirements. All quotes shall be treated equally for technical portions and performance records. Quoters must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The evaluation process shall proceed as follows:

EVALUATION OF PRICE

Price will be evaluated using techniques established in FAR13.106-3(a)(1) to ensure the Government receives a fair, reasonable and balanced price. If the Government cannot determine the proposed pricing to be fair and reasonable, other than cost and pricing data will be obtained from the quoters. The Government will evaluate quotes for award purposes by adding the total price for all CLINS including basic period, option years, and fifty percent (50%) of the last option period price to cover the option to extend services IAW clause 52.217-8.

There is a great expectation of competition for this requirement; quoters are cautioned to present their best price quote up-front. Price quotes shall represent the quoters best effort to respond to the solicitation.

NOTE: Evaluation of the option periods shall not obligate the Government to exercise such options.

Option to Extend Services. Both the solicitation and resultant contract shall contain FAR Clause 52.217-8,entitled "Option to Extend Services". This clause allows for up to an additional six month continued contract performance if required. Interested quoters shall not include pricing in their quote for this clause as fifty percent (50%) of the last option period shall be used for the pricing only if clause 52.217-8 is required.

Materially Unbalanced Quote: If the contracting officer sees a wide variation in prices, the contracting officer can consider the need to amend the solicitation or ask the quoter(s) appropriate questions. Unbalanced pricing poses an unacceptable risk to the Government and may be a reason to reject a quote.

EVALUATION OF TECHNICAL

The technical rating reflects the degree to which the quoters technical volume meets or does not meet the minimum performance or capability requirements. The focus is on the ability of the quote to meet the minimum requirements of the PWS. Each quoter shall submit information clearly identifying how they will meet the following technical criteria:

Factor 1 - The quoter shall provide their qualifications for crane and hoist repairs, testing and certifications. If personnel work under their license/qualification they must show the authorization permitting such work, i.e. OSHA, ASME/ANSI, etc.; SEE Para 2.1. General and 2.8.1. Personnel Qualifications.

Factor 2 - The quoter shall provide a staffing plan that demonstrates their ability to hire qualified personnel with the necessary experience/qualifications to support the requirements of the Performance Work Statement.

Technical quotes will be evaluated on a "Acceptable/Unacceptable" basis. To receive a rating of "Acceptable, "the quoter must adequately address their plan to meet the above mentioned technical criteria. Quoters must receive a rating of "Acceptable" for technical in order to be eligible for award. Quotes that exceed the evaluation criteria will not receive higher ratings.

TABLE 1. Technical

Rating Description

Acceptable The quote clearly meets the minimum technical requirements of the solicitation.

Unacceptable The quote does not clearly meet the minimum technical requirements of the solicitation.

EVALUATION OF PAST PERFORMANCE

Past performance shall be evaluated in accordance with FAR13.106-2(b)(3)(ii). The past performance information to be evaluated on each quoter will be information available in CPARS and PPIRS, and any other source identified by the quoter or the Government. If there is no performance information available the past performance rating will be considered neutral, and therefore will be rated acceptable.

The Government evaluators will conduct an in-depth review and evaluation of all available performance data to determine how closely the work performed under those efforts relates to the effort. The main purpose of the past performance evaluation is to appropriately consider each quoter demonstrated record of contract compliance by supplying products and services that meet user's needs, including business relations, management, schedule and performance quality constraints.

Past Performance shall be evaluated on a "Acceptable/Unacceptable" basis. In the event of negative comments of a quoters past performance, the contracting officer shall evaluate the comments and make a "Acceptable/Unacceptable " determination. If a quoter is determined to have "Marginal" or "Unsatisfactory" past performance ratings, they will be given an overall past performance rating of "Unacceptable."

TABLE 2. Past Performance

Acceptable Based on the quoters performance record, the Government has a reasonable expectation that the quoter will successfully perform the required effort, or the quoters performance record is unknown. To be rated as "Acceptable", no Marginal or Unsatisfactory ratings can be found in the past performance information.

Unacceptable Based on the quoters performance record, the Government has no reasonable expectation that the quoter will be able to successfully perform the required effort. To be rated "Unacceptable", a negative rating of Marginal or Unsatisfactory will be identified by this office and validated by the Contracting Officer.

(End of provision)