Solicitation Amendment FA480025B00060001 SF 30.pdf

PDF 1 MB Posted

Attached to
Joint Base Langley - Eustis (JBLE) - Langley AFB, VA, Repair Building Envelope, Facility 703 Federal contract opportunity
Solicitation number
FA480025B0006
Issued by
Department of the Air Force Air Combat Command

About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a construction project issued by the 633 Contracting Squadron at Joint Base Langley-Eustis. The amendment extends the bid due date from 21 August 2025 to 26 August 2025 at 2:00 p.m. E.T. and incorporates several key additions, including Government Answers to Bidder Questions, a Pre-Bid Site Visit Sign-In Sheet, and Revised Drawing Sheets A-201-A and A-202-A.

The solicitation requires bidders to submit a detailed, comprehensive AF Form 3052 Construction Cost Estimate Breakdown and meet specific responsibility requirements. These include demonstrating adequate financial resources, satisfactory past performance, and key personnel with substantial experience: a Project Manager with 5+ years, a Superintendent with 10+ years, and a Quality Control Manager/Site Safety and Health Officer with 10+ years of experience. Bid pricing shall remain valid through 31 December 2025, and the contract will be awarded to the responsible bidder with the most advantageous bid considering price and price-related factors.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Amendment required to provide Government Answers to Bidder Questions, extend the bid due date, Block 14 (Description of Amendment/Modification):

incorporate Pre-Bid Site Visit Sign-In Sheet and Revised Drawing Sheets, and clarify the requirement that bidders shall provide a fully completed AF Form 3052, Construction Cost Estimate Breakdown, in accordance with Solicitation Section L, Paragraph L-1.1.

a. Government Answers to Bidder Questions are hereby incorporated into this solicitation as "Attachment 8 - Bidder Questions and Government Answers."

b. Bid due date is hereby extended from 21 August 2025 to 26 August 2025 at 2:00p.m. E.T.

c. The Pre-Bid Site Visit Sign-In Sheet is hereby incorporated into this solicitation as "Attachment 9 - Pre-Bid Site Visit Sign-In Sheet."

d. Revised Drawing Sheets A-201-A and A-202-A are hereby incorporated into this solicitation as "Attachment 10 - Revised Drawing Sheets A-201-A and A-202- A."

e. Section L, Paragraph L-1.1. is hereby changed from:

"L-1.1. Notice To Offeror(s). Section L of the IFB provides general guidance for preparing bids and content of the required data/information. Bids must include all data/information requested in the IFB. Bidders shall submit one hardbound, tabbed original and one hardbound, tabbed copy containing the: (1) Fully completed Standard Form (SF) 1442, Solicitation, Offer, and Award; (2) Fully completed solicitation Attachment 6, Construction Cost Estimate Breakdown; and (3) Responsibility Evaluation Factors that fully address the evaluation factors noted in L-3.1. through L-3.6. of this section," to:

"L-1.1. Notice To Offeror(s). Section L of the IFB provides general guidance for preparing bids and content of the required data/information. Bids must include all data/information requested in the IFB. Bidders shall submit one hardbound, tabbed original and one hardbound, tabbed copy containing the: (1) Fully completed Standard Form (SF) 1442, Solicitation, Offer, and Award; (2) Detailed, accurate, and itemized Attachment 6 - AF Form 3052, Construction Cost Estimate Breakdown, to include all applicable divisions, sub-divisions, and work elements/line items, which shall be specific and comprehensive; and (3) Responsibility Evaluation Factors that fully address the evaluation factors noted in L-3.1. through L-3.6. of this section."

f. All other terms and conditions of this solicitation remain unchanged.

Section A - Solicitation/Contract Form

The following modifications were made:

Information From To Accept Within Days 132 127 Response Due Date 21 Aug 2025 26 Aug 2025

Section J - List of Attachments

Header Miscellaneous Text (Modified):

1. Statement of Work, dated 1 July 2025 - 5 Pages

2. Drawings, dated 8 July 2025 - 31 Pages

3. Specifications, dated 8 July 2025 - 763 Pages

4. Design Analysis, dated 19 June 2025 - 83 Pages

5. AF Form 66, Submittal Register, dated 14 July 2025 - 24 Pages

6. AF Form 3052, Construction Cost Estimate Breakdown, dated 14 July 2025 - Excel Spreadsheet

7. General Decision Number VA20250022, Revision Number 4 - Building, dated 20 June 2025 - 7 Pages

8. Bidder Questions and Government Answers, dated 15 August 2025 - 17 Pages

9. Pre-Bid Site Visit Sign-In Sheet, dated 29 July 2025 - 2 Pages

10. Revised Drawing Sheets A-201-A and A-202-A - 8 July 2025 - 2 Pages

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Header Miscellaneous Text (Modified):

L-1. GENERAL INSTRUCTIONS.

L-1.1. Notice To Offeror(s). Section L of the IFB provides general guidance for preparing bids and content of the required data/information. Bids must include all data/information requested in the IFB. Bidders shall submit one hardbound, tabbed original and one hardbound, tabbed copy containing the: (1) Fully completed Standard Form (SF) 1442, Solicitation, Offer, and Award; (2) Detailed, accurate, and itemized Attachment 6 - AF Form 3052, Construction Cost Estimate Breakdown, to include all applicable divisions, sub-divisions, and work elements/line items, which shall be specific and comprehensive; and (3) Responsibility Evaluation Factors that fully address the evaluation factors noted in L-3.1. through L-3.6. of this section.

L-1.2. The Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of bids. In the event the Government cancels this solicitation, the Government has no obligation to reimburse a bidder for any proposal preparation costs.

FA480025B00060001

1245521843C Highlight

1245521843C Highlight

L-1.3. Award will be made to the responsible bidder whose bid is responsive to the terms of the invitation for bids (IFB) and is most advantageous to the Government, considering only price and the price-related factors included in the invitation.

L-1.4. Bid pricing in response to this solicitation shall be valid through 31 December 2025.

L-1.5. Bidders shall note overall bid amount in Block 17, Page 2 of the SF 1442.

L-1.6. Bidders shall acknowledge awareness of all amendments to the solicitation by signing and dating Block 19, Page 2 of the SF 1442.

L-1.7. Bids will be evaluated without discussions. Therefore, bidders are advised that taking exception to any requirements specified in this solicitation will result in the Government rejecting the bid. Clarification of Government requirements shall be handled by submitting questions/recommendations prior to submission of bids.

While bidders may propose exceptions to the solicitation requirements, the Government is not obligated to accept such bids. Any change to the requirement as a result of accepting an exception shall be reflected by amendment to the IFB before bids are due.

L-1.8. Complete the necessary fill-ins and certifications in all provisions/clauses throughout the solicitation. Failure to complete these items may result in the bidder being found non-responsive and/or non-responsible.

L-2. SUBMISSION OF BIDS.

L-2.1. All bids shall be mailed or hand delivered (no electronic bids will be accepted) to the following issuing office as specified in Block13(a) of the SF 1442. If bids are to be hand delivered, bidders shall send an email to adrian.galvis@us.af.mil and callie.compton@us.af.mil to schedule delivery. Please mark all packages as follows:

DO NOT OPEN IN MAIL ROOM

Solicitation Number FA480025B0006

633 Contracting Squadron/PKB ATTN: Callie Compton/Adrian Galvis

14 Burrell St, Building 67

Joint Base Langley - Eustis (JBLE) - Langley AFB, VA 23665-2088

L-3. RESPONSIBILITY REQUIREMENTS. To be determined responsible, the bidder must provide/demonstrate their ability to meet the following requirements.

L-3.1. Adequate Financial Resources. Provide a letter from the bidder's financial institution that addresses the financial health of the company to demonstrate that adequate financial resources are available to perform the contract.

L-3.2. Satisfactory Past Performance. Bidders shall have a satisfactory performance record. A bidder shall not be determined responsible or non-responsible solely on the basis of a lack of relevant performance history.

L-3.3. Satisfactory Record of Integrity Business and Business Ethics.

L-3.4. Necessary Organization, Experience, Accounting & Operational Controls, and Technical Skills. The bidder's Project Manager shall have a minimum of five

(5) years of experience. The Superintendent shall have a minimum often (10) years of experience in the Superintendent role. The Quality Control Manager/Site Safety and Health Officer (QCM/SSHO) shall have a minimum of ten (10) years of experience in the field of construction.

L-3.5. Necessary Production, Construction, and Technical Equipment. Provide information as to how the bidder has sufficient resources, equipment, etc., or the ability to obtain it (e.g. equipment yard inventory, financial capability, subcontractors, etc.) to satisfactorily perform work under this project.

L-3.6. Be Otherwise Qualified and Eligible to Receive Award Under Applicable Laws and Regulations.

FA480025B00060001

SUMMARY OF CHANGES
Solicitation/Contract Form
List of Attachments
Instructions, Conditions, & Notices to Offerors or Quoters
IDCode: J
Page: 1
Pages: 3
AmendNo: 0001
EffDate: 18 Aug 2025
ReqNo:
ProjNo: MUHJ 25-4026
IssCode: FA4800
AdmCode:
IssuedBy: FA4800 633 CONS LGCP

14 BURRELL ST BLDG 67, CP 757 225-1669

LANGLEY AFB, VA 23665

UNITED STATES

ADRIAN GALVIS, Email: adrian.galvis@us.af.mil Telephone: 574-8461 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA480025B0006
SolDate: 21 Jul 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: Off
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: Callie Compton
ContDate:
CODate: 18 Aug 2025