Attch 6 As Built Drawings Bldg-814 Was Bldg 6 In Site Plan and 820 Was Bldg 7 In Site Plan FE 208-1 Sixteen 225 Man Barracks Yr 1951.pdf
PDF 47 MB Posted
- Attached to
- Combined 7 Building Demolition
- Solicitation number
- FA480021Q0007
About this file
This document outlines a federal contract solicitation to demolish seven buildings on Joint Base Langley-Eustis in Virginia. The solicitation was issued by the Department of the Air Force Air Combat Command and seeks a contractor to provide all management, transportation, tools, equipment, labor, testing and supervision to safely demolish buildings 814, 820, 853, 877, 2431, 2630, and 2802. The contractor must submit their proposed period of performance not to exceed 12 months. The contractor will be responsible for field investigations, vehicles and necessary services to ensure continuous and reliable demolition in accordance with attached drawings, specifications, and applicable laws, regulations and standards with a focus on safety and customer service.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FE 208-1.00 Htg Plant- TITLE SHEET
| FE 208-1.01 Htg Plant- Site Pl - Bailey Ave |
| FE 208-1.02 Htg Plant- Grading Pl- Bailey Ave |
| FE 208-1.03 Htg Plant- SS - Bailey Ave |
| FE 208-1.04 Htg Plant- SS Profiles-Bailey Ave |
| FE 208-1.05 Htg Plant- SS Profiles-Bailey Ave |
| FE 208-1.06 Htg Plant- Drainage Details |
| FE 208-1.07 Htg Plant- SS - Bailey Ave |
| FE 208-1.08 Htg Plant- SS Profiles-Bailey Ave |
| FE 208-1.09 Htg Plant- Water Distribution |
| FE 208-1.10 Htg Plant- Sewer Manhole Det |
| FE 208-1.11 Htg Plant- Rd Profilel-Bailey Ave |
| FE 208-1.12 Htg Plant- Rd Det & Boring Data |
| FE 208-1.13 Htg Plant- 12 -225 Man Barracks |
| FE 208-1.14 Htg Plant -Bsmt & 1st Floor Plan |
| FE 208-1.26 Htg Plant - Basement & 1st Flr Plans |
| FE 208-1.27 Htg Plant - Barrack 2&3 Flr Plans |
| FE 208-1.28 Htg Plant -Bsmt Plans Kitchen |
| FE 208-1.29 Htg Plant-1st Flr Pl-Equip Layout |
| FE 208-1.30 Htg Plant-Exterior Elevations |
| FE 208-1.31 Htg Plant-Long & Cross Sections |
| FE 208-1.32 Htg Plant-Wall Sections- Furred |
| FE 208-1.33 Htg Plant-Window-Chimney Det |
| FE 208-1.34 Htg Plant-Int & Ext Dr Sch & Det |
| FE 208-1.35 Htg Plant-Kitchen Equip Details |
| FE 208-1.36 Htg Plant-Kitchen Construc Det |
| FE 208-1.37 Htg Plant-Int Stairs-Bldgs 10-16 |
| FE 208-1.37A Htg Plant-Int Stairs-Bldgs 5-15 |
| FE 208-1.38 Htg Plant-Toilet Room Pl & Det |
| FE 208-1.39 Htg Plant-Exp Jt Det-Roof Plan |
| FE 208-1.40A Htg Plant-Masonry Vestibules |
| FE 208-1.41 Htg Plant Miscellaneous Details |
| FE 208-1.42 Htg Plant -Beam Types & Det |
| FE 208-1.44 Htg Plant -1st & 2d Flr Fram'g Pl |
| FE 208-1.45 Htg Plant -3d Flr & Rf Framing Pl |
| FE 208-1.46 Htg Plant -Col & Bm Schedules |
| FE 208-1.47 Htg Plant -Bsmt 1st Floor Plan |
| FE 208-1.48 Htg Plant - Barrack 2&3 Flr Pln |
| FE 208-1.49 Htg Plant -Bsmt 1st Flr Plumbing |
| FE 208-1.50 Htg Plant - Toilet Rm Plumbing |
| FE 208-1.51 Htg Plant - Mess Bsmt 1st Flr Htg |
| FE 208-1.52 Htg Plant - Bsmt & 1st Floor Plan |
| FE 208-1.53 Htg Plant - Barrack 2&3 Flr Htg |
| FE 208-1.54 Htg Plant - Mess Bsmt 1st Flr Htg |
| FE 208-1.55 Htg Plant - Barracks 1st Flr Htg |
| FE 208-1.56 Htg Plant - Convector & CI Rad |
| FE 208-1.57 Htg Plant - Htg & Ventilating Det |
| FE 208-1.58 Htg Plant - Htg & Ventilating Det |
| FE 208-1.59 Htg Plant - Electrical |
| FE 208-1.60 Htg Plant - Electrical |
| FE 208-1.61 Htg Plant - Electrical |
| FE 208-1.62 Htg Plant - Electrical |
| FE 208-1.63 Htg Plant - Electrical |
| FE 208-1.64 Htg Plant - Sash & Frame Details |
File details come from the government source that posted it. Updated .