This is a Questions and Answers document for federal contract FA470426Q0006 titled "Access Road Equipment and Gravel." The document does not address specific response dates, award dates, or pricing terms, as it serves to clarify solicitation requirements rather than establish contractual timelines or compensation structures.
The document clarifies that the contractor's scope is limited to equipment rental, material procurement, delivery, maintenance, and transportation services with no construction or installation activities. Contractors must provide pit run base course material (300 tons) with supplier specification sheets and weight tickets from each delivery truck, standard roadway construction geotextile fabric without special specifications, and an on-road dump truck. The contractor must provide all equipment without operators and is responsible for filling a 2,000-gallon water truck as needed within 48 hours of government notification, with each refill constituting a separate billable order. The government will provide diesel fuel, while the contractor must supply lubricants and consumables required for equipment maintenance. Bill of Materials quantities are fixed, equipment delivery timelines are expressed in calendar days, and equipment must be repaired or swapped within 24 hours of government notification. Equipment is to operate on a single-shift basis, and escort requirements and Commercial Vehicle Inspection processing times will be confirmed upon award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Access Road Equipment and Gravel
FA470426Q0006
Questions
1. Pit Run Base Course 300 Tons * Who will perform the material and compaction tests? Is there a laboratory to validate those results? Should we include that cost?
- Contractors will just provide equipment and material. Contractor will not be performing or required to provide compaction tests. Contractor shall provide material specification sheet from the base course supplier and weight tickets from each delivery truck.
2. Will the required geotextiles (woven or non-woven) need to meet any specifications, or do we need to submit them for approval? It's important to know if the required materials are available in stock here in Puerto Rico.
- Standard roadway construction geotextile fabric is sufficient. No special specifications
3. Confirm access road limits and dimensions for all four (4) access roads (length/width/alignment).
- Contractors will just provide equipment, delivery, maintenance, and material.
Contractor will not be performing any construction of any access roads.
4. Confirm whether the contractor’s scope is limited strictly to equipment rental, material procurement, delivery, transportation, and maintenance services, with no construction or installation activities included.
- Contractors will just provide equipment, delivery, maintenance, and material.
Contractor will not be performing any construction of any access roads.
5. Confirm expected daily utilization hours for rented equipment (single-shift vs extended ops).
- Single shift
6. Confirm whether the contractor is responsible for providing fuel, lubricants, and consumables for all rented equipment during the period of performance.
- Government will provide diesel/fuel. Any lubricants or consumables required as part of vehicle or equipment maintenance will be provided by the contractor at the time of maintenance performance.
7. Confirm escort requirements for equipment movement and escort availability during normal duty hours.
- Will be confirmed upon award.
8. Provide estimated Commercial Vehicle Inspection (CVI) processing times for heavy equipment deliveries.
- Depends on time of delivery. Will be scheduled upon award.
9. Clarify weather stand-down authority and how rental day charges are handled for Government-directed stoppage.
- Contractors will just provide equipment, delivery, maintenance, and material.
Contractor will not be performing any construction of any access roads. There will be no government directed stoppage of the rental due to weather.
10. Confirm whether all listed equipment is to be provided without operators.
- Equipment is to be provided without operators.
11. Clarify whether delivery timelines stated in the PWS are expressed in calendar days or business days.
- Calendar days
12. Confirm that the 24-hour repair or equipment swap-out requirement begins at the time of Government notification to the contractor.
- 24-hour repair or equipment swap-out begins at time of government notification to the contractor.
13. Confirm whether the quantities listed in the Bill of Materials are fixed or subject to adjustment based on site conditions
- Fixed.
14. Confirm whether material certifications, test results, or compliance documentation are required upon delivery for pit run base course and geotextile fabric.
- Contractor shall provide material specification sheet from the base course supplier and weight tickets from each delivery truck.
15. Who will be responsible for providing fuel for the equipment?
- Government will provide diesel/fuel. Any lubricants or consumables required as part of vehicle or equipment maintenance will be provided by the contractor at the time of maintenance performance.
16. Is the contractor responsible for refilling the 2,000-gallon water truck, or will the Air
Force be responsible for refilling the water truck each time it is required? If the contractor is responsible for filling the water truck, how often is the water truck expected to be filled?
- Contractor will be required to fill water truck as needed within 48 hours of government notification. Quantity of refills is unknown at this time. Each refill will be a separate order. Provide an estimated cost per refill.
17. Does the rental equipment need to include an operator, or will the operator be provided separately by the Air Force? If the operator is included, how will compensation be determined—based on wage determination rates or local wages?
- Rental equipment does not need an operator. Wage Determination Rates will not apply.
18. For the pit run base course, should this be white pit or blue pit run?
- No preference. Contractor shall provide material specification sheet from the base course supplier and weight tickets from each delivery truck.
19. Is the dump truck requested a standard on-road dump truck or an off-road dump truck?
- On-road