Price_Schedule_(Special_Requirements)_(Attch_3).xls
XLS spreadsheet 74 KB Posted
- Attached to
- Grounds Maintenance and Snow Removal Federal contract opportunity
- Solicitation number
- FA4690-16-R-0001
About this file
Special Requirements Price Schedule Updated
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Past_Performance_Questionnaire__(Attch_8).doc | DOC document | |
| SF_30_Grounds.pdf | ||
| PWS_-_Grounds_Maintenance_(Attch_1).doc | DOC document | |
| WD_05-2485_(Rev_16)_(Attch_5).pdf | ||
| Questions_ _Answers_(Attch_7).doc | DOC document | |
| Past_Perf_Questionnaire_(Attch_8).doc | DOC document | |
| SF_30.pdf | ||
| Master_Price_Schedule_(Attch_2).xls | XLS spreadsheet | |
| Price_Schedule_(Medical_Clinic)_(Attch_4).xls | XLS spreadsheet | |
| Grounds_and_Snow_Removal_Maps_(Attch_6).pdf | ||
| Wage_Determination_(Attch_5).docx | DOCX document | |
| Grounds_Mx_Solicitation.pdf | ||
| Master_Price_Schedule_(Attch_2).xls | XLS spreadsheet | |
| Price_Schedule_(Medical_Clinic)_(Attch_4).xlsx | XLSX spreadsheet | |
| PWS_-_FINAL_Grounds_Maintenance_30_Dec_2015_(Attch_1).doc | DOC document | |
| Price_Schedule_(Special_Requirements)_(Attch_3).xls | XLS spreadsheet | |
| Past_Perf_Questionnaire_(Attch_6).doc | DOC document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Yr (SR)
| GROUNDS MAINTENANCE | |||||
| FA4690-16-R-0001 | |||||
| ATTACHMENT 3, SPECIAL REQUIREMENTS PRICE SCHEDULE | |||||
| BASE YEAR | |||||
| LINE ITEM NO. (CLIN) | SERVICES DESCRIPTION | QTY | UNIT OF MEASURE | UNIT PRICE | TOTAL |
| 0013 | Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform SPECIAL REQUIREMENTS Maintenance services at Ellsworth AFB SD for the period 01 April 2016 - 31 March 2017 in accordance with the Performance Work Statement (PWS). This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINs (0013AA-0013AU). | ||||
| The Contractor shall upon notification by the Contracting Officer through the issuance of a delivery order, install or upgrade underground irrigation systems. The requirement of this CLIN applies to all subsequent SubCLINs (0013AA-0013AU). | |||||
| 0013AA | Repair 3/4" - 2" Poly Split (avg 20 ft) (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 0013AB | Repair 3/4" - 1" PVC Split (avg 20 ft) (PWS 1.1.4.2) ) | 10 | EA | $0.00 | |
| 0013AC | Repair 1.5" - 3" PVC Split (avg 20 ft) (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 0013AD | Replace 1" or 2" Solenoid (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 0013AE | 1" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 0013AF | 1 1/2" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 0013AG | 2" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 0013AH | 2.5" - 3" Control Valve (PWS 1.1.4.2) | 2 | EA | $0.00 | |
| 0013AJ | Replace Rainbird 5004 Plus Rotary Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 0013AK | Replace Rainbird 1804 Pop-Up Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 0013AL | Replace Rainbird 1804 Nozzle Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 0013AM | Replace Rainbird Falcon 6504 Rotary Head - 2" Poly Split (avg 20 ft) (PWS 1.1.4.2) | 15 | EA | $0.00 | |
| 0013AN | Rain Bird ESP12LXMEF controller | 5 | EA | $0.00 | |
| 0013AP | Rain Bird VBREC12 12 Rectangle Valve Box with Lid | 15 | EA | $0.00 | |
| 0013AQ | Preparation of Dig Permits (PWS 1.7.7) | 25 | EA | $0.00 | |
| 0013AR | Shrub trimming Semi improved areas (PWS 1.7.3) | 100 | EA | $0.00 | |
| 0013AS | Unimproved grounds noxious and invasive species control only. Including 330 acres SE of air field (PWS 1.7.4, 1.7.5) | 1892 | ACRES | $0.00 | |
| 0013AT | Weed/vegitation control includes all other hard surfaces (example roads, side walks, curbs, parking lots, gravel roads, etc ) except airfield ramp, taxi way's and runway. (PWS 1.7.4, 1.7.5) | 1060 | ACRES | $0.00 | |
| 0013AU | Aeration all irrigated/non-irrigated improved areas (Sept) (PWS 1.7.8 | 96 | ACRES | $0.00 | |
| Total | $0.00 |
Option Yr 1 (SR)
| GROUNDS MAINTENANCE | |||||
| FA4690-16-R-0001 | |||||
| ATTACHMENT 3, SPECIAL REQUIREMENTS PRICE SCHEDULE | |||||
| OPTION YEAR ONE (1) | |||||
| LINE ITEM NO. (CLIN) | SERVICES DESCRIPTION | QTY | UNIT OF MEASURE | UNIT PRICE | TOTAL |
| 1013 | Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform SPECIAL REQUIREMENTS Maintenance services at Ellsworth AFB SD for the period 01 April 2017 - 31 March 2018 in accordance with the Performance Work Statement (PWS). This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINs (1013AA-1013AU). | ||||
| The Contractor shall upon notification by the Contracting Officer through the issuance of a delivery order, install or upgrade underground irrigation systems. The requirement of this CLIN applies to all subsequent SubCLINs (1013AA-1013AU). | |||||
| 1013AA | Repair 3/4" - 2" Poly Split (avg 20 ft) (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 1013AB | Repair 3/4" - 1" PVC Split (avg 20 ft) (PWS 1.1.4.2) ) | 10 | EA | $0.00 | |
| 1013AC | Repair 1.5" - 3" PVC Split (avg 20 ft) (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 1013AD | Replace 1" or 2" Solenoid (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 1013AE | 1" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 1013AF | 1 1/2" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 1013AG | 2" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 1013AH | 2.5" - 3" Control Valve (PWS 1.1.4.2) | 2 | EA | $0.00 | |
| 1013AJ | Replace Rainbird 5004 Plus Rotary Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 1013AK | Replace Rainbird 1804 Pop-Up Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 1013AL | Replace Rainbird 1804 Nozzle Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 1013AM | Replace Rainbird Falcon 6504 Rotary Head - 2" Poly Split (avg 20 ft) (PWS 1.1.4.2) | 15 | EA | $0.00 | |
| 1013AN | Rain Bird ESP12LXMEF controller | 5 | EA | $0.00 | |
| 1013AP | Rain Bird VBREC12 12 Rectangle Valve Box with Lid | 15 | EA | $0.00 | |
| 1013AQ | Preparation of Dig Permits (PWS 1.7.7) | 25 | EA | $0.00 | |
| 1013AR | Shrub trimming Semi improved areas (PWS 1.7.3) | 100 | EA | $0.00 | |
| 1013AS | Unimproved grounds noxious and invasive species control only. including 330 acres SE of air field (PWS 1.7.4, 1.7.5) | 1892 | ACRES | $0.00 | |
| 1013AT | Weed/vegitation control includes all other hard surfaces (example roads, side walks, curbs, parking lots, gravel roads,etc ) except airfield ramp, taxi way's and runway. (PWS 1.7.4, 1.7.5) | 1060 | ACRES | $0.00 | |
| 1013AU | Aeration all irrigated/non-irrigated improved areas (Sept) (PWS 1.7.8 | 96 | ACRES | $0.00 | |
| Total | $0.00 |
Option Yr 2 (SR)
| GROUNDS MAINTENANCE | |||||
| FA4690-16-R-0001 | |||||
| ATTACHMENT 3, SPECIAL REQUIREMENTS PRICE SCHEDULE | |||||
| OPTION YEAR TWO (2) | |||||
| LINE ITEM NO. (CLIN) | SERVICES DESCRIPTION | QTY | UNIT OF MEASURE | UNIT PRICE | TOTAL |
| 2013 | Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform SPECIAL REQUIREMENTS Maintenance services at Ellsworth AFB SD for the period 01 April 2018 - 31 March 2019 in accordance with the Performance Work Statement (PWS). This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINs (2013AA-2013AU) | ||||
| The Contractor shall upon notification by the Contracting Officer through the issuance of a delivery order, install or upgrade underground irrigation systems. The requirement of this CLIN applies to all subsequent SubCLINs (2013AA-2013AU). | |||||
| 2013AA | Repair 3/4" - 2" Poly Split (avg 20 ft) (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 2013AB | Repair 3/4" - 1" PVC Split (avg 20 ft) (PWS 1.1.4.2) ) | 10 | EA | $0.00 | |
| 2013AC | Repair 1.5" - 3" PVC Split (avg 20 ft) (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 2013AD | Replace 1" or 2" Solenoid (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 2013AE | 1" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 2013AF | 1 1/2" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 2013AG | 2" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 2013AH | 2.5" - 3" Control Valve (PWS 1.1.4.2) | 2 | EA | $0.00 | |
| 2013AJ | Replace Rainbird 5004 Plus Rotary Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 2013AK | Replace Rainbird 1804 Pop-Up Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 2013AL | Replace Rainbird 1804 Nozzle Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 2013AM | Replace Rainbird Falcon 6504 Rotary Head - 2" Poly Split (avg 20 ft) (PWS 1.1.4.2) | 15 | EA | $0.00 | |
| 2013AN | Rain Bird ESP12LXMEF controller | 5 | EA | $0.00 | |
| 2013AP | Rain Bird VBREC12 12 Rectangle Valve Box with Lid | 15 | EA | $0.00 | |
| 2013AQ | Preparation of Dig Permits (PWS 1.7.7) | 25 | EA | $0.00 | |
| 2013AR | Shrub trimming Semi improved areas (PWS 1.7.3) | 100 | EA | $0.00 | |
| 2013AS | Unimproved grounds noxious and invasive species control only. including 330 acres SE of air field (PWS 1.7.4, 1.7.5) | 1892 | ACRES | $0.00 | |
| 2013AT | Weed/vegitation control includes all other hard surfaces (example roads, side walks, curbs, parking lots, gravel roads,etc ) except airfield ramp, taxi way's and runway. (PWS 1.7.4, 1.7.5) | 1060 | ACRES | $0.00 | |
| 2013AU | Aeration all irrigated/non-irrigated improved areas (Sept) (PWS 1.7.8 | 96 | ACRES | $0.00 | |
| Total | $0.00 |
Option Yr 3 (SR)
| GROUNDS MAINTENANCE | |||||
| FA4690-16-R-0001 | |||||
| ATTACHMENT 3, SPECIAL REQUIREMENTS PRICE SCHEDULE | |||||
| OPTION YEAR THREE (3) | |||||
| LINE ITEM NO. (CLIN) | SERVICES DESCRIPTION | QTY | UNIT OF MEASURE | UNIT PRICE | TOTAL |
| 3013 | Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform SPECIAL REQUIREMENTS Maintenance services at Ellsworth AFB SD for the period 01 April 2019 - 31 March 2020 in accordance with the Performance Work Statement (PWS). This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINs (3013AA - 3013AU). | ||||
| The Contractor shall upon notification by the Contracting Officer through the issuance of a delivery order, install or upgrade underground irrigation systems. The requirement of this CLIN applies to all subsequent SubCLINs (3013AA-3013AU). | |||||
| 3013AA | Repair 3/4" - 2" Poly Split (avg 20 ft) (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 3013AB | Repair 3/4" - 1" PVC Split (avg 20 ft) (PWS 1.1.4.2) ) | 10 | EA | $0.00 | |
| 3013AC | Repair 1.5" - 3" PVC Split (avg 20 ft) (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 3013AD | Replace 1" or 2" Solenoid (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 3013AE | 1" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 3013AF | 1 1/2" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 3013AG | 2" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 3013AH | 2.5" - 3" Control Valve (PWS 1.1.4.2) | 2 | EA | $0.00 | |
| 3013AJ | Replace Rainbird 5004 Plus Rotary Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 3013AK | Replace Rainbird 1804 Pop-Up Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 3013AL | Replace Rainbird 1804 Nozzle Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 3013AM | Replace Rainbird Falcon 6504 Rotary Head - 2" Poly Split (avg 20 ft) (PWS 1.1.4.2) | 15 | EA | $0.00 | |
| 3013AN | Rain Bird ESP12LXMEF controller | 5 | EA | $0.00 | |
| 3013AP | Rain Bird VBREC12 12 Rectangle Valve Box with Lid | 15 | EA | $0.00 | |
| 3013AQ | Preparation of Dig Permits (PWS 1.7.7) | 25 | EA | $0.00 | |
| 3013AR | Shrub trimming Semi improved areas (PWS 1.7.3) | 100 | EA | $0.00 | |
| 3013AS | Unimproved grounds noxious and invasive species control only. including 330 acres SE of air field (PWS 1.7.4, 1.7.5) | 1892 | ACRES | $0.00 | |
| 3013AT | Weed/vegitation control includes all other hard surfaces (example roads, side walks, curbs, parking lots, gravel roads,etc ) except airfield ramp, taxi way's and runway. (PWS 1.7.4, 1.7.5) | 1060 | ACRES | $0.00 | |
| 3013AU | Aeration all irrigated/non-irrigated improved areas (Sept) (PWS 1.7.8 | 96 | ACRES | $0.00 | |
| Total | $0.00 |
Option Yr 4 (SR)
| GROUNDS MAINTENANCE | |||||
| FA4690-16-R-0001 | |||||
| ATTACHMENT 3, SPECIAL REQUIREMENTS PRICE SCHEDULE | |||||
| OPTION YEAR FOUR (4) | |||||
| LINE ITEM NO. (CLIN) | SERVICES DESCRIPTION | QTY | UNIT OF MEASURE | UNIT PRICE | TOTAL |
| 4013 | Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform SPECIAL REQUIREMENTS Maintenance services at Ellsworth AFB SD for the period 01 April 2020 - 31 March 2021 in accordance with the Performance Work Statement (PWS). This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINs (4013AA - 4013AU). | ||||
| The Contractor shall upon notification by the Contracting Officer through the issuance of a delivery order, install or upgrade underground irrigation systems. The requirement of this CLIN applies to all subsequent SubCLINs (4013AA-4013AU). | |||||
| 4013AA | Repair 3/4" - 2" Poly Split (avg 20 ft) (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 4013AB | Repair 3/4" - 1" PVC Split (avg 20 ft) (PWS 1.1.4.2) ) | 10 | EA | $0.00 | |
| 4013AC | Repair 1.5" - 3" PVC Split (avg 20 ft) (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 4013AD | Replace 1" or 2" Solenoid (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 4013AE | 1" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 4013AF | 1 1/2" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 4013AG | 2" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 4013AH | 2.5" - 3" Control Valve (PWS 1.1.4.2) | 2 | EA | $0.00 | |
| 4013AJ | Replace Rainbird 5004 Plus Rotary Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 4013AK | Replace Rainbird 1804 Pop-Up Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 4013AL | Replace Rainbird 1804 Nozzle Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 4013AM | Replace Rainbird Falcon 6504 Rotary Head - 2" Poly Split (avg 20 ft) (PWS 1.1.4.2) | 15 | EA | $0.00 | |
| 4013AN | Rain Bird ESP12LXMEF controller | 5 | EA | $0.00 | |
| 4013AP | Rain Bird VBREC12 12 Rectangle Valve Box with Lid | 15 | EA | $0.00 | |
| 4013AQ | Preparation of Dig Permits (PWS 1.7.7) | 25 | EA | $0.00 | |
| 4013AR | Shrub trimming Semi improved areas (PWS 1.7.3) | 100 | EA | $0.00 | |
| 4013AS | Unimproved grounds noxious and invasive species control only. including 330 acres SE of air field (PWS 1.7.4, 1.7.5) | 1892 | ACRES | $0.00 | |
| 4013AT | Weed/vegitation control includes all other hard surfaces (example roads, side walks, curbs, parking lots, gravel roads,etc ) except airfield ramp, taxi way's and runway. (PWS 1.7.4, 1.7.5) | 1060 | ACRES | $0.00 | |
| 4013AU | Aeration all irrigated/non-irrigated improved areas (Sept) (PWS 1.7.8 | 96 | ACRES | $0.00 | |
| Total | $0.00 |
6 Month Extension
| GROUNDS MAINTENANCE | |||||
| FA4690-16-R-0001 | |||||
| ATTACHMENT 3, SPECIAL REQUIREMENTS PRICE SCHEDULE | |||||
| 6 MONTH EXTENSION (IAW FAR CLAUSE 52.217-8) | |||||
| LINE ITEM NO. (CLIN) | SERVICES DESCRIPTION | QTY | UNIT OF MEASURE | UNIT PRICE | TOTAL |
| 5013 | Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform SPECIAL REQUIREMENTS Maintenance services at Ellsworth AFB SD for the period 01 April 2021 - 30 September 2021 in accordance with the Performance Work Statement (PWS). This CLIN is not separately priced; the requirement of this CLIN applies to all subsequent CLINs (5013-5013AU). | ||||
| The Contractor shall upon notification by the Contracting Officer through the issuance of a delivery order, install or upgrade underground irrigation systems. The requirement of this CLIN applies to all subsequent SubCLINs (5013AA-5013AU). | |||||
| 5013AA | Repair 3/4" - 2" Poly Split (avg 20 ft) (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 5013AB | Repair 3/4" - 1" PVC Split (avg 20 ft) (PWS 1.1.4.2) ) | 10 | EA | $0.00 | |
| 5013AC | Repair 1.5" - 3" PVC Split (avg 20 ft) (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 5013AD | Replace 1" or 2" Solenoid (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 5013AE | 1" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 5013AF | 1 1/2" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 5013AG | 2" Control Valve (PWS 1.1.4.2) | 10 | EA | $0.00 | |
| 5013AH | 2.5" - 3" Control Valve (PWS 1.1.4.2) | 2 | EA | $0.00 | |
| 5013AJ | Replace Rainbird 5004 Plus Rotary Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 5013AK | Replace Rainbird 1804 Pop-Up Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 5013AL | Replace Rainbird 1804 Nozzle Head (PWS 1.1.4.2) | 25 | EA | $0.00 | |
| 5013AM | Replace Rainbird Falcon 6504 Rotary Head - 2" Poly Split (avg 20 ft) (PWS 1.1.4.2) | 15 | EA | $0.00 | |
| 5013AN | Rain Bird ESP12LXMEF controller | 5 | EA | $0.00 | |
| 5013AP | Rain Bird VBREC12 12 Rectangle Valve Box with Lid | 15 | EA | $0.00 | |
| 5013AQ | Preparation of Dig Permits (PWS 1.7.7) | 25 | EA | $0.00 | |
| 5013AR | Shrub trimming Semi improved areas (PWS 1.7.3) | 100 | EA | $0.00 | |
| 5013AS | Unimproved grounds noxious and invasive species control only. including 330 acres SE of air field (PWS 1.7.4, 1.7.5) | 1892 | ACRES | $0.00 | |
| 5013AT | Weed/vegitation control includes all other hard surfaces (example roads, side walks, curbs, parking lots, gravel roads,etc ) except airfield ramp, taxi way's and runway. (PWS 1.7.4, 1.7.5) | 1060 | ACRES | $0.00 | |
| 5013AU | Aeration all irrigated/non-irrigated improved areas (Sept) (PWS 1.7.8 | 96 | ACRES | $0.00 | |
| Total | $0.00 |
File details come from the government source that posted it. Updated .