This document contains Questions and Answers (Q&As) related to Solicitation #FA468624R0024 for the Removal and Disposal of Concrete and Asphalt Rubble at Beale Air Force Base (AFB), CA. The solicitation is for non-personal services to remove and dispose of concrete and asphalt rubble from a demolition project on the flight line. The rubble was previously exposed to Aqueous Film Forming Foam (AFFF) which contains Per and polyfluoroalkyl substances (PFAS). The Period of Performance is 2 September 2024 to 2 November 2024. Key details include requirements for DBIDS enrollment, HubZone certification for the Prime contractor, CLIN structure, work hours, truck routes, water source locations, and dust suppression. The Q&As also provide clarity on the proposal submission instructions, including the required volumes and use of the SF1449 for pricing.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers (Q&As) for Concrete & Rubble – FA468624R0024
Q&A’s dated 22 July 2024 Q1: The link in the documents for the pre-enrollment via a smart device is not working. It does open a webpage, but the webpage is blank.
A1: If you run into this issue, please use the following link and be sure to use google chrome https://dbids-global-enroll.dmdc.mil/preenrollui/#/landing-page Q2: If the company that will hold the contract is not a HubZone certified company, can we meet that requirement by utilizing HubZone subcontractors?
A2: No, the Prime must be certified as a HubZone company.
Q3: DBIDS website is asking / requiring a sponsor would that be you? If so I will need your phone number please as well as your email.
A3: Refer to Addendum 52.212-1, Instructions to Offerors and/or sam.gov posting for
Contracting Officer contact info Q&A’s dated 5 Aug 2024
Q1: Can the CLIN Structure be changed to 1 CLIN and the UNIT be TONS?
A1: Reference the Amendment posted on 5 August 2024 with updated CLIN Structure.
Q2: What are the Hours for the Wheatland Gate Vehicle Inspection Area?
A2: 0600-1600 M-F Q3: Will there be specific Truck routes?
A3: Enter base through Wheatland gate. Exit through Wheatland or Schneider gates.
Q4: Where will the closest water source be?
A4: Warren Shingle & J Street Q5: What are the EAL Requirements?
A5: Reference PWS Attachment 1 - PWS Concrete and Rubble dated 15 July 24 Q6: Can we have pictures?
A6: Please see 6 Photos below.
Q7: Is Dust Suppression Needed?
A7: Yes, as required Q8: What is concrete and what is asphalt?
A8: Please see Photos below.
Q9: Will boundaries be clearly outlined that the contractors must work within?
A9: Yes, and will be dictated by environmental prior to work start.
Q10: Is their rebar?
A10: There is some rebar. There was a couple of smaller buildings out at the flightline that might have consist of some tie rebar, but very little. The ramp, the apron did not contain any rebar.
Q11: The Instructions to Offerors refers to two (2) separate Proposal Volumes, but there are three (3) Volumes listed in Table 1- Number & Type of Copies Required on page 3 of the ITO. Later, on page 5 of the ITO under Volume III- Price, the instructions say to use the SF1449 to show the Price. Please confirm that there are only 2 Volumes required and that the Price and Cover Page are to be located in the same volume.
A11: Reference the Amendment, 1_Solicitation Amendment FA4686-24-R-0024-0001 Pages 36-40 for updated volumes, Section A - Proposal Preparation Instructions.
https://dbids-global-enroll.dmdc.mil/preenrollui/#/landing-page
Picture 1 - Asphalt
Picture 2 - Concrete
Picture 3- Concrete
Picture 4- Concrete
Picture 5 - Concrete
Picture 6 - Concrete