SF_30_Amendment_0001.docx

DOCX document 31 KB Posted

Attached to
Repair Interior Finishes Bldg. 418 Federal contract opportunity
Solicitation number
FA466418B0006
Issued by
Department of the Air Force Reserve Command

About this file

SF 30 Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Repair Interior Finishes Bldg. 418, newest first.
File Type Posted
1._New_Gen_Decision_9-07-2018.pdf PDF
Responses_to_RFIs_-_Bldg._418.docx DOCX document
Signed_Site_Visit_Notes_and_Attendance_Sheet.pdf PDF
4._BLDG-418-ASBUILT--PROJ-DWGS.pdf PDF
5._Map_and_Floorplan.pdf PDF
1._Gen_Wage_Decision_8-24-2018.pdf PDF
8._Contractor_Security_Pamphlet.pdf PDF
2._SOW_Repair_Interior_Finishes_Bldg._418_24_Aug2018_(003).docx DOCX document
7._FEP_March_ARB_June_2016_Signed.pdf PDF
SF_1442_-_Solicitation.docx DOCX document
6._Specifications.pdf PDF
3._Schedule_Material_Submittal.xlsx XLSX spreadsheet
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA466418B0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS

No. Description Pages

1. General Decision: CA180036 dated 8/24/2018 9/07/2018 27

1. Statement of Work, Repair Interior Finishes 6 Building. 418 dated 24 Aug 2018

1. Schedule of Material Submittal 1

1. As-builts Drawings (For Reference Only) 3

1. Map and Floorplan (For Reference Only) 2

1. Specifications

0 10 10 General Conditions5
01 14 00 Work Restrictions2
01 30 00 Administrative Requirements2
01 33 00 Submittal Procedures8
01 35 26 Governmental Safety Requirements20
01 45 00.10 20 Quality Control for Minor Construction10
02 82 16.00 20 Engineering Control of Asbestos Containing Materials18
02 82 33.13 20 Removal/Control and Disposal of Paint with Lead15
08 11 13 Steel Doors and Frames10
09 51 00 Acoustical Ceilings12
09 65 00 Resilient Flooring6
09 66 00 Schedule for Finishes2
09 68 00 Carpeting11
09 90 00 Paints and Coatings57
22 00 00 Plumbing, General Purpose7
23 03 00.00 20 Basic Mechanical Materials and Methods6
23 81 00.00 20 Unitary Air Conditioning Equipment10
26 00 00.00 20 Basic Electrical Materials and Methods4

1. March ARB Facility Excellence Plan dated June 2016 66

1. Security Forces Requirements for Prime/Sub-Contractor 10 Representative Pamphlet dated11 Oct 2017

1. Responses to RFIs 1

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it.