SF_30_Amendment_0001.docx
DOCX document 31 KB Posted
- Attached to
- Repair Interior Finishes Bldg. 418 Federal contract opportunity
- Solicitation number
- FA466418B0006
About this file
SF 30 Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1._New_Gen_Decision_9-07-2018.pdf | ||
| Responses_to_RFIs_-_Bldg._418.docx | DOCX document | |
| Signed_Site_Visit_Notes_and_Attendance_Sheet.pdf | ||
| 4._BLDG-418-ASBUILT--PROJ-DWGS.pdf | ||
| 5._Map_and_Floorplan.pdf | ||
| 1._Gen_Wage_Decision_8-24-2018.pdf | ||
| 8._Contractor_Security_Pamphlet.pdf | ||
| 2._SOW_Repair_Interior_Finishes_Bldg._418_24_Aug2018_(003).docx | DOCX document | |
| 7._FEP_March_ARB_June_2016_Signed.pdf | ||
| SF_1442_-_Solicitation.docx | DOCX document | |
| 6._Specifications.pdf | ||
| 3._Schedule_Material_Submittal.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA466418B0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
ATTACHMENTS
No. Description Pages
1. General Decision: CA180036 dated 8/24/2018 9/07/2018 27
1. Statement of Work, Repair Interior Finishes 6 Building. 418 dated 24 Aug 2018
1. Schedule of Material Submittal 1
1. As-builts Drawings (For Reference Only) 3
1. Map and Floorplan (For Reference Only) 2
1. Specifications
| 0 10 10 General Conditions | 5 | |||||
| 01 14 00 Work Restrictions | 2 | |||||
| 01 30 00 Administrative Requirements | 2 | |||||
| 01 33 00 Submittal Procedures | 8 | |||||
| 01 35 26 Governmental Safety Requirements | 20 | |||||
| 01 45 00.10 20 Quality Control for Minor Construction | 10 | |||||
| 02 82 16.00 20 Engineering Control of Asbestos Containing Materials | 18 | |||||
| 02 82 33.13 20 Removal/Control and Disposal of Paint with Lead | 15 | |||||
| 08 11 13 Steel Doors and Frames | 10 | |||||
| 09 51 00 Acoustical Ceilings | 12 | |||||
| 09 65 00 Resilient Flooring | 6 | |||||
| 09 66 00 Schedule for Finishes | 2 | |||||
| 09 68 00 Carpeting | 11 | |||||
| 09 90 00 Paints and Coatings | 57 | |||||
| 22 00 00 Plumbing, General Purpose | 7 | |||||
| 23 03 00.00 20 Basic Mechanical Materials and Methods | 6 | |||||
| 23 81 00.00 20 Unitary Air Conditioning Equipment | 10 | |||||
| 26 00 00.00 20 Basic Electrical Materials and Methods | 4 |
1. March ARB Facility Excellence Plan dated June 2016 66
1. Security Forces Requirements for Prime/Sub-Contractor 10 Representative Pamphlet dated11 Oct 2017
1. Responses to RFIs 1
(End of Summary of Changes) image1.wmf