Material Submittals Schedule

Project Number:
PDPG 170115Project Title:
Repair Interior Finishes Bldg. 418Solicitation / Contract Number: FA466418B0006
Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission Date

fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

Submittal Numbers fergusog: Enter the Submittal Number

Date Contractor
NotifiedContractor Resubmittal

fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date

(MM/DD/YY)

Approved fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date

(MM/DD/YY)

1"City Lights" latex semi-gloss enamel1110 days after NTP
2Vinyl Composite Tile Flooring1110 days after NTP
3Carpet Square Flooring1110 days after NTP
4Acoustical Ceiling Tiles110 days after NTP
5Water Closet110 days after NTP
6Urinal110 days after NTP
7Flush Valves110 days after NTP
8Lavatory - Large Restroom110 days after NTP
9Faucet - Large Restroom110 days after NTP
10Lavatory - Small Restroom110 days after NTP
11Gooseneck Faucet - Small Restroom110 days after NTP
12Toilet Paper Dispenser110 days after NTP
13Liquid Soap Dispenser110 days after NTP
14Door Closures110 days after NTP
15Doors / Door Frames110 days after NTP
16Horizontal Blinds110 days after NTP
17Resilient Base, 4"110 days after NTP
21Electrical Receptacles110 days after NTP
22Electrical Switches110 days after NTP
18VRV ductless ceiling mount cassettes11111110 days after NTP
19VRV Heat Pump11111110 days after NTP
20HVAC control equipment11111110 days after NTP
23
24
25

&"Verdana,Bold"&12Schedule of Material Submittals &"Courier New,Bold"&12Attachment 3 to FA466418B006