Atch_3_-_Schedule_of_Material_Submittals.pdf

PDF 37 KB Posted

Attached to
Repair Airfield Concrete and Asphalt (Taxiway A and Alert Fighter Area)
Solicitation number
FA4664-17-B-0003
Issued by

About this file

Schedule of Material Submittals

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES

FA4664-17-B-0003

Maintenance and Repair of Airfield Concrete and Asphalt

01 33 00 SD-01 Preconstruction Submittals

1.5 GSubmittal Register

1.6 GConstruction Progress Schedule

SD-07 Certificates

1.6 GMonthly Updates

01 35 26 SD-01 Preconstruction Submittals

1.6 GAccident Prevention Plan (APP)

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan 01 57 19 SD-01 Preconstruction Submittals

1.6 GEnvironmental Protection Plan

3.2.1.1.2Laboratory Analysis

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

SD-07 Certificates GWaste Shipment Records

32 01 11.51 SD-01 Preconstruction Submittals

1.2 GSchedule of work

3.1 GPaint Removal Process Plan

3.4 GWaste Collection, Identification

and Disposal Plan SD-03 Product Data

1.4Mechanical paint removal equipment

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

1231815305C Typewritten Text

1231815305C Typewritten Text Attachment 3 to

FA4664-17-B-0003

1231815305C Typewritten Text

1231815305C Typewritten Text

1231815305C Typewritten Text

1231815305C Typewritten Text

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES

Maintenance and Repair of Airfield Concrete and Asphalt

32 01 11.51 1.5Test Section Results 32 01 17.61 SD-03 Product Data

3.3Installation of Sealant SD-06 Test Reports

1.3Laboratory Tests 32 01 19 SD-01 Preconstruction Submittals

3.1 GEquipment List

SD-03 Product Data

2.3 GBacker Rod

2.1 GJoint Sealant

32 01 29.61 SD-03 Product Data

2.1.4 GRigid Proprietary Repair Products

2.1.1.1 GPigmented Liquid

Membrane-Forming Compound SD-07 Certificates

2.1.4Rigid Proprietary Repair Products 2.1.1.1Pigmented Liquid

Membrane-Forming Compound 32 12 36.13 SD-03 Product Data

1.3Equipment List Inspection Reports

SD-06 Test Reports 3.3.1Tests

SD-07 Certificates

2.1 GCertificate Of Compliance With

Listed Standards

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

1231815305C Typewritten Text Attachment 3 to

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES

Maintenance and Repair of Airfield Concrete and Asphalt

32 17 23 SD-03 Product Data

2.1.1 GSurface Preparation Equipment

List

2.1.2 GApplication Equipment List

3.2Exterior Surface Preparation

SD-06 Test Reports

2.2.4.1 GReflective Media for Airfields

2.2.1 GWaterborne Paint

2.2.2 GThermoplastic Compound

3.3.2 GThermoplastic Compound

3.4.1Test Reports

SD-07 Certificates

1.3.2 GQualifications

2.2.4.1Reflective Media for Airfields 2.2.1Waterborne Paint

1.3.1 GVolatile Organic Compound

2.2.2Thermoplastic Compound 3.3.2Thermoplastic Compound

SD-08 Manufacturer’s Instructions

2.2.1 GWaterborne Paint

2.2.2 GThermoplastic Compound

3.3.2 GThermoplastic Compound

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

1231815305C Typewritten Text Attachment 3 to

File details come from the government source that posted it. Updated .