Amendment_0003.doc

DOC document 42 KB Posted

Attached to
Repair Airfield Joint Sealant at March ARB CA
Solicitation number
FA4664-15-R-0011
Issued by

About this file

SF30 - Amendment 0003

View the file

Other files

File Type Posted
Atch_5_-_Specification_Table_of_contents.doc DOC document
Atch_7_-_Q A.doc DOC document
Atch_2_-_SOW_Joint_Sealant_16_September_2015.doc DOC document
FA4664-15-R-0011.doc DOC document
FA4664-15-R-0011_Amend_0002.doc DOC document
Atch_1_-_General_Decision_Number_CA1500036_dated_9-4-15.doc DOC document
Site_Walk_Notes.pdf PDF
FA4664-15-R-0011_Amendment_0001.doc DOC document
FA4664-15-R-0011.doc DOC document
Atch_5_-_Specifications.zip ZIP file
Atch_6_-_Security_Pamphlet_-_1_October_2014.doc DOC document
Atch_2_-_SOW_Joint_Sealant_2July_2015.doc DOC document
Atch_3_-_Schedule_of_Material_Submittals.xls XLS spreadsheet
Atch_1_-_General_Decision_Number_-_07-31-11.doc DOC document
Atch_4_-_Drawings.zip ZIP file
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 21-Sep-2015 02:00 PM to 22-Sep-2015 02:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from The contractor shall provide all equipment, materials, transportation, labor, management and other incidentals necessary to perform Statement of Work, Airfield Joint Sealant Repairs, dated 2 July 2015, in accordance with Attachment 5 specifications to The contractor shall provide all equipment, materials, transportation, labor, management and other incidentals necessary to perform Statement of Work, Airfield Joint Sealant Repair, dated 16 September 2015, in accordance with Attachment 5 specifications.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

LIST OF ATTACHMENTS

No.

Description

Pages

1 General Wage Decision CA150036 dated 07/31/2015 09/04/2015

2 Statement of Work dated 2 July 2015 16 September 2015

3 Schedule of Material Submittals

4 Drawing dated 7 Jul 15 and 10 Aug 77

5 Specifications

01 01 00 – General Conditions 06/06

01 22 00.00 10 – Measuremet and Payment

01 33 00 – Construction Submittal Procedures

01 33 23 – Samples and Shop Drawings

01 35 26 – Government Safety Requirements

01 45 10 – Contractor Quality Control

01 50 02 – Temporary Construction Facilities

01 57 20 – Environmental Protection

01 74 19 – Construction Waste Management

01 78 00 – Closeout Submittals

02 41 00 – Demolition

02 61 13 – Excavation and Handling of Contaminated Materials

03 30 04 – Concrete for Minor Structures

32 91 19 – Field Molded Sealants for Sealing Joints in Rigit Pavement

32 01 26.71 – Grooving for Airfield Pavements

32 01 28 – Paterial-Depth Patching of Rigid Pavement

32 13 11 – Concrete Pavement for Airfields and Other Heavy Duty Pavements

32 13 73 – Compression Joint Seals for Concrete Pavements

6 Security Forces Requirements for Prime/Sub-Contractor

Representatives Pamphlet dated 1 October 2014

Questions and Answers dated 16 September 2015

(End of Summary of Changes)

File details come from the government source that posted it. Updated .