This document is a Solicitation Questions and Answers (Q&A) for a B7115 Roof Sealant project issued by the Air Force on 19 AUG 2025, with solicitation number FA466125R0006. The project involves applying an aluminized polyurea roof coating to an existing R-panel metal roof with two distinct sections (approximately 11,000 sq. ft. built around 1960 and 7,000 sq. ft. added in 1981). Key requirements include an 80-mil dry film thickness, a 15-year warranty, and specific surface preparation procedures. The government emphasizes using the Statement of Work (SoW) required materials and is open to alternative roofing systems like Spray Polyurethane Foam (SPF) if technical equivalency can be demonstrated.

The solicitation provides detailed guidance on proposal submission, including requirements for a cover page, technical and pricing volumes, and joint venture documentation. Contractors must provide a bid bond and complete all solicitation sections. The project scope includes removing non-operational evaporative coolers, ensuring weathertightness, and following manufacturer's surface preparation recommendations. The estimated construction budget ranges from $250,000 to $500,000, with a site visit scheduled for 13 August 2025. The Air Force Installation Contracting Center (AFICC) is managing the contract, and there is no incumbent contractor for this specific task order.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19 AUG 2025

FA466125R0006

B7115 ROOF SEALANT SOLICITATION QUESTIONS AND ANSWERS

1.Can the government clarify whether alternative roofing systems, such as SprayPolyurethane Foam (SPF), would be considered acceptable in place of the specifiedaluminized polyurea system?

Answer: Any substitution requests need to be accompanied by technical information describing how the substitution exceeds the specification ASTM material testing results of polyurea.

Compare and contrast the SoW required polyurea system vs the proposed substitute. How does the proposed substitute hold up to our specific climate and active airfield environment.

Proposals should respond to the required materials of the SoW.

2.If SPF is allowed as an alternative, would the system need to meet the same 80-milminimum dry film thickness requirement as the specified polyurea system?

Answer: Application thickness may be system specific and would need to be evaluated by case.

3.What are the minimum R-value or energy efficiency expectations, if any, for the roofsystem?

Answer: There are no expectations for the roof coating material to provide additional insulation properties to the facility

4.Is a primer required for the polyurea coating application on this R-panel metal roof, orshould the contractor follow the coating manufacturer’s recommendations?

Answer: Primers may be required by manufacturer’s recommendations. It is recommended to follow all manufacturers’ surface prep instructions to achieve best possible bond with the existing roof system.

5.Will the government entertain a formal request for substitution based on equal or betterperformance, so long as the warranty and durability criteria match or exceed the specifiedsystem?

Answer: The Government will accept substitution requests and evaluate the proposed systemsagainst the published requirements of the prescribed system.

For the purposes of this solicitation, provide the materials required by the SoW.

6. Are there any historical concerns or specific reasons why polyurea was selected over other coating technologies for this facility?

Answer: The prescribed system provides desirable characteristics that hold up well in our specific environment, including, but not limited to: durability, longevity, chemical resistance, extreme climate conditions, FOD resistance, and weather.

7. For the upcoming site visit scheduled on August 13, 2025, will technical personnel such as the building engineer or a roofing consultant be available on-site to answer specification or product substitution questions?

Answer: Contracting officials, construction inspection officers and the Base Architect will be in attendance. All questions should be submitted in writing to the contracting officer. Responses will be sent by the Contracting Officer to all interested contractors to ensure fairness.

8. Would the government accept the addition of an Aliphatic Urethane topcoat over the specified 80-mil polyurea system in order to satisfy the 15-year warranty requirement?

Answer: Yes, if this is a requirement of the manufacturer in order to achieve the required warranty, it would be allowed.

9. It states that the proposal needs a cover page on company letterhead. What information needs to be on the cover page?

Answer: Yes, required on company letterhead with but not limited to: Solicitation Number, Project Title, Company Name, Address, Contact Person, Email, Phone, and Submission Date.

10. Can the cover page, Volume I (Technical) and Volume II (Pricing) all be in the same document as long as it's in separate sections?

Answer: Yes, sections can be in one document, but CLEARLY separate and labeled.

11. It states that we need to have proof of capability to obtain bonds. Will the bid bond suffice?

Or is a reference letter from the bid bond company needed?

Answer: Bid bond is required. If selected for this requirement you will provide a Bid Bond from your insurance company.

12. What pages on Sections I-K need to be completed? If we provide our SAM.gov registration, will that suffice?

Answer: Complete ALL pages and sections as instructed in the solicitation. "Not Applicable" is acceptable if justified.

13. Do Joint Venture documents need to be in Volume I (Technical) or Volume II (Pricing)?

Answer: Joint Venture: JV documents go in Volume I (Technical)

14. Who is the Incumbent?

Answer: No Incumbent.

15. Past Contract Award:

Answer: (FA800320D0038): The Air Force Installation Contracting Center (AFICC) mandated Roofing Repair, Replacement, and Maintenance (R3M) contract

16. Has the budget been approved for this contract?

Answer: We have the authority to solicit.

17.Is there another scheduled site visit day, date and time?(Q) (besides 13 August 2025 at 9:00 AM CST)? No.

18.Do you have the pricing template in Excel, pdf or another form to submit back in a clean format?

Answer: Please see the attachment titled “25-0144 7115 Pricing Schedule.pdf” on SAM.gov.

19. Has an asbestos test been done on the existing built-up roofs, and what are the results?

Answer: No hazardous materials testing has been conducted.

20.Who is providing the environmental monitor while tearing off? Is this required?

Answer: There is zero tear off for this. This is a roof coating project.

21.Who is providing dumpsters?

Answer: The Contractor is responsible for providing all materials necessary to execute the SoW.

22.Who is providing bathroom facilities?

Answer: The contractor is responsible for providing temporary restroom facilities for contractor’s employees.

23.Who is to paint existing fascia and soffit? GC or Harrison Roofing Co.?

Answer: Please Elaborate. There is no requirement in this SoW to paint existing Fascia.

24.Some buildings call to provide new insulated curbs. Is this for A/C units, exhaust fans? Or does this mean to re-insulate existing curbs.

Answer: The requirement is for a single B7115. There is no requirement for new curbs. Refer to SoW.

25.Are we to remove replace roof hatches if the existing is hatch is functional?

Answer: 7 CES is unaware of any roof hatches on B 7115

26.Does 'replace roof ventilators' refer to power vents, exhaust fans for kitchens and bathrooms, or other specialty vents?

Answer: There is no requirement to replace roof ventilators.

27.Some plans call to relocate plumbing vents. Is the plumbing contractor hired by Oasis, JOC contractor, or Harrison Roofing Co.?

Answer: The requirement is for a single B7115. There is no requirement to relocate plaumbing vents.

28.Is it the responsibility of the roofing contractor to remove the roof top unit, install new metal curb, and reinstall the unit? Currently sitting on 4"x4" wood blocks.

Answer: The evap coolers are non-operational. Remove from the roof, and cap the associated duct work prior to their entry into the building. Ensure weathertightness.

29.Is there access to water on site or base?

Answer: There may be water hydrants on the exterior walls of B7115

30.Membrane Color: Membrane color selection will be made from manufacturer’s standard colors, the color chart to be submitted to the Contracting Officer. (Aluminized polyurea is gray/silver.) Will a 4"x4" sample satisfy this requirement?

Answer: A 4”x4” material sample provided in the material submittal process would suffice.

31.Have you considered changing the specification to a complete metal roof replacement rather than coating the existing 44–65-year-old R-panel roof with urethane after extensive surface preparation and repair? Given the age and degradation, full replacement may be more cost-effective in the long term.

Answer: for the purpose of this task order, provide SoW required materials

32. If the total cost can be kept within the stated magnitude of construction ($250,000–$500,000) and still include the binary urethane coating specifications, would you consider rewriting the specification to allow for full R-panel replacement in lieu of major surface preparation?

Answer: for the purpose of this task order, provide SoW required materials

33. If the above is acceptable, would you still require a reflective binary urethane coating (as specified in the SOW) on top of the new R-panels

Answer: for the purpose of this task order, provide SoW required materials

34. If full replacement is not acceptable, at what percentage threshold of deteriorated R-panels would you consider requiring total replacement

Answer: replacement of roof panels is not a part of this SoW

35. Pressure washing appears problematic given the roof condition and risk of interior leaks.

Would you accept low-pressure washing with surfactant and wire-brushing rusted areas in place of high-pressure washing?

Answer: The actual surface prep process is part of means and methods, and subject to contractor preference/determination. The requirement is for surface prep to meet manufacturer’s requirements. Yes, it would be acceptable to the Government, if acceptable to the product manufacturer.

36. Given that wire-brushing could lead to “burn through” of the metal substrate, would you prefer replacement of rusted and damaged panels instead of surface preparation in such cases?

Answer: panel replacement is not part of this SoW.

37. The skylight area shown in the plan set appears in photos to actually be R-panels installed over previous skylight openings. Can you confirm whether these are true skylights or simply metal panels covering former skylight holes?

Answer: The skylights are/were scheduled for replacement with metal panels by 7 CES prior to the start of this contract.. It is unknown to the Base Architect if this has yet to be accomplished.

38. The product specification repeatedly specifies an “aluminized” finish. Would you consider other reflective finishes (e.g., white or off-white) as acceptable alternatives, or is aluminized strictly required?

Answer: The SoW requirement is for Aluminized Polyurea.

39. Several evaporative coolers appear severely corroded. If they cannot feasibly be detached and reset due to their compromised condition, will you require their replacement?

Answer: The evap coolers are non-operational. Remove from the roof, and cap the associated duct work prior to their entry into the building. Ensure weathertightness.

40: Will you publish a copy of the sign-in sheet from the August 13, 2025, site visit?

Answer: Yes, it will be published with answers.

41. R-panel comes in varying corrugation profiles. Can you provide the depth of corrugation and the width of the valleys and ribs/crests for the specified R-panel roofing?

Answer: The site visit provided the opportunity to collect that specific information.

42. There appear to be two distinct sections of roofing: approximately 11,000 sq. ft. (older) and 7,000 sq. ft. (newer). Can you confirm that the larger section was built around 1960 and the smaller section was added in 1981?

Answer: Correct.