Site Visit Questions and Answers.pdf

PDF 100 KB Posted

Attached to
Install of Electrical Equipment to Power Forklift Battery Charger
Solicitation number
FA466125Q0187
Issued by

About this file

This document is a Site Visit Questions and Answers document detailing specifics about a project involving a battery charger installation. Key details include the requirement to anchor the battery charger into the ground, a site ceiling height of approximately 27 feet, and the need for rigid conduit installation only on the building's exterior. Additional site logistics specify that the Government will clear the site prior to contract performance start date, and the contractor will be responsible for drilling through one wall to route conduit and subsequently patching any holes created. The mechanical room is located around the corner from the site location, behind a fenced area, as noted in accompanying site photographs.

View the file

Other files

File Type Posted
Questions and Answers.pdf PDF
FA466125Q01870001 RFQ.pdf PDF
Breaker Panel Pictures.pdf PDF
Battery Charger Pictures.pdf PDF
FA466125Q0187 RFQ.pdf PDF
1. FAR Provisions and Clauses.pdf PDF
3. Battery Charger Technical Information.pdf PDF
2. Statement of Work.pdf PDF
4. Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Visit Questions and Answers:

1. Q: Does the battery charger need to be anchored into the ground?

A: Yes

2. Q: What is the ceiling height of the site?

A: Approximately 27 feet

3. Q: Will rigid conduit be required?

A: Yes, only on the outside of the building

Additional information from the site visit: Photos of the site location have been attached. The first photo is where the battery charger will be situated. All items will be cleared from the site by the Government prior to contract performance start date. There is one wall between the site and the mechanical room that likely need to be drilled through to route the conduit. Any holes made in the wall will require patching by the contractor. From the outside of the building, the mechanical room is situated around the corner from the site location, behind the fenced area, as noted in the pictures.

File details come from the government source that posted it. Updated .