Attachment 7 Questions and Answers 2.pdf
PDF 140 KB Posted
- Attached to
- 7 SFS Vindicator Federal contract opportunity
- Solicitation number
- FA466125Q0015
About this file
This document is a Questions and Answers Amendment 2 file that addresses technical queries related to the installation of a Honeywell Vindicator Alarm System for the 7th Security Forces Squadron.
The document clarifies three main areas: (1) User enrollment will require a VST Terminal operating on Windows 10, which needs to be added to the equipment list for 7 SFS; (2) The contractor is responsible for providing the switch and Uninterruptible Power Supply (UPS), which will be included in an updated equipment list; and (3) The contractor must provide the dedicated power circuit for IT equipment cabinets, with confirmation that open circuits are available within 50-100 feet of the equipment rack for an electrician to utilize. The contractor may subcontract the electrical work if needed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA466125Q0015P00002 RFQ amendment 2 revised final.docx | DOCX document | |
| Attachment 8 Updated Equipment List.pdf | ||
| FA466125Q0015P00001 RFQ revised with attachment.docx | DOCX document | |
| Attachment 6 Answers to Questions.pdf | ||
| Attachment 1- FAR Provisions and Clauses 7 SFS Vindicator.pdf | ||
| Attachment 2 - SOW.pdf | ||
| Attachment 4 - 7 SFS Armory Equipment List.pdf | ||
| Attachment 3- JA Vindicator.pdf | ||
| Attachment 5 - 7 SFS Floor Plan.pdf | ||
| FA466125Q0015 RFQ.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers: Amendment 2
1. How is the government planning on enrolling users for the access control?
Answer: There is no enrollment station and there is no security system terminal requested on the equipment list. This shall come with a VST Terminal that is operated o of windows 10 to enroll users.
Following Question: There is no VST Terminal requested on the equipment list. Should we add one?
Yes, 7 SFS will be needing one to enroll users.
2. Is the government providing the requested switch and Uninterruptible Power Supply (UPS)?
Answer: The contractor shall provide this. This equipment listing is quoted.
Following Question: There is nothing on the equipment list for a switch or UPS?
With the updated equipment list that will include it.
3. Is the government providing the dedicated power circuit to serve the IT equipment cabinets?
Answer: The contractor provides this. They may subcontract it out to help them out.
Following Question: Are there open circuits which are within 50-100’ft of the equipment rack that we could have an electrician run to the equipment?
Yes