Questionandanswer.pdf

PDF 91 KB Posted

Attached to
Airfield FOC Upgrade Federal contract opportunity
Solicitation number
FA466123Q0056
Issued by
Department of the Air Force Global Strike Command

About this file

This document contains questions and answers related to solicitation number FA466123Q0056 for an Airfield FOC Upgrade opportunity with the Department of the Air Force Global Strike Command. The questions and answers address key details in the solicitation including that drawings in the SOO have covered legends to protect information according to 38/ES rules, with symbols and lines denoting existing and new infrastructure elements. Approximate footages are provided in paragraph 2.2.4.2 of the SOO, and the contractor will be responsible for sourcing materials according to paragraph 2.2. Pre-existing conduit is noted to be 4 inches, with references to 4 inch or 2 inch conduit at various locations in the SOO. No further specifics on required products or services, pricing terms, or response dates are included in this question and answer document.

View the file

Other files for this federal contract opportunity

Other files attached to Airfield FOC Upgrade, newest first.
File Type Posted
QA 082423.pdf PDF
Bldg 4300 14-0077 - Limited Asbestos Survey 4300.pdf PDF
QA FA446123Q0056.pdf PDF
Bldg 9001 Asbestos Survey (Dec 2017).pdf PDF
Bldg 4300 - Limited Asbestos Survey 4300 - 2018.pdf PDF
SOO-FSS Airfield Copper to Fiber Upgrade REVISED.pdf PDF
RFQ COMBO.pdf PDF
QuestionandAnswer.pdf PDF
Attachment 3 7CS FOC Upgrade J and A fully signed.pdf PDF
Attachment 1 Provisions and Clauses.pdf PDF
Attachment2 52.212-5.pdf PDF
Attachment 4 SOO FSS Airfield Copper to Fiber Upgrade ATCALS.pdf PDF
RFQ COMBO.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question:

1. All drawings in the Dyess SOO have the key/legend covered with note boxes, which prevents us from exactly deciphering all the routing highlights. Can you repost the drawings that “reveal” the keys/legends?

2. What is the total footage?

3. Who is sourcing the material?

4. What is the size for the conduit?

Answer:

1. The document is protected by 38/ES. The drawings cannot be edited.

This is the information on the drawings:

Yellow cross – denotes manholes

Blue/Green symbols – denote buildings

Black – denotes existing infrastructure/conduit red lines – denotes new infrastructure/conduit

2. Approximate footages are provided in the SOO. Please reference para 2.2.4.2.

3. The contractor is responsible. Please reference paragraph 2.2 of the SOO.

4. Pre-existing conduit is 4”. Remaining references to “4 or 2” conduit are noted at various places within the SOO.