Initial_Q&A.docx

DOCX document 13 KB Posted

Attached to
SABER
Solicitation number
FA4661-17-R-0002
Issued by

About this file

Initial Q&A

View the file

Other files

File Type Posted
Amendment_02.pdf PDF
9203_Plan - Kyle Smith Porch Design.dwg DWG drawing
05700023.zip ZIP file
Dyess_9203_1.dwg DWG drawing
6501617C.zip ZIP file
Dyess_9203_2.dwg DWG drawing
09300080.zip ZIP file
22_May_Q&A.docx DOCX document
Dyess_AFB_SABER_Questions_and_Answers.docx DOCX document
AMENDED_SABER_SOW.pdf PDF
Attachment_5_-_SABER_Pricing_Schedule_AMENDED.xlsx XLSX spreadsheet
Amendment_01.pdf PDF
Attachment_4_-_PPQ.pdf PDF
Attachment_3_-_Question_Submission_Form.doc DOC document
Attachment_8_-_Wage_Determination.pdf PDF
Attachment_6_-_SABER_SOW_(Revised).pdf PDF
06._FA4661-17-R-0002_(20_Apr).pdf PDF
Attachment_7_-_Site_Visit_Registration_Form.doc DOC document
Attachment_1_-_SABER_Technical_Specifications.pdf PDF
Attachment_9_-_Past_Performance_Information_Document.docx DOCX document
2014_Renovations_Bldg_9203.pdf PDF
Attachment_5_-_SABER_Pricing_Schedule.xlsx XLSX spreadsheet
Attachment_2_-_Sample_Project_Bldg_9203.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page

Section
Para

Question

SOW

C302.3.7.2
2D
States that all abatement activities will be paid as “non-pre priced items, however, page 18 section C302.3.9 states different, see next question.

CE Response (4-26-17): Delete paragraph C302.3.7.2; d. Use C302.3.9 for asbestos pricing.

SOW

C302.3.9

States that all abatement activities is a pre-priced item yet page 17 section C302.3.7.2, para. 2D states different. Which is correct?

CE Response (4-26-17): Delete paragraph C302.3.7.2; d. Use C302.3.9 for asbestos pricing.

SOW

C302.3.1

Please clarify which RS Means book is to be utilized for pricing. E.g. Is the Facilities Construction book to be used and only if no line item is found? Are the other Means books to be utilized?

CE Response (4-26-17): 4Clicks estimating software shall be used for all pricing using the R.S Means Computerized Pricing Guide. All other Means books shall be used for pricing reference for non-typical work.

Solicitation

The overall magnitude of this contract reads between 25 million and 100 million, however, page 87, see below, states otherwise.

Cons Response: $25 Million is the total contract ceiling.

Solicitation

Page 23 lists the maximum contract value of 25 million, however, page 1, see above entry, states otherwise. Which is correct?

Cons Response: $25 Million is the total contract ceiling.

Solicitation

L
6.1
Page 73 makes it seem that a volume is required for this but it is not mentioned in the 4 volumes required. Please clarify.

Cons Response: Volume IV Price & Administrative documents is a required volume per section 2.2, pg 65