Attachment_2_-_Sample_Project_Bldg_9203.pdf

PDF 150 KB Posted

Attached to
SABER
Solicitation number
FA4661-17-R-0002
Issued by

About this file

Attachment 2 - Sample Project Bldg 9203

View the file

Other files

File Type Posted
Amendment_02.pdf PDF
9203_Plan - Kyle Smith Porch Design.dwg DWG drawing
Dyess_9203_1.dwg DWG drawing
6501617C.zip ZIP file
Dyess_9203_2.dwg DWG drawing
09300080.zip ZIP file
22_May_Q&A.docx DOCX document
05700023.zip ZIP file
Dyess_AFB_SABER_Questions_and_Answers.docx DOCX document
AMENDED_SABER_SOW.pdf PDF
Attachment_5_-_SABER_Pricing_Schedule_AMENDED.xlsx XLSX spreadsheet
Amendment_01.pdf PDF
Initial_Q&A.docx DOCX document
Attachment_4_-_PPQ.pdf PDF
Attachment_3_-_Question_Submission_Form.doc DOC document
Attachment_8_-_Wage_Determination.pdf PDF
Attachment_6_-_SABER_SOW_(Revised).pdf PDF
Attachment_1_-_SABER_Technical_Specifications.pdf PDF
Attachment_9_-_Past_Performance_Information_Document.docx DOCX document
2014_Renovations_Bldg_9203.pdf PDF
Attachment_5_-_SABER_Pricing_Schedule.xlsx XLSX spreadsheet
06._FA4661-17-R-0002_(20_Apr).pdf PDF
Attachment_7_-_Site_Visit_Registration_Form.doc DOC document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Repair Bldg 9203 Entrances 14 July 2016 FNWZ 14-0074

Statement of Work (SOW)

PROJECT TITLE: REPAIR BUILDING 9203 ENTRANCES

PROJECT NUMBER: FNWZ 14-0074

TYPE OF WORK: Repair (524 monies)

POINTS OF CONTACT:

(1) BCE Representative: Mr. Patrick Rolan, 7 CES/CENMP, (325) 696-4210

(2) Using Agency: Ms. Sue Pecoraro, AFOSI, (325) 696-2296

(3) Contracting:

Mr. Ernest Slatinsky, AFOSI, ( 325) 696-2296 Capt Hilary Ince, 7 CONS/LGCA, (325) 696-2272

1.1 PROJECT DESCRIPTION: The SABER Contractor (hereinafter referred to as “Contractor”) shall prepare a Proposal for repair of two entrances at Building 9203.

1.2 ATTACHMENT LIST:

Attachment A: As-built Floor Plan for Bldg 9203

• 2014 Renovations Bldg 9203.dwg & pdf

Attachment B: Performance Objectives

1.3 SCOPE OF WORK:

1.3.1 Remove exterior vestibule, framing, glazing, ceiling, lighting, tile flooring, tile grout, and HVAC. Existing porch & overhang is existing to remain, unless noted otherwise. Cap existing HVAC lines & patch masonry as required to match existing.

1.3.2 Provide painted metal coverplates for thermostat, intercom, & telephone.

1.3.3 Change existing vestibule wall convenience outlet to a GFCI protected outlet with cover.

1.3.4 Sawcut & remove exterior porch concrete at two doors to provide an Architectural Barriers Act (ABA) compliant entrance into the OSI & Wing Safety doorways.

1.3.5 Provide new dark bronze aluminum framed 3’-0”x7’-0” entrance vestibule door, sidelights, & transom inside the OSI corridor creating a new interior vestibule. Framing & doors shall match existing to remain in size & style. Coordinate dimensions with existing fire alarm panel & field measurements. Framing shall be from floor to ceiling, wall to wall. Provide overhead framing & wall bracing as required to stabilize the new opening. Rotate existing light fixture into an adjacent ceiling grid. Cut & repair existing ceiling grid & tile as required for new work. Provide new 2x2 lay-in ceiling tile to match existing in newly created vestibule.

Provide hold down clips on all new ceilings. Provide removable Best core in new opening with thumb turn on interior. Provide Norton 1600 series painted parallel arm closer. Relocate existing telephone & intercom into existing system in the new interior vestibule.

1.3.6 Sawcut & remove damaged exterior porch concrete at NW corner of building. Reinstall new concrete to match existing finish, control joints, & reinforcing.

1.3.7 Clean existing covered porch to building control joint of all debris. Provide backer rod & sealant for entire porch to building control joint.

1.3.8 Provide ABA compliant handrails & railing at West end of building’s ramp (“L” shape area only). Embed railing(s) in concrete footings. Provide handrail mounted to building where applicable. All railing & handrails shall be painted schedule 40 pipe with all edges ground smooth. Rout & seal damaged sidewalk at drain location.

1.3.9 Wash down and clean up all areas of demolition & new construction and other debris created by this work.

1.3.10 Provide specified drawings and documentation.

1.4 GENERAL REQUIREMENTS:

1.4.1 Design, materials, equipment, and installation shall be in accordance with the requirements of the listed codes and standards identified herein.

1.4.2 The Contractor is responsible for field survey; and for verifying all information provided herein an on the attached original construction drawing. The Contractor is also responsible for obtaining all information necessary to properly design and provide all work. Gathering information during design shall be coordinated through the Contracting Officer or Contract Administrator. The Contractor shall be responsible for coordination of project work activities with the Contracting Officer that would interrupt or limit the on-going daily activities in the facility. Any survey required to verify existing features, etc., shall be the responsibility of the Contractor.

1.5 SPECIFICATIONS AND MANUFACTURER’S RECOMMENDATIONS:

Contractor shall design and perform all work in accordance with the SABER Specifications and the manufacturer’s recommendations for each product used in the project.

1.6 EXISTING FACILITY DRAWINGS:

All available existing facility drawings will be provided by the Government as electronic images as listed herein.

All existing site, utility, facility conditions and dimensions indicated in the Government provided drawings shall be field verified by Contractor.

1.7 DIRECTION:

The Contractor shall accept directions only from the Dyess AFB Contracting Officer (CO). Requests or desires of the users or using agency made directly to the Contractor shall be immediately brought to the attention of the CO.

Any changes to the project scope or other provisions of the SOW must be authorized in writing by the CO.

1.8 DESIGN CRITERIA:

Design shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Engineering Technical Letters (ETL’s), HQ ACC Standard and all applicable regulations/codes. Applicable design criteria include, but are not limited to the following:

Edited Dyess specifications

Various Government and commercial criteria standards available in the Construction Criteria Base library (www.ccb.org)

Other applicable regulations and manuals Air Force Directorate of Departmental Publications Resources (www.e-publishing.af.mil)

Attachment “A”: Original Construction Design Drawings for Building 9203

• 2014 Renovations Bldg 9203.dwg – CAD file of existing floor plan

• 2014 Renovations Bldg 9203.pdf – Plan & notes indicating locations of proposed demolition, renovation, & new construction.

1392454892C Callout Remove existing vestibule, framing, flooring & ceiling, etc.

1392454892C Callout Existing door & frame to remain.

1392454892C Callout Proposed aluminum door, frame, sidelight, & transom.

1392454892C Callout Concrete repair area.

1392454892C Callout Provide new ABA compliant painted steel railing & handrails.

1392454892C Callout Provide new concrete sloped ramp to comply with ABA

1392454892C Line

1392454892C Typewritten Text Floor Plan Not to scale

Attachment “B”: Performance Objectives

ATTACHMENT B – PERFORMANCE OBJECTIVES

1. PERFORMANCE OBJECTIVES: The contractor’s proposal shall address each of the following Performance Objectives in a narrative describing in detail the understanding of the Statement of Work; and listing any exceptions to the SOW included in the Schedule of Items:

Performance Objective Current Brand

Criteria

1. Remove existing exterior vestibule. Not Available

2. Install 2 accessible entrances. N/A ABA

3. Provide new interior vestibule & framing at OSI corridor.

N/A ANSI / BHMA

4. Repair damaged porch concrete. N/A ACI

5. Provide accessible railing at existing entrance ramp.

N/A ABA

6. Provide drawings & documentation. N/A SABER Specifications

14-0074 Statement of Work-Revised for SABER 7-14-2016
14-0074 Performance Objectives (7-19-16)
14-0074-Bldg 9203 Floor Plan (7-19-16)

File details come from the government source that posted it. Updated .