SABER Attachment 1 Statement of Work (SoW)

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requiremnts Contract, newest first.
File Type Posted
SABER Q A.pdf PDF
Tye Slide Gate 02- 10-12-09.JPG JPG image
Tye Slide Gate 03- 10-12-09.JPG JPG image
Tye Slide Gate 01- 10-12-09.JPG JPG image
Tye Slide Gate 04- 10-12-09.JPG JPG image
11-0052 SOO Concept Drawings —
11-0052 SOO Concept Drawings —
05-0032 09-0106 SOO Atch 02 - RD7422.DWG DWG drawing
05-0032 09-0106 SOO Atch 01 - Concept Drawings —
05-0032 09-0106 SOO.pdf PDF
SABER SoW Technical Exhibit 10 - DAFB Technical Specifications Revised Feb 10.pdf PDF
SOO Atch 7 UFC Part 2 - UFC 3-600-01 - DESIGN-FIRE PROTECTION ENGINEERING FOR FACILITIES.pdf PDF
SABER SoW Technical Exhibits 1 - 9.pdf PDF
FA4661-11-R-0001-0001 —
Schedule of Wage Rates.pdf PDF
SOO Atch 7 UFC Part 1 - General Building Requirements.pdf PDF
SABER Seed Proj 1.pdf PDF
SABER Seed Proj 2.pdf PDF
SOO Atch 7 UFC Part 4 - DoD Security Engineering Facilities Planning Manual.pdf PDF
SOO Atch 7 UFC Part 3 DoD Minimum Aniterrorism Standards for Buildings.pdf PDF
Dyess SABER Pre Poposal Conference Reservation Form.pdf PDF
Dyess SABER Seed Project.pdf PDF
Dyess SABER Question Form.pdf PDF
Dyess SABER Solicitation Past Performance Questionnaire.pdf PDF
FA4661-11-R-0004 Dyess SABER Solicitation.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4661-11-R-0004, 5 April 2011

7th Civil Engineer Squadron

Dyess Air Force Base

STATEMENT OF WORK

FOR

SIMPLIFIED ACQUISITION OF BASE ENGINEER REQUIREMENTS (SABER)

Prepared by: 7 CES/CEPM

Date Signature

MICHAEL J. SHAFER

Chief, SABER

Reviewed by: 7 CES/CEP

DANIEL M. FRIEBERG

Chief, Programs Flight

Reviewed by: 7 CES/CD

DWAIN WADLINGTON

Deputy

Approved by: 7 CES/CC

CHRISTOPHER G. DUFFY, Lt Col

Commander

Statement of Work for SABER

SOW for SABER Page 2 of 59

This page intentionally left blank.

SOW for SABER Page 3 of 59

TABLE OF CONTENTS

1. SCOPE OF WORK

1.1 Contractor Coefficient

1.2 Applicable Codes, Regulations and Standards

1.2.1 Standards

1.2.1.1 Code of Federal Regulations (CFR)

1.2.1.2 Federal Standard (Fed. Std.)

1.2.2 Acronyms

1.3 Work Types

1.3.1 Standard Work

1.3.2 Non-Standard Work

1.4 Government Furnished Land/Facilities/Utilities

1.4.1 Office Facilities

1.4.2 Permanent Storage Area

1.4.3 Utilities

2. CONTRACTOR PERSONNEL/PROGRAMS/EQUIPMENT MATERIALS

AND SERVICES

2.1 Personnel

2.1.1 Program Manager (PM)

2.1.1.1 Availability

2.1.1.2 Authority

2.1.2 Program Management Staff (PMS)

2.1.2.1 Project Staff

2.1.2.2 Quality Control Manager (QCM)

2.1.2.3 Government Employees

2.1.3 Sub-Contractors

2.1.4 Professional/Technician/Craftsman/Qualifications

2.1.4.1 Professional Engineer Certification

2.1.4.2 Technical Competence

2.1.4.3 Motor Vehicles

2.1.4.4 Cross-Connection/Back Flow Prevention

2.1.4.5 Herbicides/Pesticides

2.1.5 Personnel Appearance/Identification

2.1.5.1 Appearance

2.1.5.2 Contractor and Sub-Contractor Employee Identification Badges (EIB)

2.2 Programs

2.2.1 Quality Control Program

2.2.1.1 Quality Control Plan

2.2.1.1.1 Minimum Requirements

2.2.1.1.1.1 Inspection System

2.2.1.1.1.2 Identification/Prevention Methods

2.2.1.1.1.3 Documentation

2.2.2 Health and Safety Program

2.2.2.1 Non-Compliance Actions

SOW for SABER Page 4 of 59

2.2.2.2 Corps of Engineers Manual, EM 385-1-1, Safety and Health Requirements

Manual

2.2.2.3 Records/Notification

2.2.2.4 Emergency Use of Air Force Medical Facility

2.3 Equipment, Materials and Services

2.3.1 Contractor Required Equipment, Materials, and Services

2.3.2 Contractor Provided Materials to the Government

2.3.2.1 Technical Library

2.3.2.2 Software Programs/Licenses/Upgrades

2.3.3 Contractor Provided Training Services to the Government

2.3.3.1 Software Training

3. COMMENCEMENT OF WORK

3.1 Project Requirement Types

3.1.1 Routine Requirement

3.1.2 Emergency Requirement

3.2 Commencement Documents

3.2.1 Statement of Work (SOW) Package

3.2.1.1 Specifications

3.2.1.2 Cost Estimates

3.2.1.2.1 Estimating Guides

3.2.1.2.1.1 Unauthorized Sections

3.2.1.2.1.2 Applicability of Minimum and Maximum Values

3.2.1.2.2 Pre- and Non-pre Priced Line Items

3.2.1.2.2.1 NPI Roster

3.2.1.3 Project Drawings

3.2.1.3.1 Drawing Specifics

3.2.1.4 AF Form 66, Schedule of Material Submittals (AFFM 66)

3.2.1.4.1 Required Quantities

3.2.1.5 Construction Work Schedule (CWS)

3.2.2 AF Form 3000, Material Approval Submittal (AFFM 3000)

3.2.2.1 Submission Requirements

3.2.2.2 Material Samples

3.2.2.2.1 Color Boards

3.2.2.3 Operation and Maintenance (O&M) Manuals

3.2.2.4 Submittal Library

3.2.3 AF Form 3064, Contract Progress Schedule (AFFM 3064)

3.2.3.1 Acceptable Format

3.2.3.1.1 Multiple Facilities/Phased Schedules

3.3 Design Guidance

3.3.1 Professional Engineer (PE) Certification

3.3.2 Design Guidance Specific

3.3.2.1 Historical and Archeological

3.3.2.1.1 Base Cultural Resource Manager (BCRM)

3.3.2.1.2 The Secretary Of The Interior‟s Standards for Rehabilitation

3.3.2.2 Civil

SOW for SABER Page 5 of 59

3.3.2.2.1 Earthwork

3.3.2.2.2 Landscaping

3.3.2.3 Architectural/Structural

3.3.2.3.1 Secure Compartmentalized Information Facility (SCIF)

3.3.2.3.2 Concrete

3.3.2.3.3 Locksets

3.3.2.3.4 Suspended Acoustical Ceilings

3.3.2.3.5 Doors/Windows

3.3.2.3.6 Finishes/Schedules/Color Boards

3.3.2.3.6.1 Carpet/Carpet Tiles

3.3.2.3.6.2 Wallcovering

3.3.2.3.6.3 Finish Schedule/Color Boards

3.3.2.3.6.4 Door/Window Schedule

3.3.2.3.7 Exposed Metal Flashing and Coping

3.3.2.4 Mechanical

3.3.2.4.1 Boiler/Heating, Ventilation, and Air Conditioning (HVAC) Systems

3.3.2.4.1.1 Fresh Air Intakes

3.3.2.4.1.2 Equipment Manufactures

3.3.2.4.1.3 Equipment Siting

3.3.2.4.1.4 Mechanical Systems Testing

3.3.2.4.2 Temporary Boiler/HVAC Requirements

3.3.2.4.3 Direct Digital Control (DDC) Systems

3.3.2.4.4 Mechanical Equipment Identification Tags, Placards, and Schematics

3.3.2.5 Plumbing

3.3.2.5.1 Valves

3.3.2.5.2 P-Traps

3.3.2.5.3 Plumbing Identification Tags and Schematics

3.3.2.6 Environmental

3.3.2.6.1 Asbestos and Lead-Based Paint Testing and Samples

3.3.2.6.1.1 Material Restrictions

3.3.2.6.2 Aboveground Storage Tanks (AST)

3.3.2.7 Electrical

3.3.2.7.1 Cables/Wiring

3.3.2.7.2 Conduit

3.3.2.7.3 Devices and Plates

3.3.2.7.4 Power

3.3.2.7.4.1 Power Distribution Panels

3.3.2.7.5 Lighting

3.3.2.7.6 Equipment

3.3.2.7.6.1 Generators

3.3.2.7.6.2 Automatic Transfer Switch

3.3.2.7.6.3 Air Switches

3.3.2.7.6.4 Aboveground Fuel Tanks

3.3.2.7.6.5 Transformers

3.3.2.7.7 Electrical Equipment Identification Tags and Schematics

3.3.2.8 Fire Protection/Sprinkler Systems

3.3.2.8.1 Detectors

SOW for SABER Page 6 of 59

3.3.2.8.1.1 Duct Type

3.3.2.8.2 Extinguishers

3.3.2.8.3 Fire Protection Equipment Identification Tags and

3.3.2.9 Communications

3.4 Design Analysis

3.4.1 Design Analysis, Specific

3.4.1.1 Civil

3.4.1.2 Architectural/Structural

3.4.1.3 Mechanical

3.4.1.4 Plumbing

3.4.1.5 Electrical

4. PROSECUTION OF WORK

4.1 Liquidated Damages

4.2 Prosecution Documents

4.2.1 AF Form 3065, Contract Progress Report (AFFM 3065)

4.2.2 Drawings, Permits, Plans and Rosters

4.2.2.1 Worksite Redline Drawings

4.2.2.1.1 Underground Utilities Annotations

4.2.2.1.2 Geospatial Information System (GIS) Data

4.2.2.2 Welding/Cutting Permits

4.2.2.3 Sediment and Storm Water Management Plan Permit

4.2.2.4 AF Form 103, Base Civil Engineer Work Clearance Request (AFFM 103)

4.2.2.5 Preventative Maintenance Plans

4.2.2.5.1 Worksite Layout Plan

4.2.2.5.2 Dust/Debris Control Plan

4.2.2.5.2.1 Interior Dust/Debris Control Plan

4.2.2.5.2.2 Exterior Dust/Debris Control Plan

4.2.2.5.3 Detour Plan

4.2.2.5.4 Flasework Plan

4.2.2.6 Field/Lab Testing and Utility Outage Roster

4.2.2.7 Asbestos/Lead-Based Paint Abatement/Encapsulation Plans

4.2.2.7.1 Governing Standards

4.2.2.8 Hazardous Materials Inventory Report

4.2.2.9 Radiation Source Report

4.2.2.10 Debris/Recycle Report

4.3 Hours of Operation

4.4 Order of Work

4.4.1 Base Access

4.4.2 Work In Security Controlled/Restricted Areas/Facilities

4.4.2.1 Contractor Responsibilities

4.4.3 Severe Weather Delays

4.5 Worksite Standards

4.5.1 Worksite Fencing/Entrances

4.5.1.1 Perimeter Fencing

4.5.1.2 Erosion control Fencing

SOW for SABER Page 7 of 59

4.5.1.3 Excavation Fencing

4.5.1.4 Temporary Stabilized Construction Entrance

4.5.2 Equipment/Materials Storage

4.5.2.1 Storage Trailers/Boxes

4.5.2.2 Laydown/Bulk/Stockpile Storage

4.5.2.3 Government Furnished Equipment/Materials (GFE/GFM)

4.5.2.3.1 Storage of GFE/GFM

4.5.2.3.2 Unused GFE/GFM

4.5.3 Worksite Caretakership

4.5.3.1 Waste Disposal

4.5.3.1.1 Daily Cleanup

4.5.3.1.1.1 Trash Receptacles

4.5.3.1.2 Demolition/Bulk Debris

4.5.3.1.2.1 Refuse Containers

4.5.3.1.2.2 Trucking

4.5.3.1.3 Landfills

4.5.3.2 Salvage

4.5.3.2.1 Government Salvage

4.5.3.3 Sanitation Facilities

4.5.3.3.1 Government Restroom Facilities

4.5.3.4 Pavements Cleaning

4.5.3.5 Grounds Maintenance

4.5.3.5.1 Grasses

4.5.3.5.2 Trees/Shrubs/Bushes

4.5.4 Worksite Safety

4.5.4.1 Signage

4.5.4.2 Safety Clothing/Equipment

4.5.4.3 Safety Barricades/Fencing

4.5.4.3.1 Detours

4.5.4.3.2 Safety Fencing

4.5.5 Employee Parking/Deliveries

4.5.5.1 Grassed Areas

4.5.5.2 Protection of Curbs/Pedestrianways/Roadways

4.5.5.2.1 Damaged Curbs, Pedestrianways and Roadways

4.6 Worksite Procedures

4.6.1 Field/Lab Testing

4.6.1.1 Civil

4.6.1.2 Architectural/Structural

4.6.1.3 Mechanical

4.6.1.4 Plumbing

4.6.1.5 Environmental

4.6.1.6 Electrical

4.6.1.7 Fire Protection/Security Alarms

4.6.1.8 Communications

4.6.2 Deliveries

4.6.3 Protection and Storage of Existing Government Property

4.6.3.1 Protection

SOW for SABER Page 8 of 59

4.6.3.1.1 Interior Haul/Delivery Routes

4.6.3.1.2 Dust Barriers

4.6.3.1.3 Finishes/Equipment/Furniture to Remain

4.6.3.1.3.1 Furniture/Equipment Movement

4.6.3.1.4 Inclement Weather/Security

4.6.3.1.5 Vegetation

4.6.3.1.6 HVAC Utility Rooms

4.6.3.2 Storage

4.6.4 Airfield Restrictions/Requirements

4.6.4.1 Control Tower Communications

4.6.4.2 Crane Operations

4.6.5 Excavations

4.6.5.1 Field Verification

4.6.5.2 Markings

4.6.5.3 Existing Utilities

4.6.5.3.1 Hand Excavation

4.6.5.3.2 Vibratory Plough and Boring Excavation

4.6.5.3.3 Damaged/Exposed Utilities

4.6.5.3.3.1 Previously Known or Negligent Damage

4.6.5.4 Backfill

4.6.6 Welding/Cutting

4.6.6.1 Safety Equipment/Procedures

4.6.6.2 Open Flames

4.6.7 Formwork and Staging

4.6.8 Soils and Vegetation Restoration

4.6.8.1 Topsoil

4.6.8.2 Grasses

4.6.8.2.1 Establishment of Grasses

4.6.8.3 Irrigation Systems

4.6.8.3.1 Existing Irrigation Systems

4.6.9 Temporary Boiler/HVAC Requirements

4.6.10 Environmental Requirements

4.6.10.1 Smoking In Government Facilities

4.6.10.2 Noise Control/Quiet Hours

4.6.10.3 Environmental Restoration Program (ERP) Requirements

4.6.10.3.1 Contaminated Soil and Free Product

4.6.10.3.2 Site Safety

4.6.10.3.3 Monitory Wells

4.6.10.3.4 Additional Excavation

4.6.10.3.5 Construction on an ERP site

4.6.10.4 Asbestos/Lead Paint Requirements

4.6.10.4.1 Warnings

4.6.10.4.2 Standards

4.6.10.4.3 Testing, Notification and Reports

4.6.10.4.4 Operations Around Asbestos Contained Materials

4.6.10.5 Spills

4.6.10.6 Disposal Of Contaminants

SOW for SABER Page 9 of 59

4.6.10.7 Volatile Organic Compounds (VOC)

4.6.10.8 Aboveground Storage Tanks (AST)

4.6.10.9 Erosion and Sediment Control

4.6.11 Historical and Archeological Requirements

4.6.11.1 Finds

5. COMPLETION OF WORK

5.1 Final/Beneficial Occupancy Inspections

5.1.1 Worksite Preparation

5.1.1.1 Exterior Areas

5.1.1.2 Interior Areas

5.2 Completion Documentation

5.2.1 Roster of Known Discrepancies

5.2.2 Final Worksite Redline Drawings

5.2.3 As-Built Drawings/Deliverables and GIS Data

5.2.4 O&M Manuals

5.2.5 Warranty of Construction

5.2.5.1 Roofing Warranties

5.2.5.2 Grasses Warranties

5.2.5.3 Effective Dates

5.2.5.4 Notification of Defects

5.2.5.5 Correction of Defects

5.2.5.6 Subcontractors, Manufactures and Suppliers

5.2.5.7 Hold Harmless

5.2.5.8 Optional Form 274 Equipment Warranty Certificate (OF 274)

5.2.5.9 Warranty Log

5.2.5.10 Equipment Warranty/Guarantee Record

5.2.6 Construction Data Worksheet

5.3 Equipment Training

TECHNICAL EXHIBITS

TE-1 Applicable Contractor Coefficient Requirements and Responsibilities

TE-2 Construction Data Worksheet

TE-3 Equipment Warranty/Guarantee Record

TE-4 List of Acronyms

TE-5 Applicable Codes, Regulations and Standards

TE-6 SABER SOW Package Format

TE-7 Contractor Drawing and Geospatial Information System (GIS) Data Standards

TE-8 Civil Engineer Work Clearance Request

TE-9 Definitions

TE-10 Dyess AFB Technical Specifications

SOW for SABER Page 10 of 59

This page intentionally left blank.

SOW for SABER Page 11 of 59

1. SCOPE OF WORK.

a. Simplified Acquisition of Base Engineer Requirements (SABER): This is an indefinite-delivery, indefinite-quantity (IDIQ) contract for design and construction efforts at Dyess Air Force Base, Texas.

b. The SABER contract is for a broad range of maintenance, repair, minor and new construction work on real property at Dyess Air Force Base (DAFB), Texas. For the purpose of this contract, Dyess AFB is defined as all Military Family Housing, main base area, and all grounds owned by the Department of the Air Force near Abilene, TX.

c. 7th Civil Engineer Squadron, SABER Section, 710 3 rd

Street, DAFB (7 CES/CEPM) primary goal is swift acquisition of engineering requirements where Contractor responsiveness is paramount. Once the 7th Contracting Squadron, SABER Section, 381 3 rd

Street, DAFB (7

CONS/LGCA) Contracting Officer (CO) notifies the Contractor of an existing requirement, the

Contractor shall expeditiously prepare a proposal.

d. During the contract period, the Government will identify required construction projects. The

Government shall provide a project concept and the Contractor shall subsequently provide a design, detailed drawings, and corresponding statement of work and price with the proposal to perform the work.

e. The Contractor shall receive formal requests for detailed estimates as the basis for issuance of task orders under the contract. The requests shall include a project number, project title, conceptual statement of objectives and shall state any special instructions or conditions that may exist with respect to the work.

f. The Contractor shall be responsible for identifying tasks, refining quantities, pricing non-priced tasks/items, preparing required working drawings, developing performance times, and submitting a formal proposal in the prescribed format.

g. The Government shall respond to any questions the Contractor may have regarding the work and the Contractor shall submit the proposal to the Contracting Officer in hard copy form and electronic form (CD-R).

h. Following Government review of the proposal, the Contracting Officer shall arrange and conduct a proposal review meeting with the Contractor to resolve any variations involving price, time or quantities. This meeting may be combined with a site visit or may be preceded by a site visit for more complex projects. The SABER Contract Manager shall attend all meetings.

i. Following Government review and acceptance of the proposal, the Contracting Officer shall prepare and issue task orders and the Contractor shall subsequently begin the work, if the government chooses to accomplish work with this contract.

j. Types of projects include, but are not limited to new construction, and interior/exterior remodeling/renovation/repairs. Project disciplines may include, but not be limited to, one or more of the following: civil, structural, architectural, mechanical, plumbing, communications, intrusion/detection audio/visual systems, and electrical disciplines; petroleum/oil/lubricants systems; asphalt and concrete pavements, masonry, various roofing systems, earthworks and landscaping, environmental and hazardous abatements, aerial and underground utilities, power and heat generation.

SOW for SABER Page 12 of 59

k. The Contractor may be required to work within controlled or restricted areas. Work may be subject to delays due to security access.

l. The Contractor shall be required to maintain a management office on DAFB to perform all general management operations associated with this contract.

m. All project time and schedules for this contract are calculated and represented as calendar days.

n. The attached Technical Exhibits (TEs) are mandatory, and considered part of this Scope of Work.

1.1. CONTRACTOR COEFFICIENT. The contractor in each T.O. shall, for the life of the contract, provide to the Government certain labor, equipment, materials, and rentals/fees that are considered field overhead, therefore part of the contractor‟s coefficient. Those requirements/responsibilities are identified throughout this Statement of Work.

a. Where notification of a coefficient requirement/responsibility is stated, all associated sub-paragraphs are also applicable as part of the coefficient.

b. Other coefficient statements may be found in these sub-paragraphs referring to additional requirement/responsibilities.

c. A consolidated listing of applicable coefficient requirement/responsibility is provided in

Technical Exhibit (TE) 1 - APPLICABLE CONTRACTOR COEFFICIENT REQUIREMENTS

AND RESPONSIBILITIES.

1.2. APPLICABLE CODES, REGULATIONS AND STANDARDS. All works under this contract shall comply with Dyess AFB Technical Specifications and the most current Local, State, and Federal

Regulations, to include any subsequent updates as they occur. The latest edition of building codes and regulations shall be followed for all designs, construction, and materials under this contract. If there is a conflict between the codes and/or regulations and these contract specifications, the most stringent requirements shall govern at all times. The Contractor shall maintain a copy of each of these documents available for use during the term of this contract. The Codes, Regulations and Standards listed in TE 5 -

APPLICABLE CODES, REGULATIONS AND STANDARDS are not all inclusive and do not relieve the Contractor from compliance with any unlisted Code, Regulation, or Standard required under law to perform works on DAFB.

a. The following technical specifications shall be utilized during the life of the entire contract

(possible five years). The Government reserves the right to update these specifications at any time.

1) Dyess AFB Technical Specifications.

2) Dyess AFB Architectural and Landscape Design Standards.

3) Air Combat Command Interior Design Handbook

4) Dyess Design Technical Letters provide to the Contractor

b. The Government reserves the right to include other specifications not listed above with the

Government Statement of Objectives for individual projects.

1.2.1. Standards. The publications listed below form a part of this specification to the extent referenced (the publications are referred to in the text by basic designation only):

SOW for SABER Page 13 of 59

1.2.1.1. Code of Federal Regulations (CFR). Occupation, Safety and Health Administration (OSHA)

General Industry Safety and Health Standards (29 CFR 1910), Publication V2206, OSHA Construction

Industry Standards (29 CFR 1926). One source of these regulations is OSHA Publication 2207, which includes a combination of both Parts 1910 and 1926 as they relate to construction safety and health. They are for sale by the Superintendent of Documents, U.S. Government Printing Office, Washington, DC

20402.

1.2.1.2. Federal Standard (Fed. Std.).

1.2.1.2.1. Material Safety Data Sheets (MSDS). For each T.O. issued against this contract the

Contractor shall for all required MSDSs, prepare and submit copies as indicated in Technical Exhibit (TE)

10 – DYESS AFB TECHNICAL SPECIFICATIONS, SECTION 01011 - SAFETY ENGINEERING

AND MAINTENANCE.

1.2.1.2.2. Use of Asbestos Containing Material or any Class 1 ozone depleting chemical compounds are prohibited, DA Circular 40-83-4.

1.2.1.2.3. Definition of Hazardous Materials. Refer to hazardous and toxic materials / substances included in Subparts H and Z of 29 CFR 1910 and to others as additionally defined in Fed. Std. 313.

Those most commonly encountered include asbestos, lead-based paint, polychlorinated biphenyls (PCBs), explosives and radioactive material, but may include others. The most likely products to contain asbestos are sprayed-on fireproofing, insulation, boiler lagging, pipe coverings, and vinyl floor tile and/or it‟s associated mastic.

1.2.2. Acronyms. A list of acronyms is provided in TE-4 – LIST OF ACRONYMS.

1.2.3. Definitions. A list of definitions is provided in TE-9 – DEFINITIONS.

1.3. WORK TYPES.

1.3.1. Standard Work. Defined as the period from 7:30 a.m. to 4:30 p.m. (0730 hrs to 1630 hrs), Monday through Friday, excluding Saturdays, Sundays and Federal holidays. All work shall be performed during this period unless otherwise authorized by the Contracting Officer (access to work sites may be restricted to this period due to mission requirements) and approved at least 48 hours in advance, or unless otherwise specified in the T.O.

1.3.2. Non-Standard Work. Defined as the period outside of Standard Work (the period from 4:30 p.m. to 7:30 a.m. Monday through Friday, including Saturdays, Sundays, and Federal Holidays). Only work specified by the Contracting Officer, prior to issuance of a T.O., or subsequent modification that identifies work requiring non-standard work hours, shall be multiplied by the non-standard work coefficient.

1.4. GOVERNMENT FURNISHED FACILITIES/UTILITIES.

1.4.1. Office Facilities. The contractor will be provided an on-base area to set up, at contractor expense, office space (normally a trailer) to conduct their activities supporting this contract. The contractor shall maintain the Area IAW paragraph 4.5.3, and restore the area IAW paragraph 4.6.8 at the close of the contract, or as directed by the CO.

SOW for SABER Page 14 of 59

a. The Government reserves the right, at contractor expense, to require the contractor to relocate to another on-base location one time during the contract performance.

b. The contractor is responsible for the connection and removal of all utilities.

c. All equipment/materials/supplies required to administer this contract shall be at the contractor‟s expense.

d. All provided Government facilities shall be utilized only for the purpose of this contract, or as authorized by the CO.

e. The contractor shall perform housekeeping to include, but not limited to sweeping, mopping, dusting, waste disposal, grass cutting, weed control, snow/ice removal and other operations necessary to present a neat appearance at all times, or as otherwise directed by the CO.

f. All labor, equipment, materials and rentals/fees required to perform all housekeeping, vegetation maintenance, and snow/ice removal shall be at no additional cost to the Government and is considered field overhead, therefore part of the Contractor‟s coefficient.

1.4.2. Permanent Storage Area. The contractor will be provided an on-base area for long-term storage of materials. The contractor shall provide perimeter security fencing and gate for the storage area as directed by the CO. The contractor shall maintain the Permanent Storage Area IAW paragraph 4.5.3, and restore the area IAW paragraph 4.6.8 at the close of the contract, or as directed by the CO. All labor, equipment, materials and rentals/fees required to provide, establish, maintain, and disassemble the perimeter fencing, and maintain worksite caretakership and restoration of the Permanent Storage Area shall be at no additional cost to the Government and is considered field overhead, therefore part of the

Contractor‟s coefficient.

1.4.3. Utilities. All electric and water utilities for the office facility and all worksites (when available), with the exception of portable generator and pump requirements, shall be provided to the contractor at no cost.

END SECTION - Remainder of this page intentionally left blank

SOW for SABER Page 15 of 59

2. CONTRACTOR PERSONNEL/PROGRAMS/EQUIPMENT MATERIALS and SERVICES.

The Contractor shall not employ persons for work on this contract if such employee is identified to the

Contractor by the Contracting Officer as a potential threat to the health, safety, security, general well being, or operational mission of the installation and its population. Where reading, understanding, and discussing safety and environmental warnings are an integral part of a contract employee‟s duties, that employee will be able to understand, read, write, and speak English (speaking skills are not required where a Contractor employee is hearing impaired.)

2.1. PERSONNEL.

2.1.1. Program Manager (PM). The Contractor shall provide a qualified PM who shall be responsible for the performance of all aspects of the work, and shall be located on DAFB. The Contractor shall submit for approval by the CO, a detailed resume for the program manager prior to assumption of duties, and any subsequent replacement of position in sufficient time to allow proper evaluation. The PM shall have a minimum of 5 years experience of programs of similar size and scope. The name of this person and alternate(s), who shall act for the Contractor when the PM is absent, shall be designated in writing to the CO prior to the Pre-Performance Conference (PPC). The PM and alternate(s) must be able to read, write, speak, and understand the English language.

2.1.1.1. Availability. The PM or alternate shall be directly available to the CO and the SABER Chief

(SC) via Contractor provided cellular phone number during normal duty hours to meet and discuss contract issues.

a. Normally, after normal duty hours, to include weekends and holidays, the PM or alternate(s) shall be available within 4 hours to meet on DAFB with government personnel (as authorized by the

CO) to discuss contract issues (a cellular phone number for this purpose shall be provided to the

CO prior to the PPC, and shall be updated as changes occur).

b. As directed by the CO, after normal duty hours, to include weekends and holidays, the PM or alternate(s) shall be available within 30 minutes to meet on DAFB with government personnel (as authorized by the CO) to discuss contract issues (a cellular phone number for this purpose shall be provided to the CO prior to the PPC, and shall be updated as changes occur).

2.1.1.2. Authority. The PM (or alternate(s) in the absence of the PM) shall have full authority to act for the Contractor on all matters relating to daily operation of this contract. The PM shall have the authority to obligate the company in any aspect of this contract regarding negotiations and T.O.‟s as a minimum, and shall have the authority to hire sub-contractors as required.

2.1.2. Program Management Staff (PMS). The PMS shall have all engineering disciplines and support positions of administration, quality control, safety, Computer Aided Drafting and

Design/Geographic Information System (CADD/GIS), field supervision and financial management experience. All personnel performing these functions shall maintain all appropriate and applicable federal, state and local certification as required. (NOTE: appropriate Contractor personnel require working knowledge and capability to utilize project management software.)

2.1.2.1. Project Staff. The Contractor shall designate in writing to the CO for each project the assigned

Project Manger and Project Superintendent (PS), and any changes in personnel.

2.1.2.2. Quality Control Manager (QCM). The contractor shall have on staff a minimum of one individual dedicated as the QCM, and responsible for the Quality Control Program IAW paragraph 2.2.1.

SOW for SABER Page 16 of 59

2.1.2.3. Government Employees. The Contractor shall not employ any person(s) who is an employee of the United States Government, if employing that person would create a conflict of interest, or the appearance of a conflict of interest. Additionally, the Contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DODR 5500.7, Joint Ethics Regulations (JER). The Contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies in AFI 64-106, Air Force Industrial Labor Relations Activities.

2.1.2.3.1. Military Personnel. The Contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours, or deployment.

Military Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the Contractor's ability to perform, however, their absence at any time shall not constitute an excuse for non-performance under this contract.

2.1.3. Sub-Contractors. The PM and PMS shall have the ability to manage and control multiple sub-

Contractors at multiple work sites. The PM shall provide to the CO a completed Statement of Prime

Contractor (SF 1413) within seven calendar days after any sub-Contractor award regardless of tier (IAW

FAR 52-222-11). All sub-Contractors shall comply with appearance requirements as stated in paragraph

2.1.5.1.

2.1.4. Professional/Technician/Craftsman Qualifications. The PM shall ensure all employees, to include sub-Contractor employees have valid licensing/certifications to accomplish applicable contract requirements before starting work under this contract, and are in compliance with all federal, state, and local regulations and environmental requirements or laws, and are qualified, competent, and capable of handling all assigned tasks. The following qualifications are not all inclusive:

2.1.4.1. Professional Engineer Certification. All designs requiring Professional Engineer (PE)

Certification/stamp shall be prepared by a qualified PE with valid Texas state documentation supporting their Professional Engineer Certification.

2.1.4.2. Technical Competence. All Project Managers, Quality Control Managers and Project

Superintendents shall have a minimum of five years of experience performing in that function, and all non-professional and/or technician project managers shall have relevant experience in the discipline they are designing.

2.1.4.3. Motor Vehicles. Personnel operating motor vehicles on roadways must possess a valid drivers license for the vehicles they operate. Personnel operating motor vehicles on the flight line shall be certified IAW DAFB Flightline Driving Instruction.

2.1.4.4. Cross-Connection/Back Flow Prevention. Texas State licenses for certified cross-connection and back flow prevention device testing and installation of all anti-siphon or back flow prevention units on all applicable plumbing applications. The Contractor shall make these licenses available for

Government inspection, upon request, for each individual that performs this task.

2.1.4.5. Herbicides/Pesticides. Any personnel that apply herbicides/pesticides shall have a current

Texas Commercial State Applicator‟s License. The Contractor shall make these licenses available for

Government inspection, upon request, for each individual that performs this task IAW AFI 32-1053.

SOW for SABER Page 17 of 59

2.1.5. Personnel Appearance/Identification.

2.1.5.1. Appearance. All Contractor personnel shall present a neat appearance, and shall not wear clothing that depicts any symbol, logo or language deemed racial, lewd or offensive. Contractor personnel shall not be present without proper safety equipment/clothing at all times IAW all applicable OSHA standards. All Contractor personnel shall wear shirts at all times.

2.1.5.2. Contractor and Sub-Contractor Employee Identification Badges (EIB). The Contractor shall provide each prime contractor employee with an EIB. Information on this badge shall include the title

“SABER CONTRACT – DYESS AFB”, the prime Contractor‟s name, the individual‟s name, and a passport sized photograph of the individual. The Contractor shall have EIB‟s completed prior to the contract start date. New employees shall have completed badges prior to performing work under this contract. EIB‟s shall be worn or attached to the outer garment at all times. All badges worn within the designated airfield areas shall be secured to each individual using a plastic armband or a nylon/cotton cord and shall not contain any form of metal. Military issued security line badges or Government issued identification cards (i.e. DD FORM 2) shall not be utilized as a substitute for the EIB‟s. All labor, equipment, materials and rentals/fees required to provide the Contractor and Sub-Contractor Employee

Identification Badge (EIB) shall be at no additional cost to the Government and is considered field overhead, therefore part of the Contractor‟s coefficient.

2.1.5.2.1. Sub-Contractor EIB. The Contractor shall provide generic non-photo EIB‟s for all sub-contractor personnel identifying them as Sub-Contractor‟s to the SABER Contractor. The EIB shall read:

“Sub-Contractor to (Name of SABER Contractor)” and the DAFB Contractor Office phone number.

2.2. PROGRAMS.

2.2.1. Quality Control Program. All labor, equipment, materials and rentals/fees required to provide the Quality Control Program shall be at no additional cost to the Government and is considered field

2.2.1.1. Quality Control Plan. In compliance with the contract clause entitled "Inspection of Services"

(FAR Clause 52.246-4), the Contractor shall provide a Quality Control Plan (QCP) with their proposal that contains, as a minimum, the items listed in paragraph 2.2.1.1.1. The QCP shall become a compliance document for all work accomplished under all T.O.s. Any subsequent modifications shall be submitted to the CO for acceptance before implementation. The CO reserves the right to request modifications to the

QCP if it does not prove effective, and may take actions to remove the acting Quality Control Manager

(QCM) if deemed necessary.

2.2.1.1.1. Minimum Requirements. The plan shall include:

2.2.1.1.1.1. Inspection System. A description of the inspection system that covers all tasks and services required to perform work on each T.O. The description shall include specifics as to the areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, submission of a quality control inspection schedule, and the title and organizational placement of the inspectors. Additionally, control procedures for any government provided keys or lock combinations shall be included.

2.2.1.1.1.2. Identification/Prevention Methods. A description of the methods to be used for identifying discrepancies, eliminating negative trends, and preventing defects in the quality of work performed.

SOW for SABER Page 18 of 59

2.2.1.1.1.3. Documentation. A description of the records kept to document inspections and corrective or preventive actions taken. The records of inspections shall be maintained and made available to the government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.

2.2.2. Health and Safety Programs. All labor, equipment, materials and rentals/fees required to provide the Health and Safety Programs shall be at no additional cost to the Government and is considered field overhead, therefore part of the Contractor‟s coefficient.

2.2.2.1. Non-Compliance Actions. The CO will notify the Contractor of any noncompliance of health or safety requirements, and the required action to be taken (notification delivered to the Contractor representative at the worksite shall be deemed sufficient). The Contractor shall take immediate corrective action to rectify all violations. If the Contractor fails, or refuses to promptly comply, the CO may issue a

Stop Work Order ceasing all, or part of the work for a stop work order issued for non-compliance actions, until satisfactory corrective action has been taken. The Contractor shall not claim for costs, damages or time extensions due to Stop Work Orders based on non-compliance with health or safety requirements.

2.2.2.2. Corps of Engineers Manual, EM 385-1-1, Safety and Health Requirements Manual. The

Contractor shall comply with all pertinent provisions of the most current version of the Corps of

Engineers Manual, EM 385-1-1, Safety and Health Requirements Manual. The Contractor shall provide copies to the Government IAW paragraph 2.3.2.1.4. The Contractor is responsible for compliance with the provisions of this manual, to include sub-contractors.

2.2.2.3. Records/Notification. The Contractor shall maintain accurate records, and shall notify the CO in the prescribed manner of, all exposure data, accidents resulting in death, traumatic injury, occupational disease, and damage to property, materials, supplies and equipment incident to work performed under this contract.

2.2.2.4. Emergency Use of Air Force Medical Facility. The DAFB Medical Facility will provide only life threatening emergency medical treatment to employees of the Contractor for injuries incurred while working at the installation. The Contractor shall reimburse the DAFB Medical Facility, for treatment provided at the current reimbursement rate for non-beneficiaries IAW AFR 168-7. The Contractor shall provide the DYESS Medical Facility with the name of a physician and/or hospital to which injured personnel can be transferred for further treatment and care after receiving initial emergency treatment.

Thereafter, the employee‟s physician shall provide all follow-on care.

2.3. EQUIPMENT, MATERIALS AND TRAINING SERVICES. All labor, equipment, materials and rentals/fees required for all contractor required, and contractor provided equipment, materials and services to the Government shall be at no additional cost to the Government and is considered field

2.3.1. Contractor Required Equipment, Materials, and Services. The contractor shall maintain, throughout the life of the contract for its own operations, all equipment, phone and e-mail service in sufficient quantity for its staff to comply with the contract requirements, and that is compatible with the contractor provided equipment, materials and services that the contractor is required to provide to the

Government.

2.3.2. Contractor Provided Materials to the Government. All contractor-provided materials shall become the property of the Government, and the contractor shall replace, any whole or portion of materials as directed by the CO at no additional cost to the Government throughout the life of the contract.

SOW for SABER Page 19 of 59

2.3.2.1. Technical Library. The contractor shall, within 30 calendar days after contract award, provide two copies of the following manuals/codes to 7 CES/CEPM, and one copy to 7 CONS/LGCA unless noted otherwise, and shall provide updates as published at no additional cost to the Government.

2.3.2.1.1. R.S. Means Pricing Guides as follows:

a. Assemblies Cost Data

b. Building Construction Cost Data

c. Electrical Cost Data

d. Facilities Construction Cost Data

e. Mechanical Cost Data

f. Plumbing Cost Data

g. Square Foot Costs

2.3.2.1.2. R.S. Means Estimating Handbook.

2.3.2.1.3. R.S. Means Illustrated Construction Dictionary.

2.3.2.1.4. EM 385-1-1 Safety Health requirements Manual. May be obtained from the Government

Printing Office, Washington DC 20402. The Contractor is responsible for compliance with the provisions of this manual, to include sub-Contractors.

2.3.2.1.5. National Electric Code. Not required for 7 CONS/LGCA.

2.3.2.1.6. Uniform Building Code. Not required for 7 CONS/LGCA.

2.3.2.1.7. Uniform Mechanical Code. Not required for 7 CONS/LGCA.

2.3.2.1.8. Uniform Plumbing Code. Not required for 7 CONS/LGCA.

2.3.2.1.9. International Building Code. Not required for 7 CONS/LGCA.

2.3.2.1.10. International Residential Code. Not required for 7 CONS/LGCA.

2.3.2.1.11. International Fire Code. Not required for 7 CONS/LGCA.

2.3.2.1.12. Uniform Federal Accessibility Standards. Not required for 7 CONS/LGCA.

2.3.2.1.13. Americans with Disabilities Act Accessibility Guidelines for Buildings and

Facilities. Not required for 7 CONS/LGCA.

SOW for SABER Page 20 of 59

2.3.2.2. Software Programs/Licenses/Upgrades. The contractor shall, within 30 calendar days after contract award, provide 6 licenses, install and troubleshoot the most current version of the following software to 7 CES/CEPM, and one license to 7 CONS/LGCA, and shall provide upgrades as published at no additional cost to the Government. The software shall be licensed for both network common use and stand alone personal computer. Receipt of update software and/or RS MEANS information each year does not obligate the Government to exercise any contract option years.

2.3.2.2.1. Project Estimating and Manager Software, by 4Clicks Solutions, LLC, to include:

2.3.2.2.1.1. e4Clicks Professional Project Estimator.

2.3.2.2.1.2. R. S. Means Facilities Construction Cost Data/e4Clicks Database.

2.3.3. Contractor Provided Training Services to the Government.

2.3.3.1. Software Training. The contractor shall provide initial training to Government personnel not to exceed 10 persons per class for software identified in 2.3.2.2, at no additional cost to the Government.

Additionally, if requested by the Government, a three-year refresher training for Government personnel, not to exceed 10 persons per class, at no additional cost to the Government.

END SECTION - Remainder of this page intentionally left blank

SOW for SABER Page 21 of 59

3. COMMENCEMENT OF WORK. For each project required, the Contractor will receive a formal request for a detailed Contractor design and proposal package. All Government requests will include a project number, project title, conceptual scope of work, and will state any known special instructions or conditions that may exist. The Contractor shall attend a Pre-Design Site Visit to introduce and familiarize the Contractor with the projected work requested. Subsequently, the Contractor shall prepare and submit for review a corresponding Contractor Statement of Work (SOW) Package (see paragraph 3.2.1). The

Contractor will have full access to all Record and As-Built drawings located in the 7th Civil Engineer

Squadron, Contract Development, 710 3 rd

Street, DAFB (7 CES/CEPT) as required for development of the Contractor‟s proposal (GFM CD(s) of all available electronic files of as-built drawings will be provided to the contractor at award of contract). The Contractor shall be responsible for identifying tasks, refining quantities, preparing design calculations, pricing any Non Pre-priced Items (NPI) or tasks, preparing required design drawings, developing performance times, and submitting a formal proposal in the prescribed format. The Government will respond to any questions the Contractor may have regarding the work, and the Contractor shall submit the proposal to the CO. Following Government technical review of the proposal, the CO will conduct negotiations with the Contractor, 7 CES/CEPM representatives, and any other persons deemed necessary, for resolving any variations involving price, time, quantities, and any other relevant items. Following Government acceptance of the negotiated and/or revised proposals, the CO will prepare and issue a T.O. and a Notice To Proceed (NTP) directing the

Contractor to begin work within a specified period of time acceptable to the CO and 7 CES/CEPM representative based on mission requirements.

3.1. PROJECT REQUIREMENT TYPES. The two types of project requirements are Routine and

Emergency. Either of these types may be issued at anytime during the length of this contract. The

Government is responsible for determination of project requirement type.

3.1.1. Routine Requirement. Within three calendar days of project notification, unless otherwise directed by the CO, the PM, or authorized representative(s) shall attend a Pre-Bid Site Visit to clarify any project requirements, and/or further define the project scope of work. The Contractor‟s proposal shall be submitted to the CO IAW paragraph 3.2.1 within seven calendar days after the Pre-Bid Site Visit for non-complex work and 14 calendar days after the Pre-Bid Site Visit for complex work as determined by the

Government, unless otherwise directed by the CO.

3.1.2. Emergency Requirement. In the event of an emergency or time sensitive requirement, the PM, or authorized representative(s) response time shall be as soon as directed by the CO. The Contractor‟s proposal shall be submitted IAW paragraph 3.2.1, or as directed by the CO.

3.2. COMMENCEMENT DOCUMENTS. Contractor design documents shall be developed so that a distinction is made between items that are associated with each classification of work (i.e. Demolition, Minor Construction, Repair, and Additives). Categories of work notes shall be affixed throughout the contract documents to clearly distinguish between works that are Demolition (D), Minor Construction

(MC), or Repair (R) and further delineate any items that are Additive Bid Items (reflected as “Option #”) and shall be accounted for and priced separately in the cost proposal. Additive Bid Items shall be priced separately. The concept of the SABER program provides for 35% design level effort. However, some portions of a design may require up to a 65 to 95% design effort depending upon nature/complexity (i.e., mechanical/electrical). A 100% design level effort may be necessary when PE Certification is required.

All labor, equipment, materials and rentals/fees required to provide all commencement documents shall be at no additional cost to the Government and is considered field overhead, therefore part of the

SOW for SABER Page 22 of 59

3.2.1. Statement of Work (SOW) Package. The Contractor shall submit for Government review, three paper and one electronic CD-ROM formatted SOW Package presenting the Contractor‟s offer within the time requirements as stated in the contract solicitation, unless otherwise directed by the CO.

The Contractor‟s design shall be IAW paragraph 3.3. The format shall be IAW TE 6 - SOW PACKAGE

FORMAT, and as a minimum shall include: a cover page; a detailed specification; a detailed cost estimate (in the authorized format); all Government requested project design drawings and thorough applicable design calculations IAW paragraph 3.4; a Material Submittal Schedule (AFFM 66) reflecting proposed product submissions and required contract reports; and a Construction Work Schedule (CWS)

IAW paragraph 3.2.1.5. When the Contractor desires to offer alternatives, or Value Engineering

Proposals, they shall: clearly state and identify alternatives proposed; their segregated associative costs; a delineation of impacted line items; and advantages and disadvantages for Government evaluation. The

Contractor shall provide support, verification and justified reasoning behind their proposal to alter the

Government‟s RFP.

3.2.1.1. Specifications. The Contractor shall use Dyess AFB specific specifications as provided in attached Technical Exibit, TE-10, if available and/or develop project specifications in Construction

Specification Institute (CSI) format utilizing the current edition of the U. S. Army Corps of Engineers

Guide Specifications (CEGS) and the Construction Criteria Base (CCB). Specifications shall be generated using the latest version of Microsoft Word utilized by the agencies at DAFB and once approved by 7 CES/CEPM shall be added to attached Technical Exibit, TE-10. As a minimum, applicable CEGS sections and paragraphs shall be listed along with the specific requirements of the T.O.

3.2.1.2. Cost Estimates. Cost estimates shall be calculated using: the approved software program and

RS Means Cost Data IAW paragraph 2.3.2.2; the “Total O&P Line Item Cost”; and applicable

a. The total costs shall be as printed in the current RS MEANS databases, without changing the daily output, equipment, material, or labor rates. There are two exception to this for

“Demolition” IAW paragraph 3.2.1.2.1.3 and “Remove and Reinstall” IAW paragraph

3.2.1.2.1.4. No deviation from RS MEANS labor, material, equipment, or daily output shall be authorized unless approved, in writing, by the Contracting Officer.

b. In RS MEANS Facilities Construction Cost Data, the introduction (How the Book Is Built: An

Overview, Quick Start, and How to Use the Book: The Details) shall not be construed as permitting cost changes or deviations from RS MEANS for the purposes of this contract.

c. No provision shall be made for costs in excess of RS MEANS other than the Contractor‟s

d. All line items in the RS MEANS Cost Data Bases include waste. Actual square footage quantities measured shall be used as quantity. No additional quantity shall be added as scrap or waste.

e. Line items in the RS MEANS Cost Data Bases include as part of that line item, all miscellaneous line items required to install that item. EXAMPLE: Installation of line item “Window Frame” includes costs of caulking, screws, drilling, and any other materials/labor required for complete installation of that line item.

SOW for SABER Page 23 of 59

f. Where an assembly cost is provided (an example would be a brick wall), it shall not be broken down into individual units and listed separately (brick, mortar, horizontal reinforcement, etc).

3.2.1.2.1. Estimating Guides. The following RS MEANS COST DATA Estimating Guides shall be authorized:

h. Assemblies Cost Data

i. Building Construction Cost Data

j. Electrical Cost Data

k. Facilities Construction Cost Data

l. Mechanical Cost Data

m. Plumbing Cost Data

n. Square Foot Costs

3.2.1.2.1.1. Unauthorized Sections.

3.2.1.2.1.1.1. Division 1 in its entirety, with the following exceptions:

a. Section 01 11 31.30 - Engineering Fees, only where PE Certification is required. IAW R.S.

Means, the Mechanical/Plumbing/HVAC Engineering Fees are applicable only to those specific sub-contracted portions of the project, whereas the Structural Engineering Fees are applicable to the project total.

b. Section 01 54 23.70 - Scaffolding. Note, use of any line items will necessitate the Contractor schedule an inventory by Government Personnel and submittal by Contractor of Government Signed

Inventory IAW paragraph 3.2.2

c. Section 01 93 – Facility Maintenance.

3.2.1.2.1.1.2. Division 2 as follows: Construction Dumpsters and/or any spoils/rubbish handling/hauling and/or disposal fees for quantities of less than 20 Cubic Yards (8 Tons).

3.2.1.2.1.1.3. The following items in any division:

a. Equipment Rental for any hand held tool(s).

b. Expendable items such as saw blades, drill bits, etc.

c. Dewatering. Is partially excluded in that excavations that are called for in the delivery order that become filled with water due to inclement weather or that is resultant from the contractor‟s negligence through rupturing utilities shall be dewatered at the contractor‟s expense and not paid for as a separate line item.

SOW for SABER Page 24 of 59

d. Hazardous material abatement, asbestos, lead, PCB, etc. All costs associated with any hazardous material abatement and/or containment not identified in part 1 section B – Supplies or

Services and Prices/Costs – Asbestos Abatement of the solicitation will be accomplished as “Non-pre

Priced Line Item” IAW paragraph 3.2.1.2.2.

3.2.1.2.1.1.4. All labor, equipment, materials and rentals/fees required to provide works for these unauthorized sections shall be at no additional cost to the Government and is considered field overhead, therefore part of the Contractor‟s coefficient.

3.2.1.2.1.2. Applicability of Minimum and Maximum Values. When RS Means Cost Data Line Items reflect a maximum or minimum, the average of these two values shall be utilized.

3.2.1.2.1.3. Demolition. For demolition tasks accomplished under the contract where a demolition line item is not available, an installation line item for “like item” may be used as follows: the material cost will be zeroed out and the labor rate will be reduced to 25%.

EXAMPLE: Demo one light fixture. Material cost would be 0%, labor cost would be 25%

(demo) and equipment cost would…