Other files attached to Simplified Acquisition of Base Engineering Requiremnts Contract, newest first.
File Type Posted
SABER Q A.pdf PDF
Tye Slide Gate 02- 10-12-09.JPG JPG image
Tye Slide Gate 03- 10-12-09.JPG JPG image
Tye Slide Gate 01- 10-12-09.JPG JPG image
Tye Slide Gate 04- 10-12-09.JPG JPG image
11-0052 SOO Concept Drawings —
11-0052 SOO Concept Drawings —
05-0032 09-0106 SOO Atch 02 - RD7422.DWG DWG drawing
05-0032 09-0106 SOO Atch 01 - Concept Drawings —
05-0032 09-0106 SOO.pdf PDF
SABER SoW Technical Exhibit 10 - DAFB Technical Specifications Revised Feb 10.pdf PDF
SOO Atch 7 UFC Part 2 - UFC 3-600-01 - DESIGN-FIRE PROTECTION ENGINEERING FOR FACILITIES.pdf PDF
SABER SoW Technical Exhibits 1 - 9.pdf PDF
FA4661-11-R-0001-0001 —
Schedule of Wage Rates.pdf PDF
SOW-SABER-5 Apr 11.pdf PDF
SOO Atch 7 UFC Part 1 - General Building Requirements.pdf PDF
SABER Seed Proj 1.pdf PDF
SABER Seed Proj 2.pdf PDF
SOO Atch 7 UFC Part 4 - DoD Security Engineering Facilities Planning Manual.pdf PDF
SOO Atch 7 UFC Part 3 DoD Minimum Aniterrorism Standards for Buildings.pdf PDF
Dyess SABER Pre Poposal Conference Reservation Form.pdf PDF
Dyess SABER Seed Project.pdf PDF
Dyess SABER Question Form.pdf PDF
Dyess SABER Solicitation Past Performance Questionnaire.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Simplif ied Acquisition of Base Engineer Requirements (SABER):

NAICS 236220

This w ill be an Indefinite Delivery Indefinite Quantity f irm-fixed price contract set aside for competition restricted to SBA Certif ied HUB Zone firms

Pre-Proposal Conference/Site VIsit: 2 Mar 11 at 0900 AM CST at 7th Contracting Squadron. Parties attending MUST FILL OUT AND SUBMIT the

Site Visit RESERVATION FORM by 28 Feb 11 at 2:00 PM CST. Contract performance is one base period plus four 12 month option periods.

Block 11 Below : A Notice to Proceed w ill be issued for each task order and the performance period shall be stated in each task order.

Sections K, L, M w ill be removed from any resultant aw ard, but w ill be deemed to be incorporated by reference, in that aw ard.

PROPOSAL SUBMISSION: Fax or electronic proposals are not authorized and w ill not be accepted. Proposals may be sent using delivery confirmation, or hand carried to SrA Chris Pardo, CONS/LGCA, 381 Third Street, Bldg 7238, Dyess AFB, TX 79607. Proposals w ill not be accepted after the deadline specif ied in Block 13. Lack of registration in the Central Contractor Registration (CCR) database w ill make offeror ineligible for aw ard.

MARIA R. HARTSFIELD 325-696-1458

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

04-Apr-2011

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________17 Mar 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

7TH CONTRACTING OFFICE

381 THIRD STREET

DYESS AFB TX 79607-1581

FA4661

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

FA4661-11-R-0004 97

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA4661-11-R-0004

Section B - Supplies or Services and Prices

THE BID SCHEDULE

THE SCHEDULE

SECTION B

SABER Coefficients and Proposal Development Fees

Schedule of Items, Base Contract Period*: 1 April 2011 – 31 March 2012

Simplified Acquisition of Base Engineering Requirements (SABER): Provide all necessary resources to perform all work required, complete and in strict compliance with the specifications and terms and conditions of the contract and any resulting task orders (TOs). All work shall conform to the requirements of the Statement of Work and all contract specifications. Provide coefficient percentage for each area described for the base year and all option years.

Description

Estimated**

Dollar Amount

Pricing****

Coefficient

Estimated**

Price

Small Projects: All task orders with a project magnitude under $200,000.

Response is 7 days.

Standard Hours $75,000.00

Non-Standard Hours $120,000.00

Restricted Area $25,000.00

Large Projects: All task orders with a project magnitude between $200,001 and

$750,000. Response is 14 days.

Standard Hours $450,000.00

Non-Standard Hours $300,000.00

Restricted Area $550,000.00

Non-Priced Items (NPI): Government will pay actual cost of NPI plus coefficient. $135,000.00

Proposal Development Fee***: Offeror shall perform all work as prescribed in this solicitation.

Estimated**

No. of Projects

Proposal***

Development

Fees

Small Projects (Less than $200,000) 8

Large Projects ($200,001 to $750,000) 4

Base Contract Period Estimated Total:____________________

(Total of Estimated Price (right-hand column) for the Base Contract Period)

* The definitive beginning and ending dates for the contract period will be identified on the award document based on “actual” award dates. The option year dates shall run for 12 consecutive months following the last day of the previous contract period.

** The estimated dollar amounts, price, and estimated number (No.) of projects are for Price Evaluation purposes only. The estimated price shall be based on the Estimated Dollar Amount multiplied by the coefficient for each

CLIN. These are for PRICE EVALUATION purposes ONLY. The Government does not guarantee this amount of work. The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

*** Proposal development/design costs are limited by law to not exceed 6% of construction cost. The Proposal

Development Fees shall be paid to the Contractor only if the project design/proposal is complete, accepted and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the task order when awarded. Coefficients shall not be applied to this line item.

****See the attached Statement of Work (Attachment 1) for more information regarding coefficients.

Schedule of Items, Option Year One*: 1 April 2012 – 31 March 2013

Simplified Acquisition of Base Engineering Requirements (SABER): Provide all necessary resources to perform all work required, complete and in strict compliance with the specifications and terms and conditions of the contract and any resulting task orders (TOs). All work shall conform to the requirements of the Statement of Work and all contract specifications. Provide coefficient percentage for each area described for the base year and all option years.

Description

Estimated**

Dollar Amount

Response is 7 days.

Standard Hours $80,000.00

Non-Standard Hours $110,000.00

Restricted Area $30,000.00

$750,000. Response is 14 days.

Standard Hours $470,000.00

Non-Standard Hours $315,000.00

Restricted Area $590,000.00 coefficient. $60,000.00 solicitation.

Estimated**

No. of Projects

Proposal***

Development

Fees

Small Projects (Less than $200,000) 8

Large Projects ($200,001 to $750,000) 4

Option Year One Estimated Total:____________________

(Total of Estimated Price (right-hand column) for Option Year One)

* The definitive beginning and ending dates for the contract period will be identified on the award document based on “actual” award dates. The option year dates shall run for 12 consecutive months following the last day of the previous contract period.

** The estimated dollar amounts, price, and estimated number (No.) of projects are for Price Evaluation purposes only. The estimated price shall be based on the Estimated Dollar Amount multiplied by the coefficient for each

CLIN. These are for PRICE EVALUATION purposes ONLY. The Government does not guarantee this amount of work. The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

*** Proposal development/design costs are limited by law to not exceed 6% of construction cost. The Proposal

Development Fees shall be paid to the Contractor only if the project design/proposal is complete, accepted and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the task order when awarded. Coefficients shall not be applied to this line item.

Schedule of Items, Option Year Two*: 1 April 2013 – 31 March 2014

Simplified Acquisition of Base Engineering Requirements (SABER): Provide all necessary resources to perform all work required, complete and in strict compliance with the specifications and terms and conditions of the contract and any resulting task orders (TOs). All work shall conform to the requirements of the Statement of Work and all contract specifications. Provide coefficient percentage for each area described for the base year and all option years.

Description

Estimated**

Dollar Amount

Response is 7 days.

Standard Hours $40,000.00

Non-Standard Hours $115,000.00

Restricted Area $35,000.00

$750,000. Response is 14 days.

Standard Hours $490,000.00

Non-Standard Hours $330,000.00

Restricted Area $620,000.00 coefficient. $80,000.00 solicitation.

Estimated**

No. of Projects

Proposal***

Development

Fees

Small Projects (Less than $200,000) 9

Large Projects ($200,001 to $750,000) 3

Option Year Two Estimated Total:____________________

(Total of Estimated Price (right-hand column) for Option Year Two)

* The definitive beginning and ending dates for the contract period will be identified on the award document based on “actual” award dates. The option year dates shall run for 12 consecutive months following the last day of the previous contract period.

** The estimated dollar amounts, price, and estimated number (No.) of projects are for Price Evaluation purposes.

The estimated price shall be based on the Estimated Dollar Amount multiplied by the coefficient for each CLIN.

These are for PRICE EVALUATION purposes ONLY. The Government does not guarantee this amount of work.

The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

*** Proposal development/design costs are limited by law to not exceed 6% of construction cost. The Proposal

Development Fees shall be paid to the Contractor only if the project design/proposal is complete, accepted and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the task order when awarded. Coefficients shall not be applied to this line item.

Schedule of Items, Option Year Three*: 1 April 2014 – 31 March 2015

Simplified Acquisition of Base Engineering Requirements (SABER): Provide all necessary resources to perform all work required, complete and in strict compliance with the specifications and terms and conditions of the contract and any resulting task orders (TOs). All work shall conform to the requirements of the Statement of Work and all contract specifications. Provide coefficient percentage for each area described for the base year and all option years.

Description

Dollar Amount

Response is 7 days.

Standard Hours $45,000.00

Non-Standard Hours $120,000.00

Restricted Area $45,000.00

$750,000. Response is 14 days.

Standard Hours $500,000.00

Non-Standard Hours $350,000.00

Restricted Area $620,000.00 coefficient. $85,000.00 solicitation.

Estimated**

No. of Projects

Proposal***

Development

Fees

Small Projects (Less than $200,000) 9

Large Projects ($200,001 to $750,000) 3

Option Year Three Estimated Total:____________________

(Total of Estimated Price (right-hand column) for Option Year Three)

* The definitive beginning and ending dates for the contract period will be identified on the award document based on “actual” award dates. The option year dates shall run for 12 consecutive months following the last day of the previous contract period.

** The estimated dollar amounts, price, and estimated number (No.) of projects are for Price Evaluation purposes only. The estimated price shall be based on the Estimated Dollar Amount multiplied by the coefficient for each

CLIN. These are for PRICE EVALUATION purposes ONLY. The Government does not guarantee this amount of work. The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

*** Proposal development/design costs are limited by law to not exceed 6% of construction cost. The Proposal

Development Fees shall be paid to the Contractor only if the project design/proposal is complete, accepted and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the task order when awarded. Coefficients shall not be applied to this line item.

Schedule of Items, Option Year Four*: 1 April 2015– 31 March 2016

Simplified Acquisition of Base Engineering Requirements (SABER): Provide all necessary resources to perform all work required, complete and in strict compliance with the specifications and terms and conditions of the contract and any resulting task orders (TOs). All work shall conform to the requirements of the Statement of Work and all contract specifications. Provide coefficient percentage for each area described for the base year and all option years.

Description

Estimated**

Dollar Amount

Response is 7 days.

Standard Hours $55,000.00

Non-Standard Hours $125,000.00

Restricted Area $50,000.00

$750,000. Response is 14 days.

Standard Hours $540,000.00

Non-Standard Hours $365,000.00

Restricted Area $680,000.00 coefficient. $100,000.00 solicitation.

Estimated**

No. of Projects

Proposal***

Development

Fees

Small Projects (Less than $200,000) 6

Large Projects ($200,001 to $750,000) 5

Option Year Four Estimated Total:____________________

(Total of Estimated Price (right-hand column) for Option Year Four)

* The definitive beginning and ending dates for the contract period will be identified on the award document based on “actual” award dates. The option year dates shall run for 12 consecutive months following the last day of the previous contract period.

** The estimated dollar amounts, price, and estimated number (No.) of projects are for Price Evaluation purposes only. The estimated price shall be based on the Estimated Dollar Amount multiplied by the coefficient for each

CLIN. These are for PRICE EVALUATION purposes ONLY. The Government does not guarantee this amount of work. The guaranteed minimum for this contract can be found in Block 10 of the SF 1442.

*** Proposal development/design costs are limited by law to not exceed 6% of construction cost. The Proposal

Development Fees shall be paid to the Contractor only if the project design/proposal is complete, accepted and ready for award but not funded for construction at the time of acceptance. If this fee is paid prior to construction funding, the fee shall be deducted from the task order when awarded. Coefficients shall not be applied to this line item.

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 1 Lot Base Year, SABER

FFP

Base Year, SABER. Contractor shall provide all labor, supplies, materials, supervision, transportation and equipment necessary for estimation and construction efforts issue by individual task orders in accordance with the SABER contract and the statement of work for each task order at Dyess Air Force Base, Texas.

The estimated amount for this CLIN shall be the Base Contract Period Estimated

Total from The Schedule of Items, Base Contract Period, located on page 3 of this solicitation.

FOB: Destination

SIGNAL CODE: A

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 8,000 Square

Foot

Asbestos Abatement No Carpet

FFP

Asbestos Abatement for no carpet areas in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic (No Carpet) for the base year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (no carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (no carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (No Carpet) Base Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

101 – 1000 SF: 2,500 SF $_________

Over 1000 SF: 3,000 SF $_________

UNIT UNIT PRICE MAX AMOUNT

0003 8,000 Square

Asbestos Abatement Including Carpet

Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic

(includes Carpet Over Tile) in accordance with the Statement of Work, Attachment 1, 4.2.2.7, for the base year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (including carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (including carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (Including Carpet) Base Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

101 – 1000 SF: 2,500 SF $_________

Over 1000 SF: 3,000 SF $_________

UNIT UNIT PRICE MAX AMOUNT

0004 8,000 Square

Demo/Abatement Ceilings/Walls up to 15'

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls up to

15 feet high for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for Ceilings and Walls up to

15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement Ceilings and Walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls up to 15' high Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

0005 8,000 Square

Demo/Asbestos Abate. Ceilings 15' - 30'

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls (15 to

30 feet high) for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for Ceilings and Walls 15' to 30' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement Ceilings and Walls 15' - 30' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls 15' to 30' high, Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

0006 8,000 Square

Demo/Asbestos Abatement Drywall to 15"

Demo and perform Asbestos Abatement of Drywall Walls (Include Ceramic Wall

Tile) to 15 feet high for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for drywall walls up to

15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement drywall walls up to 15' high is

8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Drywall Walls up to 15' high Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

1001 1 Lot OPTION Option Year One, SABER

FFP

Base Year, SABER. Contractor shall provide all labor, supplies, materials, supervision, transportation and equipment necessary for estimation and construction efforts issue by individual task orders in accordance with the SABER solicitation.

UNIT UNIT PRICE MAX AMOUNT

1002 8,000 Square

OPTION Asbestos Abatement No Carpet

Asbestos Abatement for no carpet areas in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic (No Carpet) for the base year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (no carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (no carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (No Carpet) Base Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

1003 8,000 Square

OPTION Asbestos Abatement Including Carpet

Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic

(includes Carpet Over Tile) in accordance with the Statement of Work, Attachment 1, 4.2.2.7, for the base year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (including carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (including carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (Including Carpet) Base Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

101 – 1000 SF: 2,500 SF $_________

Over 1000 SF: 3,000 SF $_________

UNIT UNIT PRICE MAX AMOUNT

1004 8,000 Square

OPTION Demo/Abatement Ceilings/Walls up to 15'

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls up to

15 feet high for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for Ceilings and Walls up to

15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement Ceilings and Walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls up to 15' high Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

1005 8,000 Square

OPTION Demo/Asbestos Abate. Ceilings 15' - 30'

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls (15 to

30 feet high) for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for Ceilings and Walls 15' to 30' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement Ceilings and Walls 15' - 30' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls 15' to 30' high, Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

1006 8,000 Square

OPTION Demo/Asbestos Abatement Drywall to 15"

Demo and perform Asbestos Abatement of Drywall Walls (Include Ceramic Wall

Tile) to 15 feet high for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for drywall walls up to

15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement drywall walls up to 15' high is

8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Drywall Walls up to 15' high Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

2001 1 Lot OPTION Option Year Two, SABER

FFP

Base Year, SABER. Contractor shall provide all labor, supplies, materials, supervision, transportation and equipment necessary for estimation and construction efforts issue by individual task orders in accordance with the SABER solicitation.

UNIT UNIT PRICE MAX AMOUNT

2002 8,000 Square

Asbestos Abatement for no carpet areas in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic (No Carpet) for the base year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (no carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (no carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (No Carpet) Base Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

2003 8,000 Square

Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic

(includes Carpet Over Tile) in accordance with the Statement of Work, Attachment 1, 4.2.2.7, for the base year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (including carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (including carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (Including Carpet) Base Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

101 – 1000 SF: 2,500 SF $_________

Over 1000 SF: 3,000 SF $_________

UNIT UNIT PRICE MAX AMOUNT

2004 8,000 Square

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls up to

15 feet high for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for Ceilings and Walls up to

15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement Ceilings and Walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls up to 15' high Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

2005 8,000 Square

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls (15 to

30 feet high) for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for Ceilings and Walls 15' to 30' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement Ceilings and Walls 15' - 30' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls 15' to 30' high, Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

2006 8,000 Square

Demo and perform Asbestos Abatement of Drywall Walls (Include Ceramic Wall

Tile) to 15 feet high for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for drywall walls up to

15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement drywall walls up to 15' high is

8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Drywall Walls up to 15' high Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

3001 1 Lot OPTION Option Year Three, SABER

FFP

Base Year, SABER. Contractor shall provide all labor, supplies, materials, supervision, transportation and equipment necessary for estimation and construction efforts issue by individual task orders in accordance with the SABER solicitation.

UNIT UNIT PRICE MAX AMOUNT

3002 8,000 Square

Asbestos Abatement for no carpet areas in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic (No Carpet) for the base year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (no carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (no carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (No Carpet) Base Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

3003 8,000 Square

Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic

(includes Carpet Over Tile) in accordance with the Statement of Work, Attachment 1, 4.2.2.7, for the base year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (including carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (including carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (Including Carpet) Base Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

101 – 1000 SF: 2,500 SF $_________

Over 1000 SF: 3,000 SF $_________

UNIT UNIT PRICE MAX AMOUNT

3004 8,000 Square

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls up to

15 feet high for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for Ceilings and Walls up to

15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement Ceilings and Walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls up to 15' high Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

3005 8,000 Square

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls (15 to

30 feet high) for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for Ceilings and Walls 15' to 30' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement Ceilings and Walls 15' - 30' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls 15' to 30' high, Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

3006 8,000 Square

Demo and perform Asbestos Abatement of Drywall Walls (Include Ceramic Wall

Tile) to 15 feet high for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for drywall walls up to

15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement drywall walls up to 15' high is

8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Drywall Walls up to 15' high Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

4001 1 Lot OPTION Option Year Four, SABER

FFP

Base Year, SABER. Contractor shall provide all labor, supplies, materials, supervision, transportation and equipment necessary for estimation and construction efforts issue by individual task orders in accordance with the SABER solicitation.

UNIT UNIT PRICE MAX AMOUNT

4002 8,000 Square

Asbestos Abatement for no carpet areas in accordance with the Statement of

Work, Attachment 1, 4.2.2.7. Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic (No Carpet) for the base year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (no carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (no carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (No Carpet) Base Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

4003 8,000 Square

Demo Cove Base and perform Asbestos Abatement of Floor Tile and Mastic

(includes Carpet Over Tile) in accordance with the Statement of Work, Attachment 1, 4.2.2.7, for the base year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Overall estimated quantity for asbestos abatement (including carpet) is 8,000 Square Feet. Price the below amounts for asbestos abatement (including carpet) at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement (Including Carpet) Base Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

101 – 1000 SF: 2,500 SF $_________

Over 1000 SF: 3,000 SF $_________

UNIT UNIT PRICE MAX AMOUNT

4004 8,000 Square

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls up to

15 feet high for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for Ceilings and Walls up to

15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement Ceilings and Walls up to 15' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls up to 15' high Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

4005 8,000 Square

Demo and perform Asbestos Abatement of Drywall Ceilings and/or Walls (15 to

30 feet high) for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for Ceilings and Walls 15' to 30' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement Ceilings and Walls 15' - 30' high is 8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Ceilings/Walls 15' to 30' high, Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

UNIT UNIT PRICE MAX AMOUNT

4006 8,000 Square

Demo and perform Asbestos Abatement of Drywall Walls (Include Ceramic Wall

Tile) to 15 feet high for the Base Year of the contract. Shall include all costs associated with the abatement action including but not limited to sampling, testing, all abatement, and Texas state fees. Asbestos Abatement for drywall walls up to

15' high in accordance with the Statement of Work, Attachment 1, 4.2.2.7.

Overall estimated quantity for asbestos abatement drywall walls up to 15' high is

8,000 Square Feet. Price the below amounts at the estimated quantity shown.

Demo Cove Base and Asbestos Abatement Drywall Walls up to 15' high Base

Year for:

SF Est Qty Total Price

1 – 100 SF: 2,500 SF $_________

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER

VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

CLAUSES INCORPORATED BY FULL TEXT

52.216-19 ORDER LIMITATIONS. (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,000.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor:

(1) Any order for a single item in excess of $750,000.00;

(2) Any order for a combination of items in excess of $750,000.00; or

(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal

Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the

Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 30 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons.

Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause)

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government

0002 N/A N/A N/A Government

0003 N/A N/A N/A Government

0004 N/A N/A N/A Government

0005 N/A N/A N/A Government

0006 N/A N/A N/A Government

1001 N/A N/A N/A Government

1002 N/A N/A N/A Government

1003 N/A N/A N/A Government

1004 N/A N/A N/A Government

1005 N/A N/A N/A Government

1006 N/A N/A N/A Government

2001 N/A N/A N/A Government

2002 N/A N/A N/A Government

2003 N/A N/A N/A Government

2004 N/A N/A N/A Government

2005 N/A N/A N/A Government

2006 N/A N/A N/A Government

3001 N/A N/A N/A Government

3002 N/A N/A N/A Government

3003 N/A N/A N/A Government

3004 N/A N/A N/A Government

3005 N/A N/A N/A Government

3006 N/A N/A N/A Government

4001 N/A N/A N/A Government

4002 N/A N/A N/A Government

4003 N/A N/A N/A Government

4004 N/A N/A N/A Government

4005 N/A N/A N/A Government

4006 N/A N/A N/A Government

CLAUSES INCORPORATED BY REFERENCE

52.246-12 Inspection of Construction AUG 1996

252.246-7000 Material Inspection And Receiving Report MAR 2008

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 01-APR-2011 TO

31-MAR-2012

N/A 7 CES/CC/ENGINEERING - F1R310

DANIEL FRIEBERG

710 3RD STREET

DYESS AFB TX 79607

325-696-5617

F1R310

0002 POP 01-APR-2011 TO

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 01-APR-2011 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 01-APR-2011 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 01-APR-2011 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 01-APR-2011 TO

N/A (SAME AS PREVIOUS LOCATION)

1001 POP 01-MAR-2012 TO

31-MAR-2013

N/A (SAME AS PREVIOUS LOCATION)

1002 POP 01-APR-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

1003 POP 01-APR-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

1004 POP 01-APR-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

1005 POP 01-APR-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

1006 POP 01-APR-2012 TO

N/A (SAME AS PREVIOUS LOCATION)

2001 POP 01-APR-2013 TO

31-MAR-2014

N/A (SAME AS PREVIOUS LOCATION)

2002 POP 01-APR-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

2003 POP 01-APR-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

2004 POP 01-APR-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

2005 POP 01-APR-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

2006 POP 01-APR-2013 TO

N/A (SAME AS PREVIOUS LOCATION)

3001 POP 01-APR-2014 TO

31-MAR-2015

N/A (SAME AS PREVIOUS LOCATION)

3002 POP 01-APR-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

3003 POP 01-APR-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

3004 POP 01-APR-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

3005 POP 01-APR-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

3006 POP 01-APR-2014 TO

N/A (SAME AS PREVIOUS LOCATION)

4001 POP 01-APR-2015 TO

31-MAR-2016

N/A (SAME AS PREVIOUS LOCATION)

4002 POP 01-APR-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

4003 POP 01-APR-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

4004 POP 01-APR-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

4005 POP 01-APR-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

4006 POP 01-APR-2015 TO

N/A (SAME AS PREVIOUS LOCATION)

52.211-13 Time Extensions SEP 2000

52.242-14 Suspension of Work APR 1984

52.242-15 Stop-Work Order AUG 1989

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than . * The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government. Each task order will have independent liquidated damages assigned depending on location and magnitude of work.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

5352.242-9000 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (Aug 2007)

(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.

(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or security police for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, and valid vehicle insurance certificate, to obtain a vehicle pass.

(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.

(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with citing the appropriate paragraphs as applicable.

(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.

(f) Failure to comply with these requirements may result in withholding of final payment.

Section G - Contract Administration Data

52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

MAR 2008

Section I - Contract Clauses

52.203-3 Gratuities APR 1984

52.203-5 Covenant Against Contingent Fees APR 1984

52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006

52.203-7 Anti-Kickback Procedures OCT 2010

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

JAN 1997

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997

52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-15 Whistleblower Protections Under the American Recovery and

Reinvestment Act of 2009

JUN 2010

52.204-4 Printed or Copied Double-Sided on Recycled Paper AUG 2000

52.204-7 Central Contractor Registration APR 2008

52.204-9 Personal Identity Verification of Contractor Personnel SEP 2007

52.204-11 American Recovery and Reinvestment Act--Reporting

Requirements

JUL 2010

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

SEP 2006

52.211-18 Variation in Estimated Quantity APR 1984

52.214-26 Audit and Records--Sealed Bidding OCT 2010

52.215-2 Audit and Records--Negotiation OCT 2010

52.215-8 Order of Precedence--Uniform Contract Format OCT 1997

52.219-3 Notice of Total HUBZone Set-Aide JAN 1999

52.219-8 Utilization of Small Business Concerns MAY 2004

52.219-9 Small Business Subcontracting Plan OCT 2010

52.219-14 Limitations On Subcontracting DEC 1996

52.219-16 Liquidated Damages-Subcontracting Plan JAN 1999

52.222-1 Notice To The Government Of Labor Disputes FEB 1997

52.222-3 Convict Labor JUN 2003

52.222-4 Contract Work Hours and Safety Standards Act - Overtime

Compensation

JUL 2005

52.222-6 Davis Bacon Act JUL 2005

52.222-7 Withholding of Funds FEB 1988

52.222-8 Payrolls and Basic Records JUN 2010

52.222-9 Apprentices and Trainees JUL 2005

52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) JUL 2005

52.222-12 Contract Termination-Debarment FEB 1988

52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988

52.222-14 Disputes Concerning Labor Standards FEB 1988

52.222-15 Certification of Eligibility FEB 1988

52.222-21 Prohibition Of Segregated Facilities FEB 1999

52.222-22 Previous Contracts And Compliance Reports FEB 1999

52.222-26 Equal Opportunity MAR 2007

52.222-27 Affirmative Action Compliance Requirements for

Construction

FEB 1999

52.222-30 Davis-Bacon Act--Price Adjustment (None or Separately

Specified Method)

DEC 2001

52.222-35 Equal Opportunity For Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans

SEP 2010

52.222-36 Affirmative Action For Workers With Disabilities OCT 2010

52.222-37 Employment Reports on Veterans SEP 2010

52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997

52.223-5 Alt I Pollution Prevention and Right-to-Know Information (Aug

2003) Alternate I

AUG 2003

52.223-6 Drug-Free Workplace MAY 2001

52.223-10 Waste Reduction Program AUG 2000

52.223-11 Ozone-Depleting Substances MAY 2001

52.223-12 Refrigeration Equipment and Air Conditioners MAY 1995

52.223-14 Toxic Chemical Release Reporting AUG 2003

52.224-1 Privacy Act Notification APR 1984

52.224-2 Privacy Act APR 1984

52.225-12 Notice of Buy American Act Requirement - Construction

Materials Under Trade Agreements

FEB 2009

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.225-21 Required Use of American Iron, Steel, and Other

Manufactured Goods--Buy American Act--Construction

Materials.

MAR 2009

52.225-22 Notice of Required Use of American Iron, Steel, and Other

Manufactured Goods--Buy American Act--Construction

Materials.

MAR 2009

52.