Attachment 2 - Statement of Work (15 January 26).pdf
PDF 223 KB Posted
- Attached to
- ASM Air Compressor
- Solicitation number
- FA465926QZ002
About this file
This is a Statement of Work (SOW) for the procurement and installation of air compressors at Grand Forks Air Force Base, North Dakota, effective January 15, 2026.
The contractor must procure two Atlas Copco Model GA37VSD AP Variable Speed Air Compressors (50 HP, 460/3 Ph/60 Hz, 27.7–244.9 CFM at 175 PSI maximum operating pressure) with specified features including IE5 efficiency motor, IP66 environment protection, acoustic enclosure rated at 71 dB(A), Elektronikon Touch Controller, SMARTLINK remote monitoring, integrated bulk water separator, and compact footprint of 34" W x 34" D x 68" H. The compressors must qualify for a 10-year warranty through Atlas Copco. The contractor must conduct a mandatory site visit to Building 622, Room 118 (the Corrosion Control facility) within 10 calendar days of contract award to coordinate with Aircraft Structural Maintenance personnel. Task 2 requires complete removal and off-site disposal of the existing Sullivan Palatek 100UDG air compressor (80"L x 45"W x 65"H, approximately 3,700 lbs). Task 3 involves installation per federal, state, and local regulations, including uncrating, electrical connections, plumbing installation for 2" Prevost aluminum pipe and fittings to tie into existing airlines, ductwork for air intake and exhaust, permit acquisition, and cleanup. Initial start-up must be completed by a certified Atlas Copco technician and registered within 90 days to qualify for extended warranty. Task 4 requires operator and maintenance training for designated government personnel. The compressor installation area is constrained to 11 feet wide by 12 feet wide; any additional space requirements must be communicated in writing prior to procurement.
Operations are conducted Monday-Friday, 0700–1500 hours, excluding federal holidays and designated 319 RW family/down days. The government provides all utilities, restrooms, and phones. Base access procedures require contractor compliance with security protocols, including Large Volume Issuance Request submission for contracts with more than 10 employees, anti-terrorism Level 1 training certification for all personnel with facility access, and adherence to base traffic regulations. Foreign nationals require additional background checks and temporary worker visa approval, with mandatory escorted access or requests for unescorted access taking up to 15 additional days.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
ASM AIR COMPRESSORS
1/15/2026
1. DESCRIPTION OF SERVICES / GENERAL INFORMATION. The contractor shall provide all management, tools, supplies, equipment and labor necessary to ensure that Air Compressor procurement & installation services are performed in Room 118, Building 622, Grand Forks AFB, ND in a manner that will maintain a satisfactory and fully operational condition. Air Compressor procurement & installation tasks performed shall be in accordance with applicable federal, state, and local regulations, and follow the procedures outlined in the respective approved plans.
1.1. DESCRIPTION OF WORK:
- Task 1: Procure two (2) Air Compressors that meet and/or exceed the requirements as stated in the SOW. Contractor site visit to Grand Forks AFB Building 622 will be required prior to procurement of air compressors. Contractor shall coordinate site visit with Aircraft Structural Maintenance personnel within 10 calendar days of contract award. Contractor shall be responsible for all requirements for base access.
- Task 2: Remove and disposal of existing air compressor. Under no circumstances shall the removed equipment be disposed of on the government installation.
- Task 3: Install air compressor as required in accordance with the SOW. Initial start-up must be completed by certified Atlas Copco technician and be registered with Atlas Copco within 90 days to qualify for Extended warranty on compressor through Atlas Copco.
- Task 4: Provide training on air compressors.
1.1.1 PROCUREMENT OF AIR COMPRESSORS. The contractor shall ensure that two (2) air compressors are installed within the Compressor Room (Room 118) of the Corrosion Control facility of building 622 on Grand Forks Air Force Base. The air compressors to be installed shall meet or exceed the following characteristics:
- Atlas Copco Model GA37VSD AP Variable Speed Air Compressor
- 50 HP, 460 / 3 Ph / 60 Hz Electrical
- 27.7 – 244.9 CFM (175 PSI Max Operating Pressure)
- FASR Motor: IE5 Efficiency, IP66 (NEMA4X) Environment Protection, Oil Cooled
Bearings
- NEOS Next Inverter: IP54 Protection from Dust & Dirt, Exceeds IES2 Efficiency
Requirements
- Acoustic Enclosure for Quiet Operation: 71 dB(A)
- Elektronikon® Touch Controller
- Easy, Cost Saving Maintenance
- SMARTLINK Remote Monitoring to Maximize Air System Performance & Energy
Savings
- Integrated Bulk Water Separator w/ No-Loss Drain
- Compact Footprint: 34” (W) x 34” (D) x 68” (H)
- Must qualify for 10 year warranty on compressor through Atlas Copco
1.1.2 INSTALLATION OF AIR COMPRESSORS. The contractor shall install the procured air compressors in accordance with all federal, state, and local rules and regulations.
- Contractor shall perform the complete removal, transportation, and off-site disposal of the existing Sullivan Palatek 100UDG air compressor (80”L x 45”W x 65”H, approx. 3,700 lbs) and any associated hardware not required for the new compressor installation. Under no circumstances shall the removed equipment be disposed of on the government installation.
- Uncrating of equipment, supply all necessary assembly hardware, piping and mechanical erection of the equipment.
- Providing adequate lifting devices (forklift/scissors lifts) capable of lifting men or equipment to any point necessary during installation.
- Contractor shall be responsible for receiving, off-loading, and securing all necessary equipment components.
- Completing any electrical connections required for installation.
- Contractor shall ensure that all electrical components or energized equipment installed are properly grounded.
- Contractor shall be required to install any electrical components to include circuit breakers, wiring, etc. required for the installation of the air compressors.
- Plumbing Installation for 2” prevost Aluminum pipe and fittings to tie into existing airlines
- Ductwork relating to installation of system for air intake and exhaust.
- Contractor shall be responsible for securing any necessary permits & paying applicable taxes for installation of the air compressors.
- Contractors shall be required to dispose of any packaging materials to include, but not limited to, crates & wraps that were shipped to the job site.
- Clean up of equipment and working area in which the installation is performed.
- Training of designated government personnel in operation and maintenance of all components installed.
- Compressor shall fit in an 11ft wide by 12 ft wide area. Any additional space needed (other than is already provided in install area dictated by Government) by proposed compressors for install shall be conveyed, in writing, to Government prior to procurement.
1.1.3. SAFETY BARRIERS. The contractor shall provide all construction support equipment items to control and secure the installation site and any remote storage areas, including sanitary facilities, barriers, barricades, scaffolding, fences, traffic/parking signs/signals, and flag persons when required. The contractor is responsible for the erection and safe application of all equipment.
1.1.4. ENVIRONMENTAL COMPLIANCE. Contractor shall abide and follow all federal, state, and local environmental regulations and restrictions. Any hazardous waste to potentially be generated by Contractor shall be conveyed to Government in advance for storage planning purposes.
2. GENERAL INFORMATION.
2.1. HOURS OF OPERATION. 0700-1500, Monday-Friday with the exception of federal holidays and designated 319 RW family/down days.
2.2. HOLIDAYS OBSERVED. New Year’s Day , Martin Luther King Day, President’s Day,
3.19 Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving, Christmas Day.
2.3. UTILITIES: All utilities (electrical, potable water, restroom, phones) shall be supplied by the Government for Contractor use.
2.4. BASE ENTRY PROCEDURES AND SECURITY REQUIREMENTS:
2.4.4. Minimum Security Requirements (All Areas Including Base Entry).
2.4.4.1. Sponsoring Squadrons for approved contracts with more than 10 employees will submit a Large Volume Issuance Request (LVIR) to the Pass and Registration office no later than 10 days prior to the contract start date.
2.4.4.1.1. LVIR MUST include the following: employee full name, driver’s license state/number, social security number, date of birth, country of citizenship, contract start/end date, authorized day/times for base access, authorized locations, and sponsors contact information.
2.4.4.1.1.1 Contractors and employees that are foreign nationals must undergo additional background checks and processing before being issued a visitor's pass. This includes all non-U.S.
citizens who hold a foreign passport and are not a U.S. permanent resident.
2.4.4.1.1.2. Foreign nationals must submit a temporary worker visa that has been approved by the United States through the sponsoring squadron to the Pass & Registration office no later than three days in advance for processing.
2.4.4.1.1.3. All Foreign Workers will have ESCORTED access and must always remain with the sponsor while on the installation. Request for UNESCORTED access can take up to 15 additional days to receive approval.
2.4.4.2. Although contractors will not be issued vehicles passes vehicles are subject to search while on the installation. Employee privately owned vehicles will not be allowed access to restricted/controlled areas without a free zone being established. Company vehicles will be allowed access to restricted/controlled areas.
2.4.4.3. All Contractor vehicles should have markings with the company name for quick identification of ownership and notification if they are involved in an incident.
2.4.4.4. Conduct Requirements. The contractor shall ensure that his/her employees comply with all base traffic regulations and properly conduct themselves while on the base.
2.4.5 Anti-Terrorism (AT)
2.4.5.1 All contractor employees requiring access to any Federally controlled facility and logical access to Federally controlled information systems except for “national security systems” as defined by 44 U.S.C. 3542(b)(2), should be certified in Level 1 Antiterrorism Training. The training is accessible from any computer with access to the World Wide Web and is available at https:/atlevel1.dtic.mil/at. The AT coordinator for the customer unit (319 CES) is responsible for coordinating this training. The contractor is responsible for ensuring that the training has been satisfactorily completed and that valid certificates of completion have been submitted to the Contracting Officers Representative (COR) with a copy furnished to the Contracting Officer.
The Certificates are valid for one year; therefore, training shall be completed every year for the duration of the contract.
2.4.5.2. Unit anti-terrorism managers will be responsible for organizing this level 1 training.
3. APPENDICES.
A. Maps and/or Site Plans
APPENDIX A
MAPS AND/OR SITE PLANS
Building 622 Map
File details come from the government source that posted it. Updated .