FA465426R0009 Questions and Answers Interiors IDIQ as of 9.01.2026.docx
DOCX document 20 KB Posted
- Solicitation number
- FA465426R0009
About this file
This is a Questions and Answers document for IDIQ solicitation FA465426R0009 for interior facility repairs at Grissom Air Reserve Base, Indiana, issued as of August 27, 2026. The document clarifies specifications and evaluation criteria for the indefinite delivery/indefinite quantity contract covering painting, flooring replacement, and general interior finishing across multiple installation facilities at the base.
Key clarifications include: Amendment 0001 corrected multiple Contract Line Item Numbers (CLINs) from linear foot to square foot measurements for paint wall (CLINs 0001 and 0008), miscellaneous paint (CLIN 0002), and carpet removal (CLINs 0009 and 0010) to facilitate accurate pricing. CLIN 0012 specifies carpet tile installation, CLIN 0015 requires industry-standard rubber tile for entry areas, and CLIN 0002 encompasses miscellaneous paint areas including oddly-shaped surfaces not shown on drawings. For past performance evaluation, only recent and relevant work performed by the prime contractor within approximately five years is required; however, first-tier subcontractors performing critical elements may submit experience with a signed teaming agreement, though prime contractor performance may be weighted more heavily. Commercial and private-sector projects are acceptable as past performance references. Offerors must provide project title, customer, contract value, period of performance, scope, contact information, and federal contract numbers where applicable. Amendment 0001 also revised Section M to evaluate both base-period and option-period pricing rather than base period alone. Estimated quantities in the Proposal Price Worksheet are for evaluation purposes only with no guaranteed quantities. Each order under the IDIQ has a separate 90-calendar-day performance period, negotiable based on complexity. The 14-calendar-day mobilization requirement specified in SF 1442 takes precedence over the 60-calendar-day reference in specifications. Winter work restrictions (November 15 through April 15 and below 45 degrees) may be waived with Civil Engineering Office approval. Contractors are responsible for asbestos and lead testing; the Government does not provide pre-existing survey information. One qualified individual may serve as Quality Control Manager, Superintendent, and SSHO simultaneously.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA465426R0009, IDIQ – Interiors, Questions and Answers As of 27 August 2026
1. On the Price Analysis Work Sheet, CLIN 0001 and 0008 both say Paint Wall. One is in Linear Foot and the other in Square Foot. If CLIN 0001 is to be in Linear Foot, how would a typical room be measured? Is there a height limit on the wall to develop a maximum? A square foot of painted surface is needed to develop our material and labor for the CLIN.
0. Amendment 0001 corrected CLINs 0001 and 0008 to square foot.
1. Both carpet removal line items, CLIN 0009 and 0010, are in Linear Foot. Should these items be in Square Foot? It is hard to develop a price without knowing the length and width of the area needing carpet removal.
1. Amendment 0001 corrected CLINs 0009 and 0010 to square foot.
1. What does CLIN 0002 Paint Miscellaneous include? The unit for this CLIN is in Linear Foot which means this item is limited to trim items, piping, and similar items?
2. Amendment 0001 correct CLIN 0002 to square foot. It includes misc paint areas above what is shown on the drawings to ensure coverage. Some wall areas are oddly shaped and not shown easily on drawings. If there are aeras that have left over square footage and alternative areas in the same facility will be addressed during construction.
1. Is there a specification for CLIN 0015 Rubber? Is the rubber to be in squares or rolls? What is the rubber thickness?
3. Use industry standard for rubber tile. Intent is for an entry area for snow and water.
1. Which type of carpet installation does CLIN 0012 cover? There is a noticeable price difference between carpet rolls and carpet tiles.
4. Carpet tile.
1. Past Performance – Key Personnel Experience: For Factor 1 – Past Performance, may an offeror demonstrate relevant experience through its owner or key management personnel when that individual personally managed or directed projects of substantially similar scope while employed by another organization? If so, what documentation should be provided to establish that experience?
answer. No. The past performance shall be performance performed by the prime contractor for performance that is recent and relevant. The solicitation is not structured in a way that unreasonably restricts competition so past performance shall be from the prime contractor only.
1. Recent and Relevant: Could the Government please define the criteria it will use to determine whether a past-performance project is considered “recent and relevant,” including any applicable recency period and whether relevance will be based on scope, magnitude, complexity, or other characteristics?
Answer: This is a basic commercial service and is solicited IAW RFO part 12. The Government has broad discretion to evaluate recency and relevancy. Generally, recency can be within 5 years and relevancy needs to be work equal to, or similar to, the work in this IDIQ. Please note that this solicitation is being solicited IAW RFO part 12. It appears that you may be asking questions based on the assumption that this is a FAR part 15 solicitation that requires very lengthy Section L & Ms. Those lengthy Section L & Ms are no longer required with the authorization of soliciting commercial construction as a RFO part 12 solicitation. The Government has been given very broad discretion for Section L & Ms.
1. Commercial Past Performance: Please confirm whether relevant commercial/private-sector projects may be submitted for Factor 1 and whether prior Federal construction experience is required.
Answer: Yes, commercial/private-sector projects are absolutely welcome to be submitted as past performance.
1. Subcontractor Past Performance: May an offeror submit recent and relevant past performance from a proposed subcontractor or teaming partner? If so, how will that experience be considered in the Past Performance evaluation?
Answer: Yes. In accordance with 13 CFR § 125.2(g), because this is a small business set-aside, the Government will consider the recent and relevant past performance of proposed first-tier subcontractors, provided those subcontractors are designated to perform critical elements of the requirement.
To be considered, the offeror must clearly identify the specific role the subcontractor will perform and submit a signed teaming agreement or letter of commitment. The Government reserves the right to weight the prime contractor’s own past performance more heavily than that of a proposed subcontractor.
1. Past Performance Information: What specific information does the Government require for each of the two past-performance references (e.g., project title, customer, contract value, period of performance, scope, and reference contact information)?
Answer: All of the above is satisfactory. Please also provide the contract number for federal contracts. The Contracting Officer will reach out for more information if necessary.
1. Option Price Evaluation: Section M incorporates FAR 52.217-3, Evaluation Exclusive of Options. Please confirm whether price evaluation for award will be based solely on the base-period CLINs or whether option-period CLIN pricing will also be included in the evaluated price.
Answer: Thank you for identifying this. Amendment 0001 removes this provision. Section M has also been amended to state that the base period and option periods will be used for price evaluations.
1. Estimated Quantities: Please confirm whether the quantities identified in the Proposal Price Worksheet are estimated quantities for evaluation/ordering purposes and do not represent guaranteed quantities.
Answer: Quantities are estimated quantities only – which are used for proposal price analysis to identify the awardee. Price analysis for evaluation will be based on the base period and all options. There are no guaranteed quantities.
1. 90-Day Performance Period: Please confirm whether the 90-calendar-day performance period applies separately to each order/task issued under the IDIQ rather than to the overall IDIQ ordering period.
Answer: The 90-day performance period applies to each order but can be negotiated based on the complexity of the order.
1. Winter Work Restriction: The PWS states that work is not to be accomplished from November 15 through April 15 and below 45 degrees. Please confirm whether this restriction applies to the interior painting, flooring, and repair work under this solicitation.
Answer: The contractor can perform this work if approved by the Civil Engineering Office. The Government will provide flexibility when applicable.
1. Asbestos/Lead: Will the Government provide existing asbestos and/or lead survey information for the facilities included in the base and option work? If testing identifies ACM or lead-containing materials requiring regulated abatement, will that work be separately ordered/compensated, or should those costs be incorporated into the applicable unit prices?
Answer: It is the responsibility of the contractor to test.
1. Project Staffing: Please clarify whether the Quality Control Manager, Superintendent, and SSHO must be separate individuals or whether a qualified individual may perform more than one of these roles.
Answer: One individual can perform all of the roles.
1. Mobilization/Start Requirement: The SF 1442 requires performance to begin within 14 calendar days, while Section 01 30 00 references mobilization within 60 calendar days after award. Please clarify the controlling mobilization/start requirement.
The SF 1442 dates take precedence over any attached drawings or specifications.
File details come from the government source that posted it. Updated .