QUESTION_AND_ANSWER_(Autosaved).docx

DOCX document 15 KB Posted

Attached to
Renovate and Constuct Addition Bldg 421 Federal contract opportunity
Solicitation number
FA4654-15-R-0002
Issued by
Department of the Air Force Reserve Command

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Renovate and Constuct Addition Bldg 421, newest first.
File Type Posted
Q_ _A_Rubber_Removal.docx DOCX document
FA4654-15-R-0002-0004.doc DOC document
FA4654-15-R-00002-0003_(2).doc DOC document
Question_2_Answer.docx DOCX document
site_visit_sign_in_sheet.pdf PDF
FA4654-15-R-0002-0002.doc DOC document
FA4654-15-R-0002_AMENDMENT_1.doc DOC document
WAGE_DETERMINATION_FOR_BUILDING_421.txt TXT text file
FA4654-15-R-0002.doc DOC document
117016_Final_Specifications.pdf PDF
117016_Final_Drawings.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTION AND ANSWER

FA4654-15-R-0002 RENOVATE AND CONSTRUCT ADDITION BUILDING 421

1. QUESTION:

The bid form on page 3 of the solicitation divides this project into two Items. They both refer to a Statement of Work for both items, but I cannot find the Statements of Work in the solicitation. The contract drawing also do not show a division of work. Please clarify. Thank you

1. ANSWER:

The new addition is identified on S101 detail 3. Bid item 0002 refers to items of work related within the boundaries of the new addition. This will be a problem for most bidders, they will need to really study the drawings to separate.

2. QUESTION:

The drawings (A501) and door schedule (A601) call for new "Overhead Rolling Doors". Specifications exist for Metal Doors but do not mention this type of door, which would normally be found in specification section 08 58 13. Please provide specifications covering this type of door.

2. ANSWER:

Please see attached “Question 2 Answer”.

3. QUESTION:

Could you tell me what the Performance & Payment requirement is and the Maintenance/Warranty terms are?

3. Answer:

(1) Performance Bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

Warranty terms are 12 months.