QUESTION_AND_ANSWER_(Autosaved).docx
DOCX document 15 KB Posted
- Attached to
- Renovate and Constuct Addition Bldg 421 Federal contract opportunity
- Solicitation number
- FA4654-15-R-0002
About this file
Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q_ _A_Rubber_Removal.docx | DOCX document | |
| FA4654-15-R-0002-0004.doc | DOC document | |
| FA4654-15-R-00002-0003_(2).doc | DOC document | |
| Question_2_Answer.docx | DOCX document | |
| site_visit_sign_in_sheet.pdf | ||
| FA4654-15-R-0002-0002.doc | DOC document | |
| FA4654-15-R-0002_AMENDMENT_1.doc | DOC document | |
| WAGE_DETERMINATION_FOR_BUILDING_421.txt | TXT text file | |
| FA4654-15-R-0002.doc | DOC document | |
| 117016_Final_Specifications.pdf | ||
| 117016_Final_Drawings.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTION AND ANSWER
FA4654-15-R-0002 RENOVATE AND CONSTRUCT ADDITION BUILDING 421
1. QUESTION:
The bid form on page 3 of the solicitation divides this project into two Items. They both refer to a Statement of Work for both items, but I cannot find the Statements of Work in the solicitation. The contract drawing also do not show a division of work. Please clarify. Thank you
1. ANSWER:
The new addition is identified on S101 detail 3. Bid item 0002 refers to items of work related within the boundaries of the new addition. This will be a problem for most bidders, they will need to really study the drawings to separate.
2. QUESTION:
The drawings (A501) and door schedule (A601) call for new "Overhead Rolling Doors". Specifications exist for Metal Doors but do not mention this type of door, which would normally be found in specification section 08 58 13. Please provide specifications covering this type of door.
2. ANSWER:
Please see attached “Question 2 Answer”.
3. QUESTION:
Could you tell me what the Performance & Payment requirement is and the Maintenance/Warranty terms are?
3. Answer:
(1) Performance Bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
Warranty terms are 12 months.