117016_Final_Specifications.pdf

PDF 12 MB Posted

Attached to
Renovate and Constuct Addition Bldg 421 Federal contract opportunity
Solicitation number
FA4654-15-R-0002
Issued by
Department of the Air Force Reserve Command

About this file

FA4654-15-R-0002 Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Renovate and Constuct Addition Bldg 421, newest first.
File Type Posted
Q_ _A_Rubber_Removal.docx DOCX document
FA4654-15-R-0002-0004.doc DOC document
FA4654-15-R-00002-0003_(2).doc DOC document
QUESTION_AND_ANSWER_(Autosaved).docx DOCX document
site_visit_sign_in_sheet.pdf PDF
Question_2_Answer.docx DOCX document
FA4654-15-R-0002-0002.doc DOC document
FA4654-15-R-0002_AMENDMENT_1.doc DOC document
WAGE_DETERMINATION_FOR_BUILDING_421.txt TXT text file
117016_Final_Drawings.pdf PDF
FA4654-15-R-0002.doc DOC document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grissom Air Reserve Base 434 Base Civil Engineering

Renovate Fuel Vehicle Maintenance

(FAC 421)

TECHNICAL SPECIFICATIONS

CTGC 11 – 7016A

Add/Repair Fuel Vehicle Maintenance

(FAC 421)

TECHNICAL SPECIFICATIONS

CTGC 11 – 7016C

December 16, 2014

CTGB 11-7016A&C

RENOVATE B421

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 32 00 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REQUIREMENTS

01 35 50 ENVIRONMENTAL MANAGEMENT / PROTECTION

01 35 60 STORM WATER POLLUTION PREVENTION MEASURES

01 45 10 CONTRACTOR QUALITY CONTROL

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 20 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 67 00 RECYCLED / RECOVERED MATERIALS

01 78 00 CLOSEOUT SUBMITTALS

01 78 10 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

DIVISION 03 - CONCRETE

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

03 35 00.00 10 CONCRETE FINISHING

03 39 00.00 10 CONCRETE CURING

DIVISION 04 - MASONRY

04 20 00 MASONRY

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 50 13 MISCELLANEOUS METAL FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 BITUMINOUS DAMPPROOFING

07 14 00 FLUID-APPLIED WATERPROOFING

07 22 00 UNDER DECK INSULATION

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL AND DOOR LOUVERS

DIVISION 09 - FINISHES

09 06 90 COLOR SCHEDULE

PROJECT TABLE OF CONTENTS Page 1

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 14 01 EXTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOILET ACCESSORIES

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

DIVISION 26 - ELECTRICAL

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

26 09 23.00 40 LIGHTING CONTROL DEVICES

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 16.00 40 PANELBOARDS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 52 00.00 40 EMERGENCY LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 TELECOMMUNICATIONS CABLING

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

PROJECT TABLE OF CONTENTS Page 2

32 92 19 SEEDING

32 93 00 EXTERIOR PLANTS

APPENDIX

APPENDIX 1 ENVIRONMENTAL REPORT

APPENDIX 2 EXISTING FACILITY PICTURES

APPENDIX 3 BASE STANDARDS

APPENDIX 4 HPSB CHECKLIST

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

SECTION 01 11 00

SUMMARY OF WORK

08/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E2114 (2008) Standard Terminology for Sustainability Relative to the Performance of Buildings

1.2 DEFINITIONS

Definitions pertaining to sustainable development are as defined in ASTM E2114, Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION, and as specified.

a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.

b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.

c. "Operational performance" is the functional behavior of the building as a whole or of the building components.

d. "Sustainability" is the balance of environmental, economic, and societal considerations.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Upon receipt of Government Furnished Equipment, the Contractor shall submit records in accordance with paragraph entitled, "Government Furnished Property," of this section.

Submit the following items to the Contracting Officer:

SECTION 01 11 00 Page 1

Construction Plan; G Construction Project Schedule; G Quality Control Plan; G Environmental Protection Plan; G Traffic Control Plan; G Safety Plan; G

1.4 WORK COVERED BY CONTRACT DOCUMENTS

1.4.1 Project Description

The work includes furnishing all labor, materials, supplies, equipment and services required to upgrade, and renovate the interior offices, restroom, maintenance bay, mechanical room, and exterior of facility 421.

1.4.2 Location

The work shall be located at Facility 421, POL Vehicle Maintenance, 4105 West Chocks Lane, Grissom ARB, IN.

1.5 CONTRACT DRAWINGS

The extent, location and general arrangement of the work to be accomplished is shown on the Contract Drawings and listed in these Technical Specifications.

The drawings referred to in the Contract Documents are the "plans", Plans or "drawings" are applicable to this Contract and are titled as follows:

PROJECT NO: CTGB 117016

PROJECT TITLE: RENOVATE B421

Contractor shall immediately check furnished drawings and notify the Government of any discrepancies.

1.6 WORK SCHEDULING

Contractor shall allow for a maximum of 5 calendar days where construction activity is prohibitive.

Normal duty hours for work shall be from 7:30 a.m. to 4:00 p.m., Monday through Friday, excluding federal holidays. Requests for additional work shall require written approval from the Contracting Officer 7 days in advance of the proposed work period.

1.7 PROJECT ENVIRONMENTAL GOALS

Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for construction is to produce a facility that meets the functional program needs and incorporates the principles of sustainability. Specifically:

a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.

SECTION 01 11 00 Page 2

b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.

c. Use environmentally preferable products and decrease toxicity level of materials used.

d. Use renewable energy and material resources.

e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.

Consider the durability, maintainability, and flexibility of building systems.

f. Reduce construction waste through reuse, recycling, and supplier take-back.

1.8 Safety

Comply with all Base Fire, Safety and Security Regulations. The equipment items furnished shall comply with all governing federal and state laws regarding safety, including all current requirements of the Occupational Safety and Health Act (OSHA) Contractor shall be solely responsible for job safety in accordance with all laws, regulations methods, etc. of Federal OSHA and State of Indiana. Maintain on site, a written health and safety plan identifying the project hazards and procedures.

1.9 OCCUPANCY OF PREMISES

Building 421 will not be occupied during the performance of work under this contract.

Before work is started, the Contractor shall arrange with the Contracting Officer a means of access, trailer location, parking, space for storage of materials and equipment, and use of base roads.

1.10 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

1.11 Progress Meetings

During construction activities the contractor shall hold weekly progress meetings. The intent of this meeting is to discuss safety, quality, and the project schedule. This meeting will be held at building 641 (Civil Engineering) and scheduled through the contracting officer. A conference call shall be setup by the contractor for off-site personnel to attend.

Meeting minutes shall be taken by the contractor and distributed at least 2

SECTION 01 11 00 Page 3 calendar days of after completion of the meeting.

1.12 Supervision

In accoradance with FAR 52.236-6, Superintendence by the Contractor, the Contractor shall have a site superintendent at the site at all times when there are workers on site or when deliveries are to be received. Under no circumstances shall a subcontractor be authorized to be site superintendent for the prime contractor. The Superintendent shall be designated as such to the Contracting Officer in writing with the signatures of the Contractor and the designated Superintendent. The contractor shall outline in the designation letter the extent of the superintendent's authority.

1.13 CLOSEOUT FORMS

Contractor to complete and submit AF Form 1354 as part of project closeout documents. A copy of the form may be obtained from Civil Engineering, Construction Management Office located at Building 641, Telephone 765-688-2604.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

3.1 Welding Permit

No welding will be permitted without obtaining a permit issued by the Base Fire Department, located at Building 474, Telephone 765-688-3353.

3.2 Contruction/Digging Permit

A properly approved and coordinated construction permit (AF Form 103), shall be obtained by the contractor prior to any excavation activities.

Contact information will be provided by the contracting officer after project award.

Mechanical digging more than four (4) inches below natural grade is prohibited without a current digging permit. The Contractor shall field mark areas where digging will take place and provide a scale drawing of the marked areas. A minimum of fifteen (15) working days is required to process digging permits. When the digging permit is issued existing underground utilities and structures within the marked areas will have to be marked. The Contractor is responsible to record and/or preserve these markings.The contractor is responsible for renewing digging when it expires.

3.2.1 Digging Around Utilities

Only nondestructive digging shall be done within ten (10) feet horizontally of cables, within ten (10)feet horizontally of natural gas lines, and within three (3) feet horizontally of other utilities. Nondestructive digging includes hand digging and hydro/vacuum excavation. Contractor shall verify actual utility locations and directions by hydro excavation equipment (such as vac-tron) prior to mechanical excavation.

3.2.2 Damage to Utilities

Damage done to utilities adequately marked by the Government shall be

SECTION 01 11 00 Page 4 repaired by the Contractor at no additional cost.

3.2.3 Unmarked Utilities

Utilities not marked by the Government and found by the Contractor shall be considered an unforeseen site condition, and the Contractor shall notify the Contracting Officer immediately.

3.3 Site Plan

Prior to starting the work, the contractor shall submit site plans to the contracting officer for approval showing the layout and details of all temporary facilities used for this contract. The base approval authority, normally the base civil engineer, must approve the plan. The plan shall include the location of the safety and/or construction fences, location of all site trailers, equipment and material storage areas, construction entrances, trash dumpsters, temporary sanitary facilities and worker parking areas. Site photographs prior to the start of work may be included with the plan. At completion of work, the contractor shall remove the faciltities and restore the site to its original condition.

3.4 Dirt and Dust Control Plan

As part of the Traffic Control Plan, the contractor shall submit truck and material haul routes for controlling dirt, debris, dust on base roadways.

As a minimum, the plans shall identify the subcontractor and equipment for cleaning along the haul route and measures to reduce dirt, dust, and debris from roadways.

3.5 WORKMANSHIP

Materials and equipment shall be installed in accordance with the approved recommendations of the manufacturer to conform with the Contract. The installation shall be accomplished in a skillful and workmanlike manner.

Adequate precautions shall be taken by the Contractor to protect Government property from damage resulting from work on the contract. Damage to Government property resulting from work on this contract shall be repaired by the Contractor to the satisfaction of the Contracting Officer and at no additional cost to the Government.

3.6 CODE COMPLIANCE

Work shall comply with applicable base, military, federal, state, and local Codes that are current per the date of contract. Comply with IBC 2012 as revised by UFC 1-200-01 General Building Requirements. (2013). Use ABA for handicap accessibility. Use UFC 3-600-01 for fire protection systems

3.7 CLEANUP

Remove debris and rubbish from project boundaries and disturbed areas.

Remove and transport in a manner that prevents spillage on streets or adjacent areas. Clean up dirt and debris that spills on to the street daily. Remove any material or debris that can be caught in the wind. Comply with local regulations regarding hauling an disposal. Submit weight tickets and recycling information at the end of the project.

-- End of Section --

SECTION 01 11 00 Page 5

SECTION 01 32 00

PROJECT SCHEDULE

PART 1 GENERAL

1.1 QUALIFICATIONS

The Contractor shall provide a project schedule per the specifications .

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Project Schedule: Gannt chart (Bar chart) electronic and hard copy; G

Contractor to provide electronic and hard copy. Contractor to provide schedule updates.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 GENERAL REQUIREMENTS

. Contractor management personnel shall actively participate in the project schedule development. Subcontractors and suppliers working on the project shall also contribute in developing and maintaining an accurate Project Schedule. Contractor to provide information to track work, lead times, and submittals.

3.2 COORDINATION

The Project Schedule shall be coordinated with the Progress Schedule.

Coordinate with the project's submittal register.

3.3 PROJECT SCHEDULE

3.3.1 Use of the Critical Path Method

The Critical Path Method (CPM) of network calculation shall be used to generate the Project Schedule. The Contractor shall provide the Project Schedule in the Precedence Diagram Method (PDM). PDM uses CPM data to grenerate a visual network diagram of a schedule. It shall show the time line in a type of Gannt chart. (a gannt chart is a progressive bar chart.)

Microspft project uses a Gannt chart system.

3.3.2 Level of Detail Required

The Project Schedule shall include an appropriate level of detail using the

SECTION 01 32 00 Page 1 following conditions to determine the appropriate level of detail to be used in the Project Schedule:

3.3.2.1 Activity Durations

Reasonable durations are those that allow the progress of activities to be accurately determined. (Usually less than 2 percent of all non-procurement activities' Original Durations are greater than 20 days).

3.3.2.2 Procurement Activities

Tasks related to the procurement of long lead materials or equipment shall be included as separate activities in the project schedule. Long lead materials and equipment are those materials that have a procurement cycle of over 40 days. Examples of procurement process activities include, but are not limited to: submittals, approvals, procurement, fabrication, and delivery.

3.3.2.3 Critical Activities

The following activities shall be listed as separate line activities on the Contractor's project schedule:

a. Submission and approval of mechanical/electrical layout drawings.

b. Submission and approval of O & M manuals.

c. Submission and approval of as-built drawings.

d. Submission and approval of 1354 data and installed equipment lists.

e. Submission and approval of testing and air balance (TAB).

f. Submission of TAB specialist design review report.

g. Submission and approval of fire protection specialist.

h. Submission and approval of testing and balancing of HVAC plus commissioning plans and data.

i. Air and water balance dates.

j. HVAC commissioning dates.

k. Controls testing plan.

l. Controls testing.

m. Performance Verification testing.

n. Other systems testing, if required.

o. Prefinal inspection.

p. Correction of punchlist from Prefinal inspection.

q. Final inspection.

r. Project Phases

s. Project Time of Occupancy; Nonoccupancy

t. LEED submission

3.3.2.4 Government Activities

Government and other agency activities that could impact progress shall be shown. These activities include, but are not limited to: approvals, inspections, and utility tie-ins.

3.3.2.5 Responsibility

All activities shall be identified in the project schedule by the party responsible to perform the work. Responsibility includes, but is not limited to, the subcontracting firm, contractor work force. Activities shall not belong to more than one responsible party.

SECTION 01 32 00 Page 2

3.3.2.6 Work Areas

All activities shall be identified in the project schedule by the work area in which the activity occurs. Activities shall not be allowed to cover more than one work area.

3.3.2.7 Modification or Claim Number

The modification or claim number of each activity shall be identified by the Mod or Claim Number. Whenever possible, changes shall be added to the schedule by adding new activities. Existing activities shall not normally be changed to reflect modifications.

3.3.2.8 Category of Work

All Activities shall be identified in the project schedule according to the category of work which best describes the activity. Category of work refers, but is not limited, to the procurement chain of activities including such items as submittals, approvals, procurement, fabrication, delivery, installation, start-up, and testing.

3.3.2.9 Feature of Work

All activities shall be identified in the project schedule according to the feature of work to which the activity belongs. Feature of work refers, but is not limited to, a work breakdown structure for the project.

3.3.3 Scheduled Project Completion

The schedule interval shall extend from NTP to the contract completion date.

3.3.3.1 Project Start Date

The schedule shall start no earlier than the date on which the NTP was acknowledged. The Contractor shall include as the first activity in the project schedule an activity called "Start Project". The "Start Project" activity shall have a constraint date equal to the date that the NTP was acknowledged, and a zero day duration.

3.3.3.2 Constraint of Last Activity

Completion of the last activity in the schedule shall be constrained by the contract completion date. The Contractor shall include as the last activity in the project schedule an activity called "End Project". The "End Project" activity shall have a constraint date equal to the completion date for the project, and a zero day duration.

3.4 PROJECT SCHEDULE SUBMISSIONS

The Contractor shall provide the submissions as described below. The data disk, reports, and network diagrams required for each submission are contained in paragraph SUBMISSION REQUIREMENTS.

3.4.1 Initial Project Schedule Submission

The Initial Project Schedule shall be submitted, with the progress schedule, for approval. The schedule shall provide a reasonable sequence of activities which represent work through the entire project and shall be at a reasonable level of detail.

SECTION 01 32 00 Page 3

3.4.2 Schedule Updates

Based on the result of progress meetings, specified in "Periodic Progress Meetings," the Contractor shall submit schedule updates every 30 days.

3.5 SUBMISSION REQUIREMENTS

3.5.1 Network Diagram

The network diagram shall be required on the schedule submission and on monthly schedule update submissions. The network diagram shall depict and display the order and interdependence of activities and the sequence in which the work is to be accomplished. Provide the following:

3.5.1.1 Continuous Flow

Diagrams shall show a continuous flow from left to right with no arrows from right to left. The activity number, description, and duration shall be shown on the diagram.

3.5.1.2 Project Milestone Dates

Dates shall be shown on the diagram for start of project, any contract required interim completion dates, and contract completion dates. Include a projected date for shut down or interruptions in Government services.

3.5.1.3 Critical Path

The critical path shall be clearly shown. The chart shall be easily read without a magnifing glass.

-- End of Section --

SECTION 01 32 00 Page 4

SECTION 01 33 00

SUBMITTAL PROCEDURES

05/11

PART 1 GENERAL

1.1 DEFINITIONS

1.1.1 Submittal Descriptions (SD)

Submittals requirements are specified in the technical sections.

Submittals are identified by Submittal Description (SD) numbers and titles as follows:

SD-01 Preconstruction Submittals

Submittals which are required prior to

List of proposed products

Construction progress schedule

Submittal register

Health and safety plan

Work plan

Quality Control(QC) plan

Environmental protection plan

SD-02 Shop Drawings

Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.

Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.

Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.

SD-03 Product Data

Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.

SECTION 01 33 00 Page 1

Samples of warranty language when the contract requires extended product warranties.

SD-04 Samples

Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.

Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.

Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.

SD-05 Design Data

Design calculations, mix designs, analyses or other data pertaining to a part of work.

SD-06 Test Reports

Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. (Testing must have been within three years of date of contract award for the project.)

Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.

Report which includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.

Investigation reports.

Daily logs and checklists.

Final acceptance test and operational test procedure.

SD-07 Certificates

Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that product, system or material meets specification requirements. Must be dated after award of project contract and clearly name the project.

Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor, the purpose of which is to further quality of orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel qualifications.

SECTION 01 33 00 Page 2

Text of posted operating instructions.

SD-08 Manufacturer's Instructions

Preprinted material describing installation of a product, system or material, including special notices and (MSDS)concerning impedances, hazards and safety precautions.

SD-09 Manufacturer's Field Reports

Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and must state the test results; and indicate whether the material, product, or system has passed or failed the test.

Factory test reports.

SD-10 Operation and Maintenance Data

Data that is furnished by the manufacturer, or the system provider, to the equipment operating and maintenance personnel, including manufacturer's help and product line documentation necessary to maintain and install equipment. This data is needed by operating and maintenance personnel for the safe and efficient operation, maintenance and repair of the item.

This data is intended to be incorporated in an operations and maintenance manual or control system.

SD-11 Closeout Submittals

Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.

Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.

Interim "DD Form 1354" with cost breakout for all assets 30 days prior to facility turnover.

1.1.2 Work

As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

SECTION 01 33 00 Page 3 submittals not having a "G" designation are for Contractor QC approval.

Submit the following in accordance with this section.

SD-01 Preconstruction Submittals

Submittal Register; G

1.3 SUBMITTAL CLASSIFICATION

Submittals are classified as follows:

1.4 PREPARATION

1.4.1 Transmittal Form submit all submittals on a AF 3000 form.

1.5 SUBMITTAL REGISTER

Prepare and maintain submittal register, as the work progresses.1.6

GOVERNMENT APPROVING AUTHORITY

When approving authority is Contracting Officer, the Government will:

a. Note date on which submittal was received.

b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.

c. Identify returned submittals with one of the actions defined in paragraph entitled, "Review Notations," of this section and with markings appropriate for action indicated.

Upon completion of review of submittals requiring Government approval, stamp and date approved submittals. Two copies of the approved submittal will be retained by the Contracting Officer and one copy of the submittal will be returned to the Contractor.

1.7 DISAPPROVED SUBMITTALS

Contractor shall make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the clause entitled, "Changes," is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work.

Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.

If changes are necessary to submittals, the Contractor shall make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.

1.8 APPROVED SUBMITTALS

The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that

Approval or acceptance will not relieve the Contractor of the

SECTION 01 33 00 Page 4 responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for.

After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

1.9 APPROVED SAMPLES

Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.

Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.

Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.

Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals.

Contractor to replace such materials or equipment to meet contract requirements.

Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 33 00 Page 5

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 24 PAGES

01 32 00 SD-01 Preconstruction Submittals

3.3.1 GProject Schedule:

01 33 00 SD-01 Preconstruction Submittals

1.5 GSubmittal Register

01 33 29 SD-11 Closeout Submittals

1.5.1.1 GFinal High Performance and

Sustainable Building Checklist 01 35 50 SD-01 Preconstruction Submittals

1.8 GEnvironmental Protection Plan

SD-11 Closeout Submittals

3.6.1Hazardous Material Safety Data Sheets (MSDS)

3.6.2Hazardous Material(HAZMAT)Usage Report

01 45 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

1.2 GWork Plan

SD-11 Closeout Submittals

3.8 GAs-builts

01 57 20 SD-01 Preconstruction Submittals

1.4 GWaste Management Plan

SD-11 Closeout Submittals 1.5.1Weight/Volume Receipts 1.5.2C&D Debris Waste Management

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 24 PAGES

01 78 00 SD-03 Product Data 1.3.2As-Built Record of Equipment and Materials 1.5.1Warranty Management Plan

Warranty Tags 1.8Final Cleaning

Spare Parts Data SD-08 Manufacturer’s Instructions

1.4Preventative Maintenance 1.4Condition Monitoring (Predictive

Testing) 1.4Inspection 1.5.1Instructions

SD-10 Operation and Maintenance Data

1.7Operation and Maintenance Manuals

SD-11 Closeout Submittals 1.3.1Record Drawings

1.9 GInterim Form DD1354

1.9 GChecklist for Form DD1354

02 41 00 SD-01 Preconstruction Submittals

1.9 GExisting Conditions

1.2.1 GDemolition Plan;

03 15 00.00 10 SD-03 Product Data 2.2Preformed Expansion Joint Filler

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 24 PAGES

03 15 00.00 10 2.3Sealant Waterstops

03 20 00.00 10 SD-03 Product Data

2.1 GReinforcing Steel

SD-06 Test Reports GTests, Inspections, and

Verifications 03 30 00.00 10 SD-01 Preconstruction Submittals

1.4.2 GQuality Control Plan

GUnderslab Shop Drawing GPre-Pour Checklist

SD-03 Product Data CRecycled Content Products

2.11 GVapor Barrier

2.9 GFloor Hardener

SD-05 Design Data

2.1.1 GMixture Proportions

SD-06 Test Reports

2.1.1 GMixture Proportions

3.9 GTesting and Inspection for CQC

3.9.5.6Compressive Strength

04 20 00 SD-02 Shop Drawings

1.4.5 GDetail Drawings

SD-03 Product Data

2.2 GClay or Shale Brick

2.7.2 GCement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 24 PAGES

04 20 00 2.13 GInsulation

1.6.2 GCold Weather Installation

GWater-Repellant Admixture SD-04 Samples

2.4 GConcrete Masonry Units (CMU)

2.2 GClay or Shale Brick

2.9 GAnchors, Ties, and Bar

Positioners

2.14 GExpansion-Joint Materials

1.4.3 GPortable Panel

SD-06 Test Reports

3.25.3 GEfflorescence Test

3.25.1 GField Testing of Mortar

3.25.2 GField Testing of Grout

GPrism tests

2.7.2 GMasonry Cement

GFire-rated CMU

1.4.4 GMasonry Inspector Qualifications

05 12 00 SD-01 Preconstruction Submittals

1.4.1.1 GErection Drawings

SD-02 Shop Drawings

1.4.2 GFabrication drawings

SD-07 Certificates 2.2Steel 2.3Bolts, nuts, and washers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 24 PAGES

05 12 00 1.3AISC Fabrication Plant Quality Certification

1.4.3.1Welding procedures and qualifications

05 50 13 SD-02 Shop Drawings

2.10 Gstructural steel door frames

2.9 Gangles and plates

SD-03 Product Data 2.6Cover plates and frames 2.10Structural steel door frames 2.11Windowand door guards

07 14 00 SD-03 Product Data

2.2 GFluid-applied membrane

SD-11 Closeout Submittals

1.5 GWarranty

3.6 GInformation Card

07 22 00 SD-03 Product Data Manufacturer's data sheets on each product to be used

G1. Preparation instructions and recommendations

G2. Storage and handling requirements and recommendations

G3. Installation instructions.

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 24 PAGES

07 22 00 For each finish product specified, two samples, minimum size 6 inches square or long, representing actual products required for this project.

07 60 00 SD-02 Shop Drawings

3.1.17 GGutters

3.1.18 GDownspouts

3.1.27 GFlashing at roof penetrations

3.1.24 GEave flashing

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

07 92 00 SD-03 Product Data

2.1 GSealants

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.5 Gframes

SD-03 Product Data

2.1 GDoors

SD-04 Samples GFactory-applied enamel finish

08 51 13 SD-02 Shop Drawings

2.1 GWindows

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 24 PAGES

08 51 13 2.1 GWindows 1.10.5Thermal performance

SD-04 Samples 1.4.2.1Finish Sample

Window Sample SD-06 Test Reports

1.4.4Minimum condensation resistance factor

SD-10 Operation and Maintenance Data

2.1 GWindows

Plastic Identification

08 71 00 SD-02 Shop Drawings

1.3 GHardware schedule

2.3 GHardware items

SD-10 Operation and Maintenance Data

1.3Hardware Schedule SD-11 Closeout Submittals Key Certificate

08 81 00 SD-02 Shop Drawings 3.3.1Installation

SD-03 Product Data 1.7.1Insulating Glass

SD-07 Certificates 1.7.1Insulating Glass

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 24 PAGES

08 81 00 Plastic Glazing 1.3Glazing Accessories

SD-08 Manufacturer’s Instructions 2.3Setting and sealing materials 3.2Glass setting

SD-11 Closeout Submittals 1.6.1Local/Regional Materials

08 91 00 SD-02 Shop Drawings 1.5Wall louvers

SD-03 Product Data 2.2Metal Wall Louvers

SD-04 Samples

1.5 GCOLOR SAMPLES

09 06 90 SD-04 Samples

2.2 GColor Schedule

09 29 00 SD-03 Product Data 2.1.1Gypsum Board 2.1.6Adhesives 2.1.4Joint Treatment Materials

SD-07 Certificates 2.1Asbestos Free Materials

SD-08 Manufacturer’s Instructions 2.1Material Safety Data Sheets

09 51 00 SD-03 Product Data GAcoustical Ceiling Systems

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 24 PAGES

09 51 00 2.1.1 GAcoustic Ceiling Tiles 09 68 00 SD-03 Product Data

2.1 GCarpet

2.4 GMoldings

Physical Characteristics 1.2.1Local/Regional Materials

SD-04 Samples

2.1 GCarpet

SD-08 Manufacturer’s Instructions 3.1Surface Preparation 3.3Installation

SD-11 Closeout Submittals LEED Documentation

1.2.1Local/Regional Materials 09 90 00 SD-02 Shop Drawings

3.12Piping identification 3.12stencil

SD-03 Product Data Certification Environmental Data

2.1Materials

2.1 GCoating

2.1Manufacturer's Technical Data

Sheets 3.3.5Sealant

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 24 PAGES

09 90 00 1.9 GColor SD-08 Manufacturer’s Instructions

3.4.1Application instructions 3.8.2Mixing 1.6.2Manufacturer's Material Safety

Data Sheets 10 14 00.20 SD-02 Shop Drawings

GDetail Drawings SD-03 Product Data

GSchedule SD-04 Samples

GInterior Signage Three color samples of each of the sign types showing typical quality.

SD-11 Closeout Submittals LEED Documentation

10 14 01 SD-02 Shop Drawings

3.1 GApproved Detail Drawings

SD-03 Product Data Signage Manufacturer's desctiptive data adn cataglog cuts.

SD-04 Samples

1.2 GExterior Signage

10 21 13 SD-02 Shop Drawings

3.3 GInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 24 PAGES

10 21 13 SD-03 Product Data GToilet Partition System

SD-04 Samples

2.6 GColors and Finishes

10 26 13 SD-02 Shop Drawings GCorner

10 28 13 SD-03 Product Data

2.2 GAccessory Items

12 21 00 SD-03 Product Data

2.1 GWindow Blinds

SD-04 Samples

2.1 GWindow Blinds

21 13 13.00 20 SD-02 Shop Drawings GShop Drawings

HVAC duct layout SD-03 Product Data

GMaterials and Equipment SD-05 Design Data

1.3 GHydraulic Calculations

GHVAC/ Comm coordination letter

G, Submit submit letter indicating hvac ducting and comm has been coordinated. Reference ducting sheet provided with the design proposal

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 24 PAGES

21 13 13.00 20 3.6 GRequest to schedule Preliminary Tests

3.6 GPreliminary Test Report

3.7 Grequest to schedule Final

Acceptance Test 3.7Final Acceptance Test Report

SD-07 Certificates

3.1 GInspection by Fire Protection

Engineer

1.5.1 GFire Protection Engineer

1.5.2 GSprinkler System Installer

SD-10 Operation and Maintenance Data

3.8Operating and Maintenance Instructions

SD-11 Closeout Submittals 3.7As-built drawings 3.8On-site training

22 00 00 SD-03 Product Data 2.4Fixtures

2.4.3 GFlush valve water closets

2.4.4 GFlush valve urinals

2.4.9 GWall hung lavatories

2.4.10 GCountertop lavatories

2.4.11Kitchen sinks

2.4.12 GService sinks

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 24 PAGES

22 00 00 2.4.13 GDrinking-water coolers

2.10 GWater heaters

2.12 GPumps

3.9.1.1 GBackflow prevention assemblies

2.6.2 GShower Faucets

3.4 GVibration-Absorbing Features

3.9.1Plumbing System

SD-06 Test Reports 3.9Tests, Flushing and Disinfection

3.9.1.1 GTest of Backflow Prevention

Assemblies SD-07 Certificates

1.3Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

3.9.1 GPlumbing System

23 00 00 SD-02 Shop Drawings

1.4.5 GDetail Drawings

SD-03 Product Data

2.1Standard Products 2.9.1.1Metallic Flexible Duct 2.9.1.2Insulated Nonmetallic Flexible

Duct Runouts 2.9.1.2Duct Connectors 2.9.2.1Duct Access Doors

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 24 PAGES

23 00 00 2.9.2.2Fire Dampers 2.9.2.3Manual Balancing Dampers 2.9.2.4Automatic Smoke-Fire Dampers

Automatic Smoke Dampers 2.9.5Sound Attenuation Equipment 2.9.5Acoustical Duct Liner

2.9.6.1 GDiffusers

2.9.6.2 GRegisters and Grilles

2.9.7 GLouvers

2.9.8Air Vents, Penthouses, and

Goosenecks

2.10.1.1 GCentrifugal Fans

2.10.1.2In-Line Centrifugal Fans 2.10.1.3Axial Flow Fans 2.10.1.4Panel Type Power Wall

Ventilators Centrifugal Type Power Wall Ventilators

Centrifugal Type Power Roof Ventilators

Propeller Type Power Roof Ventilators

Air-Curtain Fans

2.10.1.6 GCeiling Exhaust Fans

GAir Handling Units GFan-Coil Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 24 PAGES

23 00 00 Coil Induction Units Constant Volume, Single Duct Terminal Units

Variable Volume, Single Duct Terminal Units

Variable Volume, Single Duct, Fan-Powered Terminal Units

Dual Duct Terminal Units Ceiling Induction Terminal Units Reheat Units Unit Ventilators

2.12 GEnergy Recovery Devices

1.2.1Diagrams

3.15 GOperation and Maintenance

Training SD-06 Test Reports

3.13 GPerformance Tests

3.15 GPerformance Tests

GDALT and TAB Work Execution Schedule

GDALT and TAB Procedures Summary

GDesign review report GPre-Final DALT report GFinal DALT report GTAB report for Season 1

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 24 PAGES

23 00 00 GTAB report for Season 2 GCommissioning Report

SD-07 Certificates GIndependent TAB agency and personnel qualifications GAdvance notice of Pre-Final

DALT field work GCommissioning Firm GCommissioning Specialist

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions

3.15 GOperation and Maintenance

Training SD-10 Operation and Maintenance Data

3.15Operation and Maintenance Manuals

2.9.2.2 GFire Dampers

2.9.2.3 GManual Balancing Dampers

2.9.2.4Automatic Smoke-Fire Dampers

Automatic Smoke Dampers

2.10.1.1 GCentrifugal Fans

2.10.1.2In-Line Centrifugal Fans

2.10.1.3 GAxial Flow Fans

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

This is the start of the file's text. The full file is on GovTribe.