Solicitation Amendment FA462626R00020002 SF 30.pdf
PDF 1 MB Posted
- Attached to
- Repair MAF Roofs Federal contract opportunity
- Solicitation number
- FA462626R0002
About this file
This is Amendment 0002 to Solicitation FA462626R0002, issued by FA4626 341 CONS LGC at Malmstrom Air Force Base, Montana, effective January 15, 2026. The amendment modifies six line items (0001-0006) for roof repair work at a DoDAAC facility (F2W3D3), extending the period of performance from 126 calendar days to 168 calendar days from the date of Notice to Proceed for all line items. The place of performance remains the same for all items.
The amendment incorporates five substantive changes: revised Specifications (updated January 23, 2026) based on Requests for Information responses; revised Section L and M contract terms (updated January 23, 2026) based on RFI responses; new soffit repair drawings for MAF roofs; RFI Q&A documentation (updated January 23, 2026); and updated Wage Determinations (effective January 2, 2026). The complete list of attachments includes Specifications, Submittal Schedule, Schedule of Drawings, Drawings, Wage Determinations (three documents), revised Sections L and M, Past Performance Reference Sheet, CEAL, MAF Roof Pictures, Repair MAF Roof Soffit drawings, and MAF Roofs Q&A. Offerors must acknowledge receipt of this amendment prior to the solicitation deadline using one of three methods: completing items 8 and 15 and returning copies, acknowledging receipt on each offer copy, or submitting separate written communication referencing the solicitation and amendment numbers. The Contracting Officer is Cody Babinecz.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this amendment is to: Block 14 (Description of Amendment/Modification):
1. Provide a revision to Attachment 1_Specifications (23Jan26) based on Requests for Information (RFI) responses.
2. Provide a revision to Attachment 6_Sections L and M (23Jan26) based on RFI responses.
3. Add soffit drawings via Attachment 10_Repair MAF Roofs Soffit.
4. Add RFI responses via Attachment 11_MAF Roof Q&A (23Jan26).
5. Increase the Period of Performance by 42 calendar days, from 126 calendar days to 168 calendar days.
Section F - Deliveries or Performance
Line Item 0001
The following Delivery Information modifications were made:
Place of Performance - DoDAAC: F2W3D3
Information From To
Delivery 126 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance
168 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance
Line Item 0002
The following Delivery Information modifications were made:
Place of Performance - DoDAAC: F2W3D3
Information From To
Delivery 126 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance
168 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance
Line Item 0003
The following Delivery Information modifications were made:
Place of Performance - DoDAAC: F2W3D3
Information From To
Delivery 126 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance
168 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance
Line Item 0004
The following Delivery Information modifications were made:
Place of Performance - DoDAAC: F2W3D3
Information From To
Delivery 126 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance
168 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance
Line Item 0005
The following Delivery Information modifications were made:
Place of Performance - DoDAAC: F2W3D3
Information From To
Delivery 126 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance
168 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance
Line Item 0006
The following Delivery Information modifications were made:
Place of Performance - DoDAAC: F2W3D3
Information From To
Delivery 126 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance
168 Calendar Days, From Date of Notice to Proceed Receipt to completion of performance
Section J - List of Attachments
Header Miscellaneous Text (Modified):
FA462626R00020002
Attachments:
1. Specifications (Updated 23Jan26)
2. Submittal Schedule
3. Schedule of Drawings
4. Drawings
5. Wage Determinations (x3) (Updated 2Jan26)
6. Section L & M - Revised (Updated 23Jan26)
7. Past Performance Reference Sheet
8. CEAL
9. MAF Roof Pictures
10. Repair MAF Roof Soffit (Updated 23Jan26)
11. MAF Roofs Q&A (Updated 23Jan26)
FA462626R00020002
| SUMMARY OF CHANGES |
| Deliveries or Performance |
| List of Attachments |
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0002 |
| EffDate: 15 Jan 2026 |
| ReqNo: |
| ProjNo: NZAS 25-6002 |
| IssCode: FA4626 |
| AdmCode: |
| IssuedBy: FA4626 341 CONS LGC |
7015 GODDARD DR, BLDG 145 CP 406 731 3744
MALMSTROM AFB, MT 59402-6863
UNITED STATES
Branden Lawson, Email: branden.lawson@us.af.mil Telephone: 4067314353 Cody Babinecz, Email: cody.babinecz@us.af.mil Telephone: 632-4608 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA462626R0002 |
| SolDate: 17 Dec 2025 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: CODY BABINECZ |
| ContDate: |
| CODate: 23 Jan 2026 |
File details come from the government source that posted it. Updated .