9_Matador Manor Streetlights QA.pdf

PDF 88 KB Posted

Attached to
Matador Manor Streetlights
Solicitation number
FA4626-26-R-0001
Issued by

About this file

This document is a Questions and Answers (Q&A) addendum for Solicitation FA4626-26-R-0001, a streetlight project called Matador Manor Streetlights. The Q&A provides two specific technical clarifications: 1) Pull boxes should be installed with a reinforced concrete lid, resolving a discrepancy between drawing Detail 3 and Specification section 26 05 43 2.2 D 1, which previously conflicted between concrete and steel covers, and 2) Ground rods should be installed as 5/8-inch x 8-foot, reconciling a difference between Drawing Detail 1 and Specification section 26 05 26 2.2 D 1, which originally specified different ground rod sizes and materials. Both clarifications reference an Attachment 1 - Revised document for additional details.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

# Amend #

Please provide clarification regarding the pull boxes. Drawing Detail 3 calls out for “Reinforced Concrete Lid”; however, Spec section 26 05 43 2.2 D 1 calls out for “steel cover”.

Install pull box with reinforce "concrete" lid. (see Attachment 1 - Revised)

Please provide clarification regarding the ground rod size. Drawing Detail 1 calls out for “5/8” x 8’ CU Clad ground rod”; however, Spec section 26 05 26 2.2 D 1 calls out for “Copper Clad steel, 3/4” x 10””. Install 5/8-in x "8-ft" ground rod. (see Attachment 1 - Revised) 2