1_Specs Combined.pdf

PDF 973 KB Posted

Attached to
Matador Manor Streetlights
Solicitation number
FA4626-26-R-0001
Issued by

About this file

These are the specifications for the Matador Manor Streetlights project (Solicitation FA4626-26-R-0001) involving comprehensive streetlight infrastructure replacement at Malmstrom Air Force Base in Montana. The project scope includes removing and replacing all existing street lights, poles, and concrete bases, and installing new electrical circuits, conduits, conductors, disconnects, and transformer connections using directional drilling techniques. Key technical specifications detail requirements for electrical components, including LED luminaires (Holophane Phillips Lumec RVS-135W80-LE4K), aluminum poles with dark bronze finish, multi-voltage ballasts, and compliance with electrical and safety standards.

The project is classified under NAICS code 237130 with a small business size standard of $45,000,000, and is estimated to be valued between $500,000 and $1,000,000. A mandatory site visit is scheduled for 08 January 2026 at 1:00 pm MST in the 341st Contracting Squadron Auditorium, with interested parties required to have federal installation access. The solicitation is issued by the Department of the Air Force Global Strike Command, and funds are currently available. Contractors must submit a Contractor Entry Authorization List by 30 December 2025 to participate in the site visit and potential bidding process.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1 FA4626-26-R-0001

Repair Street Lights, Matador Manor Project Number NZAS 22-0010

SPECIFICATIONS INDEX Page 1

INDEX OF CONSTRUCTION SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

01 00 00 – GENERAL REQUIREMENTS

01 10 00 – SECURITY

01 36 00 – ENVIRONMENTAL PROTECTION

DIVISION 2 – EXISTING CONDITIONS

NOT USED

DIVISION 3 – CONCRETE

03 30 00-CAST IN PLACE CONCRETE

DIVISION 4 – MASONRY

NOT USED

DIVISION 5 - METALS

NOT USED

DIVISION 6 – WOOD & PLASTICS

NOT USED

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

NOT USED

DIVISION 8 – DOORS & WINDOWS

NOT USED

DIVISION 9 – FINISHES

NOT USED

DIVISION 10 – SPECIALTIES

NOT USED

DIVISION 11 – EQUIPMENT

NOT USED

DIVISION 12 – FURNISHINGS

NOT USED

DIVISION 13 – SPECIAL CONSTRUCTION

NOT USED

DIVISION 14 – CONVEYING SYSTEMS

NOT USED

DIVISION 15 THRU DIVISION 20 – RESERVED

NOT USED

DIVISION 21 – FIRE SUPPRESSION

NOT USED

DIVISION 22 - PLUMBING

NOT USED

DIVISION 23 – HEATING, VENTILATING & AIR CONDITIONING

SPECIFICATIONS INDEX Page 2

DIVISION 26 – ELECTRICAL

26 00 00 – GENERAL PROVISIONS FOR ELECTRICAL WORK

26 05 19 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 33 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 05 43 - UNDERGROUND RACEWAYS FOR ELECTRICAL SYSTEMS

26 05 53 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 28 16 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS

26 56 00 - EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

NOT USED

DIVISION 28 – ELECTRONIC SAFETY & SECURITY

NOT USED

DIVISION 31 – EARTHWORK

31 20 00 – EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 92 12 - SEEDING AND SODDING

DIVISION 33 – UTILITIES

33 05 23 - HORIZONTAL DIRECTIONAL DRILLING

DIVISION 34 – TRANSPORTATION

NOT USED

DIVISION 35 – WATERWAY & MARINE

NOT USED

DIVISION 41 – MATERIAL PROCESSING & HANDLING EQUIPMENT

NOT USED

DIVISION 44 – POLLUTION & WASTE CONTROL EQUIPMENT

NOT USED

DIVISION 46 – WATER & WASTEWATER EQUIPMENT

- END -

GENERAL REQUIREMENTS 01 00 00 - 1

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY OF WORK

Project titled: “Repair Street Lights, Matador Manor, Project Number NZAS 22-0010, consists of removal and replacement of all street lights, poles, and concrete bases in Matador Manor. The work shall also include new circuits, conduits, conductors, disconnects on pedestals, and connections to existing transformers. Conduits shall be installed by directional drilling.

1.2 UTILITIES:

All reasonable quantities of utilities will be made available from existing utilities to the Contractor without charge. Any temporary connection or lines that may be required will be installed, maintained, and removed by the Contractor at his own expense and in such a manner satisfactory to the Contracting Officer. Removal of such connections or lines will be accomplished prior to final acceptance of the construction. The Contractor shall provide any necessary portable power.

1.3 OMISSIONS OF INDUSTRY STANDARDS:

Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed work.

1.4 SAFETY:

The Contractor shall comply with all existing Occupational Safety and Health Act (OSHA) standards of safety at all times in the performance of this contract. Hazards to the safe use of the premises due to the Contractor’s work and/or equipment shall be suitably marked at all times.

Pedestrian and vehicle traffic ways shall be kept clear and unobstructed.

PART 2 - PRODUCTS

Not applicable.

PART 3 - EXECUTION

3.1 INSPECTION:

There will be one primary inspector assigned to inspect for compliance. An alternate inspector will also be assigned and will perform all inspection duties in the absence of the primary inspector. The inspector will be the spokesman for compliance with the specifications and drawings. Controversies between the inspector and the Contractor will be resolved by the Contracting Officer. If, for some

GENERAL REQUIREMENTS 01 00 00 - 2

reason, a change in the primary or alternate inspector is required, the Contractor will be notified.

The Contractor shall coordinate Contractor activities with the Contracting Officers representative.

3.2 CONTRACTOR VEHICLES AND EQUIPMENT:

3.2.1. The Contractor shall provide all vehicles and equipment necessary to accomplish the contract work. Power equipment shall be equipped with safety and noise limiting devices. The equipment shall be in a safe and efficient operating condition. The Contractor shall not park vehicles in the project area during non working hours. A designated parking area for vehicles and equipment will be provided. Vehicles will not be allowed on lawns or sidewalks without prior written approval. All equipment will be clearly marked with the Company name.

3.2.2. Truckload Limits: The following load limits shall apply to all contractor-operated equipment on this project:

April 1 to June 1 -- 350 #/inch width of tire All Other Times -- 400 #/inch width of tire

3.3 CONTINUED USE OF FACILITIES:

Building, structures, facilities, and utilities will continue in use by the Government during this contract. The Contractor shall notify Construction Management when a no-work condition will occur for more than one day by the Contractor or sub-contractors (except weekends and federal holidays) 5 working days prior to the event.

3.4 MAINTENANCE OF AIR FORCE OPERATIONS

It is required and essential that the primary use of the facilities continue uninterrupted throughout the contract period. Work, once commenced, shall be carried to completion with a minimum of interruption to Government operations.

3.5 AS-BUILT FIELD DATA

3.5.1. General: The Contractor shall keep at the construction site a complete set of full size prints of the contract drawings, reproduced at Contractor expense. All costs incurred by the Contractor in the preparation and furnishing of As-Builts shall be included in the contract price and no separate payment will be made for this work. Approval and acceptance of the final As-Built record drawings shall be accomplished before final payment is made to the Contractor. During construction, these prints shall be marked to show all deviations in actual construction from the contract drawings. The color red shall be used to indicate all additions and green to indicate all deletions. The drawings shall show the following information but not be limited thereto:

3.5.1.1. The locations and descriptions of any utility line and other installations of any kind or description known to exist within the construction area. The location includes dimensions to permanent features, and depth.

GENERAL REQUIREMENTS 01 00 00 - 3

3.5.1.2. The locations and dimension of any changes within the building or structure, and the accurate location and dimension of all underground utilities and facilities.

3.5.1.3. Correct grade or alignment of roads, structures, and utilities if any changes were made from contract plans.

3.5.1.4. Correct elevations if changes were made in site grading from the contract plans.

3.5.1.5. Changes in details design or additional information obtained from working drawings specified to be prepared and/or furnished by the Contractor including, but not limited to, fabrication, erection, installation, and placing details, pipe size, pipe material, insulation material, dimensions of equipment foundations, etc.

3.5.1.6. The topography and grades of all drainage installed or affected as part of the project construction.

3.5.1.7. All changes or modifications from the original design and from the final inspection.

3.5.1.8. Where contract drawings or specifications allow options, only the option actually used in the construction shall be shown on the as-built drawings. The option not used shall be deleted.

3.5.1.9. These deviations shall be shown in the same general detail utilized in the contract drawings.

Marking of the prints shall be pursued continuously during construction to keep them up-to-date.

In addition, the Contractor shall maintain full size mark-up drawings, survey notes, sketches, nameplate data, pricing information, description, and serial numbers of all installed equipment. This information shall be maintained in a current condition at all times until completion of the work.

The resulting field-marked prints and data shall be referred to and marked as “As-Built Field Data,” and shall be used for no other purpose. They shall be made available for inspection by the Contracting Officer’s representative whenever requested during construction and shall be jointly inspected for accuracy and completeness by the Contracting Officer’s representative and a responsible representative of the Contractor prior to submission of each pay estimate. If the As- Built Field Data is not accurate and complete, a percentage of the pay request will be withheld from the payment and any future payments until the As-Built Field Data is up to date, complete and accurate. The Contracting Officer will determine the percentage to be retained.

3.5.2. Submittal of the As-Built Field Data: The As-Built Field Data shall reflect the exact installation performed and two copies shall be submitted to the Contracting Officer for review and approval a minimum of three calendar days prior to the date of final inspection. If review of the preliminary as-built drawings reveals errors and/or omissions, the drawings will be returned to the Contractor for corrections. The Contractor shall make all corrections and return the drawings to the Contracting Officer within 10 calendar days of receipt. The “Red LINE” drawings shall be reviewed at the final inspection for completeness. Once As-Built Field Data has been reviewed and approved, one copy will be returned to the contractor with an electronic copy of contract drawings.

The electronic contract drawings will be updated with the field data by the contractor and resubmitted to the Contracting Officer for permanent record.

3.5.3. Preparation--As-Built Contract Drawings:

GENERAL REQUIREMENTS 01 00 00 - 4

3.5.3.1. Approved preliminary as-built drawings, which were kept on-site during construction, and marked with all changes, will be returned to the Contractor along with AutoCAD Compact Disk (CD). All work on the CD will be accomplished by a Certified Engineering Technician and/or individuals with a minimum of five years drafting experience, at least three of which must be using AutoCAD. The name of the individual shall be submitted in writing to the Contracting Officer.

3.5.3.2. Modifications to the CD shall be accomplished on the appropriate layer showing the work being changed. All revisions shall be done in the same format as the original drawing. On each sheet the words “AS BUILT” in block letters will be added to the CD. The size of the letters will be at least 3/8 inch high and be placed either above the title block or to the left of the title block. Fill in the revisions block with “REVISED AS-BUILT”, date and initials. The submittal shall include the revised AutoCAD CD, the approved “Red Line” drawings and two full size final As-Built plots of the drawing set.

3.5.4 List of Equipment-In-Place:

3.5.4.1. In addition to the above requirements, the Contractor shall submit for approval, at the completion of construction, a list of equipment-in-place. This list shall be updated and kept current throughout construction, and shall be jointly inspected for accuracy and completeness by the Contracting Officer’s representative and a responsible representative of the contractor prior to submission of each monthly pay estimate. A sample form showing minimum data required is provided at the end of this section.

3.6 CONCEALED WORK

All items of work to be concealed shall be Government inspected prior to concealment.

3.7 OPERATING AND MAINTENANCE INSTRUCTIONS:

One complete sets of instructions, each in post-form binders, containing the manufacturer’s operating and maintenance instructions for all equipment shall be furnished to the Contracting Officer with two electronic copies on CD’s. Where information or instructions are included for more than one model, the Contractor shall clearly mark the model actually installed on the job. The manuals shall be sectionalized using dividers with labeled tabs identifying the product/item behind the dividers. One complete set shall be furnished at the time test procedures are submitted, and the remaining sets shall be furnished before the contract is completed. Furnishing operating and maintenance instructions does not relieve the Contractor of the responsibility of furnishing framed instructions and schematics where specified. Each binder shall be indelibly marked on the exterior front and edge with the project name, project number, contract number, name of contractor and the date.

3.8 CONTRACTOR FURNISHED EQUIPMENT DATA:

Ten days prior to final inspection and acceptance of work, the Contractor shall submit the following data:

GENERAL REQUIREMENTS 01 00 00 - 5

3.8.1. Equipment List: An itemized equipment list showing unit retail value and nameplate data including serial number, model number, size, manufacturer, etc., for all Contractor furnished electrical and mechanical equipment installed under this contract.

3.8.2. Guarantees: Provide a list of all equipment items which are specified to be guaranteed, accomplished by a copy of each specified guarantee therefore. For each specific guaranteed item on the list shall include the name, address, and telephone numbers of the subcontractor who installed the item, the supplier, or distributor and the manufacturer. The completion data of the guarantee period shall correspond to the applicable specification requirements for each guarantee item.

3.9 MODEL UNITS:

N/A

3.10 SHOP DRAWINGS:

Shop drawings will include specially prepared technical data for this project and will consist of drawings, diagrams, performance curves, schedules, calculations, measurements, and will expand the general application to this specific project. Shop drawings show complete and accurate descriptions of specific equipment or systems to be installed. This will include detailed drawings showing routings, material types, installation and anchoring methods, component sizes, mounting methods, spacing, interface with existing systems, wiring and electrical systems, and all other details associated with the installation.

3.11 START OF WORK NOTIFICATION:

The Contractor shall notify the Construction Management (CM) Office and the Contracting Officer at least five work days in advance of the start of all work. This shall include, but is not limited to, notifying CM when the initial work shall begin; notifying CM when work shall resume after a work stoppage of more than three work days; notifying CM when work shall begin following the end of all specified exclusion periods. The Contractor shall be aware that the Notice to Proceed is not sufficient notification to CM when initial work will begin.

3.12 NOTICE OF FINAL INSPECTION:

The Contractor shall, after notifying the Project Inspector, schedule a date with the Contracting Officer for final inspection 14 days prior to his projected completion of the project. A final inspection shall not be held until all discrepancies found during the pre-final inspections have been corrected. The red line drawings shall be at the final inspection.

3.13 CONSTRUCTION NEAR UTILITY SYSTEMS:

3.13.1. All contractors shall be responsible for processing their own Work Clearance Request (AF Form 103), commonly known as a “Digging Permit,” and coordinating with Government inspectors

GENERAL REQUIREMENTS 01 00 00 - 6

as required. It is also the sole responsibility of the Contractor to make all requests for locates and marking by the private sector. Note that private companies supply numerous utilities and services on Malmstrom Air Force Base. AF Form 103 does not address coordination with private companies.

Requests for locates by private firms shall be performed by the contractor in accordance with State of Montana and Federal regulations. The Contractor is responsible for obtaining all coordination signatures for the permit. The approved permit shall be valid for a period not to exceed 90 calendar days. TO THE MAXIMUM EXTENT POSSIBLE, ELIMINATE PERMANENT MARKINGS ON PAVEMENT AND CURBS. The contractor shall be responsible for maintaining all utility markings. Location marks shall be removed after 14 calendar days if not used.

All markings shall be accomplished with water-based chalk (Aervoe Pacific Inc. 1-800-227-0196 or equal). No paints will be used. Detailed permit procedures and guidelines shall be provided to the contractor during the Pre-performance Conference. Digging within three feet of all buried utilities shall be performed by hand digging until the utility is exposed. The Project Inspector shall be notified three days prior to digging within a three-foot area near this utility. A representative from communications (Base Comm) must be present during excavation of Communications Cables. The cable piping routes must be marked prior to excavation in the area. The Contractor shall be held responsible for any damage to a marked or identified utility by excavation procedures. Once the utility is exposed, mechanical excavation may be used if there is no chance of damage occurring to the cable or piping system. The contractor is responsible for marking all excavations he will do, five

(5) work days prior to needing existing utilities marked by the government.

All located utilities that are in the paths of directional drilling shall be potholed to determine if they interfere with the intended path. Pothole to a depth of at least two feet below the depth of the intended path to ensure that the path is clear. Backfill and repair all potholes.

3.13.2. Reburial of Exposed Utilities: When existing utility lines are reburied, a tape, detectable by pipe detector systems, shall be installed above the uncovered length of the utility at a depth of 12 inches below grade. Tape shall be a minimum five mil plastic tape with metallic tracer, minimum three inches wide, lettering on tape to show buried utility, and brightly colored.

3.13.3. Access to Communications Manhole or Handhole: No communications manhole or handhole shall be entered without first obtaining a fiber optic cable briefing. Coordinate through plans office, SCXP.

3.13.4 All repairs due to cable cuts on scope exchange cables shall be the responsibility of the Contractor. Repair actions must be accomplished by the current scope exchange contractor and paid for and coordinated under this contract at no additional cost to the Government if the contractor is deemed to be at fault by the Contracting Officer. Work to restore lost service must begin within one hour after the cut and must continue unceasingly until the job is completed, tested, and accepted. Work will be inspected by Communications Squadron and scope exchange personnel.

3.14 UTILITY OUTAGES

All utilities programmed to be interrupted during construction shall be scheduled at least 14 calendar days in advance of the outage and at a time convenient for the government. The “Utility Outage Notice” will be completed by the Contractor and submitted to Construction Management for approval. No interruptions shall be made until the outage notice is approved and returned to the

GENERAL REQUIREMENTS 01 00 00 - 7

Contractor. Notification forms that are to be filled out by the Contractor will be provided at the pre-construction conference. Utilities will include all overhead and underground utilities and road closures or partial closures. The Contractor shall notify the Contracting Officer and the affected users when the service is restored. The Contractor shall also give 7 days notice prior to performing work near houses and in yards.

3.15 SUBMITTALS

Contractor shall submit three copies of all submittals, to be recorded on AF Form 66. Submittal items, including samples, shall be marked with a number corresponding to the item number on the AF Form 66, and the page and paragraph number of the specification requiring the submittal.

Contractor shall hi-lite specifics when submitting catalogs, etc. The contractor shall schedule and submit all required items for major systems (such as HVAC, etc) at the same time to enhance review of interrelated components. It is the Contractor’s responsibility to ensure the dates provided on the form do not create any delays in construction. Provide the completed form to the Contracting Officer at or prior to the Pre-Construction meeting. The completed form will then be used by the Government for tracking submittal progress. If the contractor is proposing to use an exact brand name or product specified, a submittal for that item is not required. In lieu of a submittal, the contractor shall submit a letter to the Contracting Officer outlining each item that will be provided exactly as specified. These items will also be annotated as such on the AF Form 66.

Even though a specified product is provided, in some circumstances a submittal may still be required for color selection, etc. Approval of submittals by the Contracting Officer shall not relieve the Contractor from responsibility for deviations from drawings or specifications, nor shall it relieve him from responsibility for errors in shop drawings or other submittal literature.

3.16 CONTRACTOR STORAGE AREA AND WORK SITE:

Prior to notice to proceed, Contractor will be provided a storage area on the base within three miles of the project site or as designated on the site plan. All contractor equipment and materials shall be stored in this area except for materials that will be used on the job within a 48 hour period.

Contractor is responsible for the security of assigned storage area (3,000 S.F., more or less).

Temporary storage buildings (excluding tractor trailers) sited in the storage area shall conform to the base color scheme (Antique Linen, Fed. No. 23578). Architectural and structural features of all temporary facilities (including tractor trailers) shall be maintained in good repair as required by the Contracting Officer. Work site and storage areas shall be enclosed by 6’ chain link fence with access gates. Spare keys to any locked gates shall be provided to the base fire department dispatch office.

Storage areas and job sites shall be clean, orderly, and free of debris, demolished/excess materials, etc. Job sites will be cleaned daily and refuse and debris removed from the site. Fences will be maintained. Grass and weeds shall be cut weekly at the storage area and work site. If at any time during the life of the contract, the Contracting Officer determines that base standards are not being met, he/she may direct the Contractor to perform such actions as necessary to bring the area and/or facilities up to base standards at no additional cost to the Government. If the contractor fails to bring the area and/or facilities up to standards, the Contracting Officer may direct the Contractor to remove themselves and/or the facility/storage unit or materials from the base at no cost to the Government.

3.17 REPAIR OF ROAD CUTS

GENERAL REQUIREMENTS 01 00 00 - 8

Not used

3.18 QUALITY CONTROL

3.18.1. General. THE CONTRACTOR IS RESPONSIBLE FOR QUALITY CONTROL

WHICH IS CONSIDERED BY THE GOVERNMENT TO BE A MAJOR INSPECTABLE

ITEM OF THIS CONTRACT. In addition to CONTRACT CLAUSE, INSPECTION OF CONSTRUCTION, the Contractor shall comply with the Quality Control Provisions as specified herein. Only first tier subcontractors will be allowed on this project. All subcontractors must report directly to the general contractor unless otherwise indicated in these specifications. The Contractor shall perform all Quality Control inspection and/or testing required by this contract unless specifically designated to be performed by the Government. The Quality Control system must consist of personnel, plans, procedures, and organization necessary to provide materials, equipment, workmanship, fabrication, construction, and operations which comply with contract requirements.

The system shall cover construction operations, including fabrication both on-site and off-site, and shall be keyed to the proposed construction sequence. If the Contractor fails to submit an acceptable Quality Control Plan within the time herein prescribed, the Contracting Officer will refuse to allow construction to start.

3.18.2. Quality Control Plan: General: Prior to the start of construction, the Contractor’s Quality Control Plan must be accepted by the Government. Construction will be permitted to begin only after acceptance of the contractor’s Quality Control Plan. The Contractor’s Quality Plan shall identify the personnel, procedures, instructions, records, forms, and as a minimum, shall include the following:

3.18.2.1. A description of the Quality Control management organization including an organizational chart.

3.18.2.2. The number, classifications, qualifications, duties, responsibilities, and authorities of personnel: A copy of a letter, signed by an authorized official of the firm, which describes the responsibilities and delegates the authorities of the Quality Control manager shall be furnished. The Quality Control manager must have a minimum of five years of documented experience in the primary areas of construction included in this contract. Include qualifications in the submitted plan for Government approval.

3.18.2.2.1. This contract requires a part time Quality Control Manager. This individual may have other assigned functions within the contractor’s organization but most commit a minimum average of 4 hours per day toward fulfilling the QC requirements of this section. The hours dedicated to this function will be annotated in the submitted QC records.

3.18.2.2.2. The Contractor’s Quality Control activities to be performed, include those of subcontractors, off-site fabricators, and suppliers. A job specific detailed work item list for inspection purposes will be developed by the contractor. The list will be broken into sections identical to the contract specifications and will contain all inspection actions necessary to ensure full compliance with the contract. A sample from a simplified and generic project is included as Attachment 1 to indicate the level of detail expected in this checklist.

GENERAL REQUIREMENTS 01 00 00 - 9

3.18.2.2.3. Quality Control testing procedures including corrective actions to be taken where non-compliance is noted by the Quality Control Manager.

3.18.2.2.4. Documentation format for Contractor’s Quality Control activities and testing. The attached form is to be used for documenting daily inspections, corrective actions, etc.

3.18.2.2.5. Procedures for ensuring As-Builts are accurate and updated daily.

3.18.2.2.6. Safety program that ensures complete compliance with OSHA and the U.S. Army Corps of Engineers manual EM 385-1-1, Safety Health Requirements Manual. Any non-compliance issues are the responsibility of the Contractor and not the Government.

3.18.2.2.7. Methods to ensure scheduled appointments are met and documentation to verify arrival and departure times at the work site.

3.18.2.2.8. A listing of all required mechanical and electrical testing, balancing, and operational tests.

3.18.3. Acceptance: The Quality Control Plan will be reviewed and approved, if acceptable, by the Contracting Officer. The Contractor shall make such changes and additions necessary for clarity and completeness as requested by the Contracting Officer. Acceptance is conditional and the Government reserves the right to require the Contractor to make changes in the Quality Control Plan, personnel, and operations to correct deficiencies found by the Government during performance of work. No change shall be implemented prior to acceptance in writing by the Contracting Officer. Non-compliance with the Quality Control Plan will result in one or more of the following actions as the Government’s discretion:

3.18.3.1. Directed removal and replacement of the QC Manager.

3.18.3.2. Reduced progress payments until corrections are made.

3.18.3.3. Cure notices and other applicable contracting actions up to and including possible contract termination for default.

3.18.3.4. Other contractual actions deemed appropriate by the Contracting Officer.

3.18.4. Quality Control Records: The Quality Control Records shall contain a record of daily inspections for all work accomplished. Specific items of work checked each day will be annotated.

All work-in-place must be certified as complying with the contract plans and specifications. Non-compliance items must be clearly noted. Corrective actions must be outlined and detailed for non-compliance items. The Contractor shall maintain daily records, which will be on-the-job site and available for review by the Contracting Officer or his technical representative. Daily reports will be signed by the designated Quality Control Manager and will indicate hours spent on Quality Control that day. A copy of the QC daily reports shall be given to the Contracting Officer by noon on the following day.

GENERAL REQUIREMENTS 01 00 00 - 10

3.18.5. Submittals: The contractor will submit four copies of the proposed Quality Control Plan for acceptance not more than 15 days after Award. No work will start until acceptance is made by the Contracting Officer. No exceptions will be provided to this requirement.

3.19 1354 CHECKLIST

Contractor will complete the Property Inventory checklist and submit it to the Contracting Officer 10 days prior to final inspection. Prior to completing the Form 1354 checklist, the Contractor shall request assistance from the Resource Management Flight. The checklist will be delivered to the Contractor at the Preconstruction conference.

3.20 WORK SCHEDULE

Working hours for the Contractor will normally be between the hours of 7:00 a.m. and 5:00 p.m.

excluding Saturdays, Sundays, and Federal Holidays. If the Contractor desires to work during periods other than above, additional government inspection forces may be required. The Contractor must notify the Contracting Officer three days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces when the Contracting Officer determines that they are reasonably available. If such force is reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days.

However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the adjustments to the contract price may be made periodically as directed by the Contracting Officer.

3.21 NUCLEAR DENSOMETERS

The use of nuclear densometers or other devices containing radioactive elements on Malmstrom AFB is controlled for safety and management purposes. The contractor must have proof of a Nuclear Regulatory Committee (NRC) permit for its use. The Contractor must also keep all radioactive equipment locked up when not in use and remove it from the base at completion of the work day. All projects requiring use of radioactive devices will be required to submit, for approval 30 days prior to use, the following information for review by the Base Radiation Safety Officer in (341 MDOS/SGOAB, Phone 406-731-4406):

1. Brief description of proposed activity.

2. Copy of current NRC or Agreement State License with NRC form 241

3. Name, address, phone number of responsible local representative and Radiation

Safety officer (RSO) named on their license.

4. Copy of part of the Air Force Contract describing work to be done and inclusive dates of the work.

5. An acknowledgement that the installation RSO can make periodic checks on use of the equipment.

6.

3.22 PROJECT SIGNS

No project sign is required for this project.

GENERAL REQUIREMENTS 01 00 00 - 11

3.23 REFERENCES

All references listed in these specifications are intended to be the current version or edition, unless specifically identified otherwise.

3.24 ENERGY EFFICIENT PRODUCTS

All equipment supplied under this contract that requires energy usage shall be ENERGY STAR compliant.

3.25 EXCESS SOIL

All excess soil from excavating shall be removed from the construction area and disposed of off base property in a legal manner.

END OF SECTION 01 00 00

Project Number NZAS 22-0010 Title Repair Street Lights, Matador Manor

Contract Number PR Number

Timeline Notice to Proceed Scheduled Completion Date Actual Starting Date Actual Completion Date

People Chief of Engineering Contracting Officer Construction Inspector

Contractor Name Representative Address

GENERAL REQUIREMENTS - ATTACHMENT 1 010000

QUALITY CONTROL REPORT TO INSPECTOR

Date: ____________

CONTRACT NO.

TITLE AND LOCATION

MALMSTROM AFB MT

REPORT NO.

CONTRACTOR (Prime or Subcontractor)

NAME OF SUPERINTENDENT OR QC REP

WEATHER TEMPERATURE

WEATHER EFFECTS

PRIME CONTRACTORS/SUBCONTRACTOR WORKFORCE

(If space provide below is inadequate, use additional sheets

NUMBER

TRADE

HOURS

EMPLOYER

ACTIVITY/TASK PERFORMED

COMP

NON

COMP

TOTAL WORK HOURS ON

JOB SITE THIS DATE______

CUMULATIVE TOTAL OF

WORK HOURS FROM

PREVIOUS REPORT_______

TOTAL WORK HOURS

FROM START OF

CONSTRUCTION

KTR INITIALS CERTIFY INSPECTION OF ACTIVITY INITIALS

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

YES NO

IF YES, A COPY OF THE COMPLETED OSHA REPORT IS REQUIRED

CONSTRUCTION AND PLANT EQUIPMENT LEFT ON JOB SITE UNTIL USE IS COMPLETED

DESCRIPTION DATE FIRST ON

JOB (FIRST TIME

ONLY)

HOURS WORKED

THIS DATE

HOURS IDLED DATE OF FINAL

REMOVAL FROM JOB SITE

CONSTRUCTION AND PLANT EQUIPMENT NOT LEFT ON JOB SITE PERMANENTLY

(This will include pickup trucks and mobile mounted items, such as compressor, that are also used for transportation to and from the job)

DESCRIPTION HOURS WORKED HOURS IDLED

SPEC PARA AND/OR

DRAWING NO.

LOCATION AND DESCRIPTION OF DEFICIENCIES

(Materials, Equipment, Safety, and/or Workmanship) ACTION TAKEN OR TO BE TAKEN

GENERAL REQUIREMENTS - ATTACHMENT 1 010000

REFERENCE

DEFICIENCIES CORRECTED THIS DATE

REPORT NO.

COMPLIANCE

NOTICE NO.

INSPECTION AND/OR TESTING PERFORMED

TODAY-FOLLOW WITH REPORT

LOCATION AND/OR

ELEMENT OF WORK

REMARKS

RESULTS OF INSPECTION/TESTING

SPEC PARA/

DRAWING NO.

EQUIPMENT/MATERIAL RECEIVED TODAY TO BE

INCORPORATED IN JOB (Description, Sizes, Quantity)

SUBMITTAL NO. OR

CERTIFICATION

DATE

APPROVED

REMARKS:

(Document Total QC Hours for this Day, Directions Received from Government, and Compliance Notices, Etc)

Quality Control Rep Date

CONSTRUCTION REPRESENTATIVES REMARKS AND/OR EXCEPTIONS TO THIS REPORT

Construction Representative Date

CONTRACTOR ENTRY AUTHORIZATION LIST CURRENT AS OF 30 APR 2012

HOURS: Standard

DAYS: Standard

CODES: Standard = 0600 - 1800 Mon - Sat

DATE UPDATED:

NAME (Last, First MI) SSN DOB STATE/DL# Height Weight

Eye Color Hair Color SEX RESIDENCE (HOME) ADDRESS COMPANY

ACCESS

REQUIRED

(SAMPLE) SMITH, JOHN D 121456789 10-Jul-60 MT/0000000000000 72"/200 Blue/Brown M 0000 12th Ave N, Great Falls, MT Smith Construction BW or 24/7

Standard BW

Standard BW

Standard BW

Standard BW

Standard BW

Standard BW

Standard BW

(local)Project Manager Contracting Officer

Name/Phone Name/ Phone

All Days = 24/7

BW = Basewide

The personnel listed below have been verified and will require unescorted entry onto Malmstrom AFB to perform official contractual duties. All commercial/contractor vehicles must be searched regardless of size. All contractors will enter the installation through the 10th Ave North Gate.

If there are any questions please contact the PROJECT MANAGER - Steve Bucini @ (509)258-7200

SUBJECT:

COMPANY:

EFFECTIVE DATE:

EXPIRATION DATE:

MEMORANDUM FOR: 341st Contracting Squadron

CONTRACT #:

CONTRACTING OFFICER VERIFICATION

INFORMATION CONTAINED HEREIN IS PERSONAL AND WILL NOT BE DISCLOSED TO THE PUBLIC WITHOUT CONSENT OF THE INDIVIDUALAFI 33-332, AIR FORCE PRIVACY ACT PROGRAM APPLIES.

PROJECT MANAGER VERIFICATION

CONTRACTING OFFICER VERIFICATION

INFORMATION CONTAINED HEREIN IS PERSONAL AND WILL NOT BE DISCLOSED TO THE PUBLIC WITHOUT CONSENT OF THE INDIVIDUALAFI 33-332, AIR FORCE PRIVACY ACT PROGRAM APPLIES.

INFORMATION CONTAINED HEREIN IS PERSONAL AND WILL NOT BE DISCLOSED TO THE PUBLIC WITHOUT CONSENT OF THE INDIVIDUALAFI 33-332, AIR FORCE PRIVACY ACT PROGRAM APPLIES.

INFORMATION CONTAINED HEREIN IS PERSONAL AND WILL NOT BE DISCLOSED TO THE PUBLIC WITHOUT CONSENT OF THE INDIVIDUALAFI 33-332, AIR FORCE PRIVACY ACT PROGRAM APPLIES.

INFORMATION CONTAINED HEREIN IS PERSONAL AND WILL NOT BE DISCLOSED TO THE PUBLIC WITHOUT CONSENT OF THE INDIVIDUALAFI 33-332, AIR FORCE PRIVACY ACT PROGRAM APPLIES.

INFORMATION CONTAINED HEREIN IS PERSONAL AND WILL NOT BE DISCLOSED TO THE PUBLIC WITHOUT CONSENT OF THE INDIVIDUALAFI 33-332, AIR FORCE PRIVACY ACT PROGRAM APPLIES.

INFORMATION CONTAINED HEREIN IS PERSONAL AND WILL NOT BE DISCLOSED TO THE PUBLIC WITHOUT CONSENT OF THE INDIVIDUALAFI 33-332, AIR FORCE PRIVACY ACT PROGRAM APPLIES.

INFORMATION CONTAINED HEREIN IS PERSONAL AND WILL NOT BE DISCLOSED TO THE PUBLIC WITHOUT CONSENT OF THE INDIVIDUALAFI 33-332, AIR FORCE PRIVACY ACT PROGRAM APPLIES.

SECURITY 01 00 10 - 1

SECTION 010010 - SECURITY

PART 1 - GENERAL

1.1 IDENTIFICATION OF EMPLOYEES

A. The Contractor shall furnish an Entry Authority List (EAL) of employees needing access on base to the Base Contracting Officer. Employees without a badge and identification in their possession will be denied access to the base and work areas. All security issues will be discussed during the preconstruction conference. Note that it may take up to 14 calendar days after submitting EAL to be cleared to receive badge.

1.2 FORCE PROTECTION

A. Contractor personnel are required to abide by all real world Force Protection Condition (FPCON) measures, random anti-terrorism measures (RAMs), shelter-in-place orders, evacuations and lock-down notices as directed. Examples include mandatory badge or ID checks, facility single points-of-entry and searches of hand carried items.

1.3 ANTI-TERROISM (AT) AWARENESS TRAINING

In accordance with DoDI O-2000.16v1_AFI 10-245-O, Antiterrorism (AT) Program Implementation, ensure Level I - AT Awareness Training is completed by all personnel within 30 days of requiring access, and annually thereafter. The training will be provided by the government. The objective of the training is to provide personnel with requisite knowledge necessary to remain vigilant and enable employment of AT tactics, techniques, and procedures. This training will be conducted by 341st Contracting Squadron, by providing a written pamphlet for review.

PART 2 - PRODUCTS

(Not Applicable)

PART 3 - EXECUTION

3.1 CONDUCT OF WORK

A. Coordination and Access to Site: Coordination with using agencies shall be made through the

Contracting Officer or designated representative to assist the Contractor in completing the work with a minimum of interference and inconvenience.

B. General Area Requirements: Security requirements and procedures shall be coordinated with the 34l

Security Forces Squadron, Operations Section (extension 731-6416/4341), Malmstrom AFB.

Activities of the Contractor and the Contractor's employees and subcontractors and their employees while on the base, will be in accordance with base regulations, including those of the fire marshall, as well as security directives. This includes, but is not limited to, giving way to all emergency vehicles that are in a response mode. All personnel performing duties as an escort official(s) for contractors within a restricted area are briefed thoroughly on control methods and actions to take to enforce control.

SECURITY 01 00 10 - 2

Contractors will be briefed on security procedures and their responsibilities prior to the start of a contract. Contractor personnel are required to abide by all real world FPCON measures, RAMs (Random Anti-Terrorism Measures) shelter-in-place, evacuations, lock-down notices as directed, search of personnel and items, and ID checks. Contractors will be notified as necessary, to changes in security procedures.

1. Identification Credentials: All Contractor personnel, except those not under the

Contractor's direct control, such as material deliveries, will be required to process in and obtain an Application for Civilian Identification Card (Air Force Form 355 or AF Form 1172) from the Malmstrom AFB Contracting Office in Building 145. After completion of the AF Form 355 or AF Form 1172, proceed to the Visitor Control Center in Bldg 192, open 0730-1630, to obtain identification badge. In addition, all private vehicles requiring access to the base will be required to display a vehicle sticker (AF Form 75) which may also be obtained in Bldg 192 after presentation of vehicle registration and certification of vehicle insurance coverage. The Contractor shall notify the 341 Security Forces Squadron, Operations Section, through the Contracting Officer, of any lost badges within 48 hours after the loss, by name, address, social security number, and badge number. Employees who have terminated employment or who have been dismissed must surrender their AF Form 75 Visitor/Vehicle Pass and Identicard 2000 Contractor ID Card to the Visitors Control Center through the Contracting Officer. Employees without a badge in their possession will be denied access to the base and work areas and may be subject to detainment until proper identification is made. The badge shall not be worn or displayed off the military base.

2. Commercial or company vehicles will be allowed access to the base provided company emblems are permanently attached to the sides of the vehicles. Magnetic signs are not acceptable. Personnel still require a badge or pass as identified in paragraph 1.

ENVIRONMENTAL PROTECTION 01 36 00-1

SECTION 01 36 00

ENVIRONMENTAL PROTECTION

1.0 REFERENCES

The publications listed below form a part of this specification to the extent referenced. All references listed in these specifications are intended to be the current version or edition, unless specifically identified otherwise. The Contractor shall conform to the Occupational Safety & Health Act, Environmental Protection Agency, Montana Dept. of Environmental Quality, U.S. Air Force and all other Federal, State and Local environmental regulatory requirements.

29 CFR Occupational Safety and Health Administration

40 CFR Environmental Protection Agency

49 CFR Department of Transportation

EM 385-1-1 U.S. Army Corps of Engineers Safety and Health

Requirements Manual (1996)

WETLANDS U.S. Army Corps of Engineers Wetlands Delineation Manual

341 SW OPLAN 32-00-1 Malmstrom Green Purchasing Program Plan

341 SW OPLAN 32-7042 Malmstrom Hazardous Waste Management Plan

341 SW OPLAN 32-7043 Malmstrom Solid Waste Management Plan

AFI 32-7080 Pollution Prevention Program

AFI 32-7086 & SUP Hazardous Materials Management

2.0 PERMITS AND FEES

2.1 No separate payment will be made for work covered under this section. The Contractor shall be responsible for payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor. All costs associated with this section shall be included in the contract price. The Contractor shall be responsible for payment of all fines/fees for violation or non-compliance with Federal, State, Regional and local laws and regulations.

2.2 The Contractor shall be responsible for obtaining and complying with all environmental permits and commitments required by Federal, State, regional, and local environmental laws and regulations.

2.3 Environmental Deliverables: The Contractor, Architect, Project Manager, or other responsible party shall provide signed copies of all applicable environmental permits, forms, and plans to 341

ENVIRONMENTAL PROTECTION 01 36 00-2

CES/CEIEC within five (5) business days of receipt or submittal. Deliverables shall include copies, as applicable, of:

construction dewatering permit (see §4.1.1) construction storm water notice of intent (see §4.3.1.A) construction storm water pollution prevention plan (see §4.3.1.B) construction storm water notice of termination (see §4.3.1.1.C) signed statement that the project used no new asbestos containing materials (see §6.1.2)

2.4 Demolition Work: Contractors shall notify the Montana Dept. of Environmental Quality, Asbestos Control Program, 1520 East 6th Avenue, PO Box 200901, Helena, MT. 59620-0901 prior to any demolition work where load bearing members are removed.

3.0 AIR QUALITY

3.1 Equipment operation, activities, or processes performed by the Contractor shall be in accordance with all Federal and State air emission and performance laws and standards.

3.2 Burning of material is not allowed on base by the Contractor.

3.3 Particulates - The contractor shall not operate a construction site or demolition project unless reasonable precautions are taken to control emissions of particulate matter. Such emissions of airborne particulate matter shall not exceed 20% opacity as defined in 40 CFR 60 Appendix A.

3.4 Sound Intrusions - The Contractor shall keep construction activities under surveillance and control to minimize environment damage by noise. The Contractor shall comply with the provisions of the State of Montana rules.

3.5 Ozone Depleting Chemicals (ODCs)

3.5.1 The contractor shall ensure activities performed under this contract are in compliance with the Air Force Instruction (AFI) on ODCs. The contractor shall not purchase, use, nor specify the use of any Class I ODC in the production, design, or maintenance of the end item. Class II ODCs may be used or specified only with the written approval of the Contracting Officer. ODCs are identified and classified in Air Force Instructions AFI32-7080 and AFI32-7086 & Sup).

3.5.2 Air Conditioning & Refrigeration Equipment - Any maintenance, repair and demolition work to air conditioning and refrigeration equipment shall require that all CFC (Chlorofluorocarbons) handling standards be met. The contractor shall not furnish any equipment that requires the use of ozone depleting chemicals nor shall he vent or cause to be vented CFC or HCFC (Hydrochlorofluorocarbons) refrigerants or other mixtures containing CFCs to the atmosphere during repair, maintenance or demolition work on the equipment covered by this contract. The contractor shall have available refrigerant recovery or reclaim equipment to perform the work.

Personnel who operate refrigerant reclaim or recycling equipment shall possess the necessary state and local certifications for operating the equipment. The contractor shall be responsible for meeting all requirements, permitting, licensing and certification required by state or local ordinance to work

ENVIRONMENTAL PROTECTION 01 36 00-3

on refrigeration systems. Replacement compressors and other replacement equipment used in repairing CFC-containing systems shall be compatible with CFC replacement refrigerants.

4.0 WATER RESOURCES AND STORM WATER DISCHARGE

The Contractor shall monitor construction activities to prevent pollution of surface and ground waters. Toxic or hazardous chemicals shall not be applied to soil or vegetation unless otherwise indicated. The Contractor shall monitor all water areas affected by construction activities. For construction activities immediately adjacent to impaired surface waters, the Contractor shall be capable of quantifying sediment or pollutant loading to that surface water when required by State or Federally-issued Clean Water Act permits.

4.1 The contractor shall not discharge any contaminated materials into the storm drain system on Base. The contractor shall obtain Montana Department of Environmental Quality permit coverage for discharges of disinfected water into the Malmstrom storm sewer system from hydrant testing, hydrostatic testing, water mains disinfection, or similar. EPA authorizes the following non-storm water discharges: fire fighting activities; fire hydrant flushing; potable water sources; irrigation drainage; lawn watering; routine building wash-down without detergents; pavement wash-waters where spills/leaks of toxic or hazardous materials have not occurred and where detergents are not used; air conditioning condensate; springs; uncontaminated groundwater; and foundation/footing drains where flows are not contaminated with process materials such as hydrocarbons/solvents.

4.1.1 Montana Department of Environmental Quality, General Permit for Construction Dewatering, Permit Number MTG070000 (dewatering general permit) applies to “construction dewatering discharges originating from dewatering of cofferdams, trenches, excavation pits or other excavations associated with construction where sediment-laden groundwater or surface water inflow may be discharged to state surface water ...” The contractor shall obtain coverage under the dewatering general permit prior to construction dewatering activities where necessary.

4.2 Sanitary Sewer - The Contractor shall not dump any restricted materials down the sanitary sewer or wastewater disposal system without approval of the Air Force. All discharges to the sewer shall meet Federal, State, and Local regulatory requirements and shall meet the permit requirements limiting MAFB discharges. The base sewer discharge is tested weekly by the City of Great Falls for conformance requirements.

4.2.1 Restricted waste water materials include:

A. Any water or waste having a pH lower than 5.5 or higher than 9.0 or having any other corrosive property which reasonably could be hazardous to structures, equipment or personnel, such as, but not limited to, battery or plating acids and wastes, copper sulfate, chromium slats and compounds, or salt brine;

B. Any waters or wastes containing strong acid iron pickling wastes, or concentrated plating solutions whether neutralized or not, shall be prohibited from discharge;

ENVIRONMENTAL PROTECTION 01 36 00-4

C. Any water or waste containing fats, wax, grease, or oils, whether emulsified or not, in excess of one hundred mg/l or containing substances which may solidify or become viscous at temperatures between thirty-two degrees Fahrenheit or zero degrees centigrade and one hundred fifty degrees Fahrenheit or sixty-five degrees centigrade;

D. Any volume of flow or concentration of wastes defined as slug loads or other…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .