D1_Mold Figure Working_Edited.pdf
PDF 239 KB Posted
- Attached to
- Mold Remediation Services - Building 1075 Federal contract opportunity
- Solicitation number
- FA462625Q0062
About this file
This document is an As Built Crawlspace Floor Plan for Mold Remediation at a facility located at Malmstrom Air Force Base in Montana. The floor plan details a comprehensive mold remediation project with specific instructions for the contractor. Key notes include: (1) removing insulation in the crawlspace, (2) verifying the crawlspace layout, and (3) understanding that the mold remediation activities extend into the mechanical room as shown in the Statement of Work (SOW) photographs. The floor plan includes a detailed layout with a key indicating unexcavated areas, providing a precise visual guide for the remediation work.
The drawing provides a complete architectural floor plan view with intricate room and space details, allowing the contractor to understand the precise scope and layout of the mold remediation project. The document is specifically for waste and vent piping demolition, suggesting a comprehensive facility maintenance and environmental remediation effort focused on addressing mold contamination in the crawlspace and mechanical areas of the building.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - FA462625Q00620001.pdf | ||
| Solicitation Amendment FA462625Q00620001 SF 30.pdf | ||
| Questions - Final.pdf | ||
| D2_Mold Mechanical Room Work.pdf | ||
| A1_23-089-073 DEFAC Assessment.pdf | ||
| B2_Mold Photographs Portrait.pdf | ||
| B1_Mold Photographs Landscape.pdf | ||
| C1_Original First Floor Plan with Unexcavated Crawlspace .085in=1ft.pdf | ||
| Wage Determination - SAM.pdf | ||
| SOW Mold Remediation - Bldg 1075.pdf | ||
| Solicitation - FA462625Q0062.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A S
B U
IL
T
CRA
W
LSPA
CE FLO
O
R PLA
N
M O
LD
R
E M
E D
IA
T
IO
N
F
IG
U R
E N
O T
E S
1. R em ove insulation in the craw lspace per the S
O W
2. M old rem ediation activities shall extend into the m echanical room as show n in the photographs in S O
W A ppendix D
3. T his figure is based on as-builts. T he contractor shall verify craw lspace layout.
K E
Y
U nexcavated A reas
File details come from the government source that posted it. Updated .