QandA.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- DFAC Flooring
- Solicitation number
- FA462623Q0004
About this file
This document contains a spreadsheet with questions and answers regarding a federal contract solicitation for flooring replacement at a Department of the Air Force dining facility. The solicitation seeks bids to replace approximately 1,030 square feet of tile flooring and 530 square feet of cooler flooring. The existing kitchen tile and cooler floors must be replaced with new materials compatible with the current cooler system. Questions are due by April 27th while bids are due by May 4th. No site visit will be provided and all necessary details are included in the attachments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QandA.xlsx | XLSX spreadsheet | |
| 5_Submittal Schedule.xls | XLS spreadsheet | |
| 2_Combined Specifications.pdf | ||
| 6_Bid Schedule.pdf | ||
| 4_As Built Drawings Combined.pdf | ||
| COMBO_DFAC Flooring.pdf | ||
| 1_DFAC Flooring Statement of Work.pdf | ||
| 3_Bldg 1075_Limited Asbestos Report_2023.04.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| REQUIREMENT NAME AND SOLICITATION NUMBER | ||
| Questions and Answers | ||
| Question # | Question | Answer |
| 1 | What type of flooring? | The existing kitchen flooring is tile. The flooring in the coolers are part of the cooler system. Please see the included specifications for the new tile needed. The new cooler flooring must be compatible with the existing cooler system. |
| 2 | What is the SQFT of the area? | The floor plan included in the bid package gives about 1,030 sf of new flooring and about 530 sf of cooler flooring. |
| 3 | Will there be a site vist?/Can we schedule a site visit for this requirement? | There will not be a site visit for this requirement. Please see attached documents for requirement details. |
| 4 | ||
| 5 | ||
| 6 | ||
| 7 | ||
| 8 | ||
| 9 | ||
| 10 | ||
| 11 | ||
| 12 | ||
| 13 | ||
| 14 | ||
| 15 | ||
| 16 | ||
| 17 | ||
| 18 | ||
| 19 | ||
| 20 | ||
| 21 | ||
| 22 | ||
| 23 | ||
| 24 | ||
| 25 | ||
| 26 | ||
| 27 | ||
| 28 | ||
| 29 | ||
| 30 | ||
| 31 | ||
| 32 | ||
| 33 | ||
| 34 | ||
| 35 | ||
| 36 | ||
| 37 | ||
| 38 | ||
| 39 | ||
| 40 | ||
| 41 | ||
| 42 | ||
| 43 | ||
| 44 | ||
| 45 | ||
| 46 | ||
| 47 | ||
| 48 | ||
| 49 | ||
| 50 | ||
| 51 | ||
| 52 | ||
| 53 | ||
| 54 | ||
| 55 | ||
| 56 | ||
| 57 | ||
| 58 | ||
| 59 | ||
| 60 | ||
| 61 | ||
| 62 | ||
| 63 | ||
| 64 | ||
| 65 | ||
| 66 | ||
| 67 | ||
| 68 | ||
| 69 | ||
| 70 | ||
| 71 | ||
| 72 | ||
| 73 | ||
| 74 | ||
| 75 | ||
| 76 | ||
| 77 | ||
| 78 | ||
| 79 | ||
| 80 | ||
| 81 | ||
| 82 | ||
| 83 | ||
| 84 | ||
| 85 | ||
| 86 | ||
| 87 | ||
| 88 | ||
| 89 | ||
| 90 |
&"Times New Roman,Regular"&P of &N
Sheet2
| remove draft stamp |
| topr may 4th 3 pm |
| questions due by the 27th of April |
| Wage Determination |
| Skim through TOPR |
File details come from the government source that posted it. Updated .