5_Submittal Schedule.xls

XLS spreadsheet 38 KB Posted

Attached to
DFAC Flooring
Solicitation number
FA462623Q0004
Issued by

About this file

This document is a submittal schedule for a federal contract to repair floors at a dining facility building at Malmstrom Air Force Base in Montana. The schedule lists ten required technical submittals including product data and color charts for resilient flooring materials, a cut sheet for cooler flooring, and asbestos testing results. Submittals are due between ten and fourteen days prior to various project milestones, with the contractor notified of approval or disapproval and allowed to resubmit as needed. The related solicitation is for DFAC flooring repair through the Department of the Air Force Global Strike Command, numbered FA462623Q0004.

View the file

Other files

File Type Posted
QandA.xlsx XLSX spreadsheet
QandA.xlsx XLSX spreadsheet
2_Combined Specifications.pdf PDF
6_Bid Schedule.pdf PDF
4_As Built Drawings Combined.pdf PDF
COMBO_DFAC Flooring.pdf PDF
1_DFAC Flooring Statement of Work.pdf PDF
3_Bldg 1075_Limited Asbestos Report_2023.04.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
1074314Repair Floor DFAC, Bldg 1075
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSCDSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSNOTIFICATIONOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
Division 01APPROVEDDIS- APPROVED
101 00 00 - 3.1 Start of WorkX10 Days PTW
201 00 00 - 3.2 Pre Final and Final InspectionsX14 Days PTI
301 00 00 - 3.13 AF Form 103X5 Day PTSW
401 00 10 - 1.1 EALX14 Day PTW
5Provide asbestos test results on cooler flooring materialsX10 Days PTW
Division 09
609 65 13 - 1.3 Resilient Base & Accessories Product DataX10 Days PTW
709 65 13 - 1.3 Resilient Base Color ChartX10 Days PTW
809 65 19 - 1.3 Resilient Tile & Accessories Product DataX10 Days PTW
909 65 19 - 1.3 Resilient Tile Color ChartX10 Days PTW
10Provide cut sheet for cooler flooringX10 Days PTW
Schedule of Abbreviations:
ACA= After Contract AwardPTFI= Prior to Final Inspection
AFA= After Final AcceptancePTFP= Prior to Final Payment
AFI= After Final InspectionPTNT= Prior to Notice to Proceed
ANTP= After Notice to ProceedPTO= Prior to Outage
AWC= After Work CompletedPTSA= Prior To Start of Action
BMF= Before Material DeliveryPTSW= Prior to Starting Work
EWD= Each work day AF Form 3000 not requiredSN= Advance Notification
PTCW= Prior to Completing WorkSRO= After Each Occurrence
PTFA= Prior to Final AcceptancePSS= Per Submittal Schedule

&L&"Times New Roman,Regular"&12MALMSTROM AFB, MONTANA&R&"Times New Roman,Regular"&12FA4626-xxxx &L&"Times New Roman,Regular"&12AF Form 66 &F-&D&C&"Times New Roman,Regular"&12 01330a-&P

REQUIRED TECHNICAL SUBMITTALS