Questions_and_answers-_Set_4.pdf

PDF 84 KB Posted

Attached to
Updgrade MAF Electrical Components Updgrade MAF Electrical Components Federal contract opportunity
Solicitation number
FA4626-17-R-0005
Issued by
Department of the Air Force Global Strike Command

About this file

Response to questions set 4

View the file

Other files for this federal contract opportunity

Other files attached to Updgrade MAF Electrical Components Updgrade MAF Electrical Components, newest first.
File Type Posted
Photos_of_conduit_feeding_into_103_room.pdf PDF
Site_Visit_Minutes.pdf PDF
Question_Set_3.pdf PDF
Question_Set_2_-_Elevator_Shaft_Lighting_-_ladder_alternative.pdf PDF
UPDATE_ELECTRICAL_COMPONENTS_AT_MAFS.pptx PPTX presentation
QUESTIONS_and_Answers_-_Set_1.pdf PDF
Attach_6_Installation_Perimeter_Access.pdf PDF
Attch_8_Past_Performance_Questionaire.pdf PDF
Attach_3_Schedule_of_Drawings.pdf PDF
Attch_9_Subcontractor_Consent.doc DOC document
Solicitation_FA462617R0005.pdf PDF
Attach_1_Specifications.pdf PDF
Attach_2_Submittal_Schedule.pdf PDF
Attach_7_Special_Contract_Requirements.pdf PDF
Attach_4_IFB_Drawings_no_Seal.pdf PDF
Attach_5_Wage_Determinations.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4626‐17‐R‐0005

UPGRADE ELECTRICAL COMPONENTS

QUESTIONS

1. Detail 3/E.3 shows an 8’ ground rod. Specification 26 05 26 2.2 D. 1.

Says ¾” x 10’ copper clad. Is specification correct? Yes

2. Details 1/E‐6 and 2/E6 call out for ¾”, 1”, 11/4”, and 3” conduit to be pvc coated rigid. That conduit is not in stock and will take several days to get. Can we change it to schedule 80 pvc, or can we coat rigid conduit ourself with Carboline Bitumastic 50(info attached)? No, Coated PVC Rigid Galvanized conduit is required

3. Can we get a photo of where the 3” conduit enters the LCDA. If it enters in the rear it will be difficult to access as the incoming service lines have filters on them and the wire to PP needs to be disconnected before pulling. We believe that the 3” conduit come in the bottom of the LCDA panel vs. the rear. We will attempt to get a picture of where the 3” conduit enters the LCDA panel by end of Monday 5‐8‐17.

4. There will be a lot of holes, bare spots, etc. when equipment and conduit is demolished in small garage/pump house. Are we to paint and patch as needed? Patch as needed. No painting, match existing weather siding. We can provide existing siding information for matching.

5. There are 6 sites that will require trenching from the pole to the large garage. To avoid winter shutdown can we send two people ahead to do this work once it is coordinated with an inspector? The work will be outside the MAF, so we will not need a separate escort. Incorrect, Escort will be required unless free zone

6. Is there any work to be done with the fire alarm and the security cameras? Both are in the pump‐house/small garage. No work shall be done on the fire alarm or security cameras, however there are some

CCTV conduits that are on the exterior part of Pump House that should be identified and left alone. The CCTV conduit that feeds cameras runs back to Large Garage. Only exterior conduit that feeds back into pump house shall be removed and placed inside pump house.