Attach_2_Submittal_Schedule.pdf
PDF 47 KB Posted
- Attached to
- Updgrade MAF Electrical Components Updgrade MAF Electrical Components Federal contract opportunity
- Solicitation number
- FA4626-17-R-0005
About this file
Attachment 2 Submittal Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Photos_of_conduit_feeding_into_103_room.pdf | ||
| Questions_and_answers-_Set_4.pdf | ||
| Site_Visit_Minutes.pdf | ||
| Question_Set_3.pdf | ||
| Question_Set_2_-_Elevator_Shaft_Lighting_-_ladder_alternative.pdf | ||
| UPDATE_ELECTRICAL_COMPONENTS_AT_MAFS.pptx | PPTX presentation | |
| QUESTIONS_and_Answers_-_Set_1.pdf | ||
| Attach_7_Special_Contract_Requirements.pdf | ||
| Attach_4_IFB_Drawings_no_Seal.pdf | ||
| Attach_5_Wage_Determinations.pdf | ||
| Attach_6_Installation_Perimeter_Access.pdf | ||
| Attch_8_Past_Performance_Questionaire.pdf | ||
| Solicitation_FA462617R0005.pdf | ||
| Attach_1_Specifications.pdf | ||
| Attach_3_Schedule_of_Drawings.pdf | ||
| Attch_9_Subcontractor_Consent.doc | DOC document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 FA 4626-17-R-0005
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
NZAS 16-6001 Update Electrical Components at MAF's FA4626-17-R-0005
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
DATE CONTRACTOR NOTIFIED
APPROVED DIS-
APPROVED
DIVISION 01 - GENERAL REQUIREMENTS
GENERAL REQUIREMENTS 01 00 00 - 3.5.1
Permits 1 PTSW
2 GENERAL REQUIREMENTS 01 00 00 - 3.6.4 project Construction Work Schedule/ Gantt chart 4 20d
ANTP
* Tenative Work Schedule at Pre-Performance Meeting
3 GENERAL REQUIREMENTS 01 00 00 - 3.6.4
Weekly Construction Work Schedule 4 Weekly
4 GENERAL REQUIREMENTS 01 00 00 - 3.8 Start of Work Notification 4 10d
PTSW
5 GENERAL REQUIREMENTS 01 00 00 - 3.11 Utility Outages 4 10d
PTO
6 GENERAL REQUIREMENTS 01 00 00 - 3.13.2
Quality Control Plan 4 10d
ANTP
7 GENERAL REQUIREMENTS 01 00 00 - 3.13.5
Quality Control Records 1 EWD
8 GENERAL REQUIREMENTS 01 00 00 - 1.8 and
3.16.5 As-Built Drawings RED LINES 4 10d
AFI
9 GENERAL REQUIREMENTS 01 00 00 - 1.8 and
3.16.5 As-Built Drawings (Autocad and PDF formats) 4 30d
AFI
10 GENERAL REQUIREMENTS 01 00 00 - 1.8 and
3.16.1 O&M Manuals 4 30d
AFI
11 GENERAL REQUIREMENTS 01 00 00 - 3.27 Notice of Final Inspection 4 30d
AFI
GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.21 Contruction Near Utilities, Work Clearance Request (AF Form 103)
4 30d
AFI
13 ENVIRONMENTAL PROTECTION 01 36 00 - 2.3
Dewatering Discharge Permit 4 15d
PTSW
L
IN
E N
U M
B E
R
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
L O
R S
E L
E C
T
IO
N
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
M A
N U
FA
C
T U
R E
R 'S
W
A R
R A
N T
Y
M A
N U
FA
C
T U
R E
E C
O M
M E
N D
A T
IO
N
S
R E
Q U
IR
E
D S
U B
M
IS
SI
O
N
D
T
(B
Y
C
N T
R A
C T
O R
Number of Copies Required
O
PE
R A
T
IN
G
ST
R U
C T
IO
N
S
T E
ST
R
E
PO
R T
S
O T
H E
R
C A
T A
L O
G D
A T
A
REMARKS
D A
T E
R E
C E
IV
E
N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
G
IN
E E
R
IN
G
R E
T U
R N
S U
SP
E
SE
T
E
SU
B
M
IT
T A
L N
U M
B E
R S
FI
N
A L
A
PP
R O
V A
L
C O
N T
R A
C T
SU
B M
IT
T
L
NZAS 16-6001 Update Electrical Components at MAF's FA4626-17-R-0005
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
DATE CONTRACTOR NOTIFIED
APPROVED DIS-
APPROVED
L
IN
E N
U M
B E
R
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
L O
R S
E L
E C
T
IO
N
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
M A
N U
FA
C
T U
R E
R
R A
N T
Y
M A
N U
FA
C
T U
R E
C
O M
M E
N D
A T
IO
N
S
R E
Q U
IR
E
D S
U B
M
IS
SI
N T
R A
C T
O R
Number of Copies Required
O
PE
R A
T
R U
C T
IO
N
S
T E
ST
R
E
PO
R T
S
O T
H E
R
C A
T A
L O
G D
A T
A
REMARKS
D A
T E
R E
C E
IV
E
N
T R
A C
T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
SP
E
T
E
SU
B
M
IT
T A
L N
U M
B E
R S
FI
N
A L
A
PP
R O
V A
L
C O
N T
R A
C T
SU
B M
IT
T
14 ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.1
Hazardous Materials List Attachment 5 4 10d
SRO
15 ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.4
Hazmat Final Report 4 10d
PTFA
16 ENVIRONMENTAL PROTECTION 01 36 00 - 11.3.
Monthly Report of Solid Waste Disposal 4 Monthly
17 CUTTING AND PATCHING 01 73 10 1.4.A. Proposal 4 15d
PTSW
DIVISION 03 - CONCRETE
CAST-IN-PLACE CONCRETE 03 30 00 - 1.3.B
Product Data 4 15d
ANTP
CAST-IN-PLACE CONCRETE 03 30 00 - 1.3.C.
Reinforcement Shop Drawings 4 15d
ANTP
CAST-IN-PLACE CONCRETE 03 30 00 - 1.3.D. Lab tests, Mix design 4 15d
ANTP
CAST-IN-PLACE CONCRETE 03 30 00 - 1.3.E.
Material Certificates 4 15d
ANTP
22 NON-SHRINK GROUT 03 62 16 - 1.2.A.
Product Data 4 15d
ANTP
DIVISION 07 - THERMAL AND MOISTURE
PROTECTION
23 PRE-FORMED METAL SIDING 07 46 50 - 1.6.A.
Product Data 4 15d
ANTP
24 PRE-FORMED METAL SIDING 07 46 50 - 1.6.B.
Samples 4 15d
ANTP
25 JOINT SEALANTS 07 92 00 - 1.4.A. Product Data 4 15d
ANTP
NZAS 16-6001 Update Electrical Components at MAF's FA4626-17-R-0005
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
DATE CONTRACTOR NOTIFIED
APPROVED DIS-
APPROVED
L
IN
E N
U M
B E
R
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
L O
R S
E L
E C
T
IO
N
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
M A
N U
FA
C
T U
R E
R
R A
N T
Y
M A
N U
FA
C
T U
R E
C
O M
M E
N D
A T
IO
N
S
R E
Q U
IR
E
D S
U B
M
IS
SI
N T
R A
C T
O R
Number of Copies Required
O
PE
R A
T
R U
C T
IO
N
S
T E
ST
R
E
PO
R T
S
O T
H E
R
C A
T A
L O
G D
A T
A
REMARKS
D A
T E
R E
C E
IV
E
N
T R
A C
T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
SP
E
T
E
SU
B
M
IT
T A
L N
U M
B E
R S
FI
N
A L
A
PP
R O
V A
L
C O
N T
R A
C T
SU
B M
IT
T
26 JOINT SEALANTS 07 92 00 - 1.4.B. Samples 4 4 15d
DIVISION 9 – FINISHES
27 PAINTING 09 90 00 - 1.3.A. Product Data 4 15d
ANTP
28 PAINTING 09 90 00 - 1.3.B. Color and Texture Samples 4 4 15d
ANTP
DIVISION 26 - Electrical
29 GENERAL PROVISIONS FOR ELECTRICAL WORK
26 00 00 - 1.2.A. Qualifications 4 15d
ANTP
30 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS
AND CABLES 26 05 19 - 1.4.A. Qualifications 4 15d
ANTP
31 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS
AND CABLES 26 05 19 - 1.4.B. Quality control test reports 4 3d
ATT
32 GROUNDING AND BONDING FOR ELECTRICAL
SYSTEMS 26 05 26 - 1.3.A & B 4 4 15d
ANTP
33 GROUNDING AND BONDING FOR ELECTRICAL
SYSTEMS 26 05 26 - 1.3.C 4 3d
ATT
34 HANGERS AND SUPPORTS FOR ELECTRICAL
SYSTEMS 26 05 29 - 1.3. 4 15d
ANTP
35 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 33 - 1.3. 4 4 15d
ANTP
36 IDENTIFICATION FOR ELECTRICAL SYSTEMS 26 05 53 -
1.3. Product Data 4 15d
ANTP
37 PANELBOARDS 26 24 16 - 1.4.A Product Data 4 15d
NZAS 16-6001 Update Electrical Components at MAF's FA4626-17-R-0005
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
DATE CONTRACTOR NOTIFIED
APPROVED DIS-
APPROVED
L
IN
E N
U M
B E
R
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
L O
R S
E L
E C
T
IO
N
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
M A
N U
FA
C
T U
R E
R
R A
N T
Y
M A
N U
FA
C
T U
R E
C
O M
M E
N D
A T
IO
N
S
R E
Q U
IR
E
D S
U B
M
IS
SI
N T
R A
C T
O R
Number of Copies Required
O
PE
R A
T
R U
C T
IO
N
S
T E
ST
R
E
PO
R T
S
O T
H E
R
C A
T A
L O
G D
A T
A
REMARKS
D A
T E
R E
C E
IV
E
N
T R
A C
T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
SP
E
T
E
SU
B
M
IT
T A
L N
U M
B E
R S
FI
N
A L
A
PP
R O
V A
L
C O
N T
R A
C T
SU
B M
IT
T
38 PANELBOARDS 26 24 16 - 1.4.B. Shop Drawings 4 15d
39 PANELBOARDS 26 24 16 - 1.6 Maintenance Materials 2 30d PTPC 2 sets of spare keys
40 WIRING DEVICES 26 27 26 - 1.3 Product Data 4 15d
ANTP
41 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 26 28
16 - 1.3 Product Data 4 15d
ANTP
42 INTERIOR LIGHTING 26 51 00 - 1.3.A Shop Drawings 4 4 4 15d ANTP Design Data
43 INTERIOR LIGHTING 26 51 00 - 1.3.B Test Reports 4 15d
ANTP
44 INTERIOR LIGHTING 26 51 00 - 1.3.C Certificates 4 4 15d ANTP Certificate of useful life
45 INTERIOR LIGHTING 26 51 00 - 1.3.J Energy Efficiency 4 15d
ANTP
Lumen efficacy and color temperature
46 INTERIOR LIGHTING 26 51 00 - 1.4.A.1 Warranty 4 15d
ANTP
Written 10 year on-site replacement warranty
47 INTERIOR LIGHTING 26 51 00 - 1.4.A.2 Warranty period 4 10d AFI Warranty period signed certificate
48 EARTHWORK 31 20 00 - 1.4.A Material Sieve Analysis 4 15d
ANTP
Base and sub base material sieve analysis and proctor. Subgrade proctor.
49 EARTHWORK 31 20 00 - 1.4.B Test Results 4 5d ATT Compaction Test Results
50 EXCAVATION, TRENCHING AND BACKFILL 31 21 00 -
1.5.A Product Data 4 15d
ANTP
51 ASPHALTIC PAVEMENT REPLACEMENT 32 12 16 - 1.2
Materials 4 10d
PTSW
Sieve Analysis, Tack Coat, Mix Design
NZAS 16-6001 Update Electrical Components at MAF's FA4626-17-R-0005
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
DATE CONTRACTOR NOTIFIED
APPROVED DIS-
APPROVED
L
IN
E N
U M
B E
R
C E
R T
IF
IC
A T
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R A
W
IN
G S
SA
M
PL
E
S
C O
L O
R S
E L
E C
T
IO
N
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
M A
N U
FA
C
T U
R E
R
R A
N T
Y
M A
N U
FA
C
T U
R E
C
O M
M E
N D
A T
IO
N
S
R E
Q U
IR
E
D S
U B
M
IS
SI
N T
R A
C T
O R
Number of Copies Required
O
PE
R A
T
R U
C T
IO
N
S
T E
ST
R
E
PO
R T
S
O T
H E
R
C A
T A
L O
G D
A T
A
REMARKS
D A
T E
R E
C E
IV
E
N
T R
A C
T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
SP
E
T
E
SU
B
M
IT
T A
L N
U M
B E
R S
FI
N
A L
A
PP
R O
V A
L
C O
N T
R A
C T
SU
B M
IT
T
52 ASPHALTIC PAVEMENT REPLACEMENT 32 12 16 - 1.2
Testing 4 10d
PTSW Density Testing
D - Days PTSW - Prior to Start Work PTFI - Prior to Final Inspection AFI - After Final Inspection BBCW - Before Beginning Concrete Work PTPC - Prior to Project Completion ANTP - After Notice to Proceed BD - Before Delivery PT - Prior to Testing ATT - After Test is Taken PBC - Prior to Beginning Construction SRO - After Each Occurance
Sheet1
File details come from the government source that posted it. Updated .