Question_Set_3.pdf

PDF 60 KB Posted

Attached to
Updgrade MAF Electrical Components Updgrade MAF Electrical Components Federal contract opportunity
Solicitation number
FA4626-17-R-0005
Issued by
Department of the Air Force Global Strike Command

About this file

Question Set 3 - answer to type of conduit

View the file

Other files for this federal contract opportunity

Other files attached to Updgrade MAF Electrical Components Updgrade MAF Electrical Components, newest first.
File Type Posted
Photos_of_conduit_feeding_into_103_room.pdf PDF
Questions_and_answers-_Set_4.pdf PDF
Site_Visit_Minutes.pdf PDF
Question_Set_2_-_Elevator_Shaft_Lighting_-_ladder_alternative.pdf PDF
UPDATE_ELECTRICAL_COMPONENTS_AT_MAFS.pptx PPTX presentation
QUESTIONS_and_Answers_-_Set_1.pdf PDF
Solicitation_FA462617R0005.pdf PDF
Attach_1_Specifications.pdf PDF
Attach_2_Submittal_Schedule.pdf PDF
Attach_3_Schedule_of_Drawings.pdf PDF
Attch_9_Subcontractor_Consent.doc DOC document
Attach_6_Installation_Perimeter_Access.pdf PDF
Attch_8_Past_Performance_Questionaire.pdf PDF
Attach_7_Special_Contract_Requirements.pdf PDF
Attach_4_IFB_Drawings_no_Seal.pdf PDF
Attach_5_Wage_Determinations.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question – Set 3

1. Which MAFs would most likely need the conduit replaced, or if not known the one site requiring the wiring to be pulled?

The purpose of establishing Clin 0002 was based on the fact that too many physical unknowns of the condition of the buried 3 inch conduit of each MAF's conduit run from Pump House to Support Building. Thus, looking at past projects and a best guess estimate would put the number of damaged conduits up to 5 of 15 sites. We simply don't know of any site with a bad conduit until the wires are pull and examine at all 15 MAF sites. The most likely sites are Echo, Foxtrot, Golf and Hotel to re-pull the ground which will probably include all the wires.

However it is not know if any of the conduit needs replaced.

2. What type of conduit from pump-house to support building on CLIN 0002?

PVC coated rigid conduit is required as shown in the design to withstand crushing and to meet mission requirements respectively.

3. Is the well pump room considered a 100% wet or damp location?

The Pump House on each 15 MAF locations have water lines, water treatment chemicals and various liquid holding tanks. As a guidance for construction, the contractor should follow the drawings and specifications.