Attach 2 Material Submittal.xls

XLS spreadsheet 38 KB Posted

Attached to
Repair Windows Bldg 500 Federal contract opportunity
Solicitation number
FA4626-12-R-0007
Issued by
Department of the Air Force Global Strike Command

About this file

Attachment 2 Material Submittal

View the file

Other files for this federal contract opportunity

Other files attached to Repair Windows Bldg 500, newest first.
File Type Posted
Questions Answers v3.docx DOCX document
Amendment 0004.doc DOC document
089523-B500Drev15May.doc DOC document
084110-B500Drev15May.doc DOC document
088000-B500Drev15May.doc DOC document
084600-B500Drev15May.doc DOC document
083900-B500Drev 15May.doc DOC document
089523-B500D-26 April 2012.doc DOC document
Amendment 0003.doc DOC document
30April 2012- S103.pdf PDF
Amendment 0002.doc DOC document
Questions Answers v1.docx DOCX document
S100.pdf PDF
Amendment 0001.doc DOC document
Amendment 0001.doc DOC document
18 April 2012 089523-B500Drev.doc DOC document
Solicitation.doc DOC document
Attachment 8 Base Entry Letter.pdf PDF
Attch 7 - Subcontractor Consent Form - 10R0027.docx DOCX document
Attach 5 Wage Determination.docx DOCX document
Attach 4 Drawings.zip ZIP file
Attach 6 Past Performance Questionnaire.docx DOCX document
Attach 1 Specifications.zip ZIP file
Attach 3 Schedule of Drawings.doc DOC document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 09-1048REPAIR GLASS DOORS AND GLAZINGF4626-12-R-0007
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSTEST REPORTSOTHERREQUIRED SUBMISSION DATE (BY A/E)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1AS-BUILT FIELD DATA 010000-3.4.233 PTFI
2FINAL AS-BUILT RECORD DRAWINGS 01000-3.5.433 PTFP
3SHOP DRAWINGS 01000-3.1033 BMF
4NUCLEAR DENSOMETER DOCUMENTATION 01000-3.2133 PTFA
5OPERATION AND MAINTENANCE MANUAL 010000-3.6310 PTFA
6EQUIPMENT LIST 010000-3.7.1310 PTFA
7GUARANTEES 010000-3.7.2310 PTFA
8QUALITY CONTROL PLAN 010000-3.17.4314 PTSW
91354 PROPERTY INVENTORY CHECKLIST 010000-3.18315 ANT
10HAZARDOUS MATERIAL LIST 010000-3.22.3.1310 PTFA
11OZONE DEPLETING SUBSTANCES310 AFA
12CERTIFICATION OF TOXIC CHEMICAL RELEASE REPORTING310 AFA
13QUALITY CONTROL REPORT 010000 ATTACHMENT 1415 ANT
14RECYCLED MATERIAL USE REPORT 010000-ATTACHMENT 2310 PTFA
15WASTE MANAGEMENT PLAN 013600310 PTFA
16SOLID WASTE DISPOSAL RECORDS 013600-10.1.3320 ANTP
17SELECTIVE DEMOLITION 024119-1.43
18CATHODIC PROTECTION 026400 - 1.4333
19CAST IN PLACE CONCRETE 033000-1.333333
20COLD -FORMED METAL FRAMING 054000 - 1.33333Contractor to provide structural shoring plan as part of submittal
21HELICAL PIERS 056000 - 1.333333
22ROUGH CARPENTRY 061000-1.3.B3
23BUILDING INSULATION 072100 1.2333
24EPDM ROOFING - 075323 - 1.53333333
25SHEET METAL FLASHING AND TRIM - 076200 - 1.4333
26JOINT SEALANTS 079200 - 1.33333
27AUTOMATIC ENTRANCE DOORS 08460033333
28BLAST RESIST. ALUM. DOOR 083900 - 1.233333
29SECURITY ALUMINUM WINDOWS 084110 - 1.433333
30FIBERGLASS SANDWICH PNLS 089523 - 1.533333333
31GYPSUM BOARD ASSEMBLIES 092900 - 1.433
32TILE - 093000 - 1.53333
33ACOUSTICAL PANEL CEILINGS 095110 - 1.2333
34PAINTING 099000 - 1.3333
Schedule of Abbreviations
AWC= After Work CompletedBMF=Before Material Delivery
PTSW= Prior to Starting WorkSN=Advance Notification
AFA= After Final AcceptanceSRO=After Each Occurrence
PTO= Prior to OutagePTFI=Prior to Final Inspection
PTNT= Prior to Notice to ProceedPTFP=Prior to Final Payment
ANTP= After Notice to ProceedPTCW=Prior to Completing Work
EWD= Each work day AF Form 3000 not requiredAFI=After Final Inspection
PTFA= Prior to Final AcceptancePT=Prior To
ACA= After Contract Award

&L&"Times New Roman,Regular"&12Attachment 2&R&"Times New Roman,Regular"&12F24604xx Rxxx &L&"Times New Roman,Regular"&12AF Form 66