Solicitation.doc
DOC document 477 KB Posted
- Attached to
- Horizontal Boring and RipRap Federal contract opportunity
- Solicitation number
- FA4626-12-R-0005
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12-R-0005-0002.pdf | ||
| 02200 Misile Conduit Erosion Repair 2.doc | DOC document | |
| Attach_2_Submittal_Schedule(1).xls | XLS spreadsheet | |
| Amendment 001.doc | DOC document | |
| Attendees.pdf | ||
| Attach 4 Base Entry Policy.pdf | ||
| Attach 2 Submittal Schedule.xls | XLS spreadsheet | |
| attach 1 specifications.zip | ZIP file | |
| Attach 3 Other Counties Wage Determination.docx | DOCX document | |
| Attach 3 Cascade Wage Determination.docx | DOCX document | |
| Attach 3 Lewis and Clark Wage determination.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
Cable Erosion/Conduit Repair
FFP
The prices provided for CLINS 0001AA thru 0001BA will be the prices used for any sites, mobilization, and bonding for the calendar year 2012. Sites to be identified per Delivery Order. See Section B for bid schedule.
FOB: Destination
PURCHASE REQUEST NUMBER: F2W2C51252A002
SIGNAL CODE: A
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Cable Erosion/Conduit Repair |
FFP
The prices provided for CLINS 1001AA thru 1001BA will be the prices used for any sites, mobilization, and bonding for the calendar year 2013. Sites to be identified per Delivery Order. See Section B for bid schedule.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Cable Erosion/Conduit Repair |
FFP
The prices provided for CLINS 2001AA thru 2001BA will be the prices used for any sites, mobilization, and bonding for the calendar year 2014. Sites to be identified per Delivery Order. See Section B for bid schedule.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Cable Erosion/Conduit Repair |
FFP
The prices provided for CLINS 3001AA thru 3001BA will be the prices used for any sites, mobilization, and bonding for the calendar year 2015. Sites to be identified per Delivery Order. See Section B for bid schedule.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
| OPTION |
| Cable Erosion/Conduit Repair |
FFP
The prices provided for CLINS 4001AA thru 4001BA will be the prices used for any sites, mobilization, and bonding for the calendar year 2016. Sites to be identified per Delivery Order. See Section B for bid schedule.
NET AMT
BID SCHEDULE
Section B - Supplies or Services and Prices
SECTION B CONTINUATION SHEET
BASE YEAR
ITEM
0001 AA. Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Mobilization." The Government will exercise every effort to keep the mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Mobilization shall be paid as Each (EA).
UNIT
EXTENDED
PRICE
EST QTY
Mobilization
Each
0001 AB. 4” Conduit. Includes the purchase and delivery of a 4” SDR 11 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Install Fused/Continuous
LF
Length HDPE
0001 AC. 4” Conduit over 500 Feet. Includes the purchase and delivery of a 4” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Estimated 500-1000 LF per Site.
EST QTY
PRICE
Install Fused/Continuous
LF
0001 AD. 6” Conduit. Includes the purchase and delivery of a 6” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 6” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Install Fused/Continuous
LF
0001 AE. Directional Bore Clay 4” conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Clay 4”
LF
0001 AF. Directional Bore Clay 6”conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 6”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Clay 6”
LF
0001 AG. Directional Bore Clay 4”Conduit over 500 feet Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Clay 4”
LF
0001 AH. Directional Bore Cobble 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Cobble 4”
LF
0001 AJ. Directional Bore Cobble 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 6”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Cobble 6”
LF
0001 AK. Directional Bore Cobble 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Cobble 6”
LF
0001 AL. Directional Bore Rock 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone.Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Rock
LF
0001 AM. Directional Bore Rock 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 6”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Rock
LF
0001 AN. Directional Bore Rock 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Rock 4”
LF
0001 AP. Directional Bore Shale 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Shale 4”
LF
0001 AQ. Directional Bore Shale 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500-1000 LF per site.
EST QTY
PRICE
Directional Bore Shale 4”
LF
0001 AR. Directional Bore Shale 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 6”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Shale 6”
LF
0001 AS. Major Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include major rip rap. Major rip rap rock will be a minimum size of 36-42 inch. Not to exceed 900 cubic yards per site.
EST QTY
Major Rock
CY
0001 AT. Medium Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include medium rip rap. Medium rip rap rock will be a minimum size of 24-36 inch. Not to exceed 800 cubic yards per site.
EST QTY
Medium Rock
0001 AU. Small Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, and stockpile, excavate, haul, fill, grade and compact all materials to include small rip rap. Small rip rap rock will be a minimum size of 6-24 inch. Not to exceed 800 cubic yards per site.
EST QTY
Small Rock
0001 AV. Fill Dirt Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include fill dirt and water needed for compaction. This item also includes placing fill dirt around cable and bringing area back to original grade as much as possible. Fill dirt is with rock less than 2 inches in diameter. Not to exceed 500 cubic yards per site.
EST QTY
Fill Dirt
0001 AW. Top Soil Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil and water needed for compaction. This item also includes placing top soil over erosion area. Not to exceed 300 cubic yards per site.
EST QTY
Top Soil Dirt
0001 AX. Erosion Repair under 50 CY Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area under 50 cubic yards will be paid by site. This item will be paid by site.
EST QTY
Erosion Repair
Site
0001 AY. Erosion Repair Over 50 Cubic Yards Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area over 50 cubic yards will be paid by cubic yards (CY).
EST QTY
0001 AZ. Straw Wattle Includes all work, equipment, and materials necessary to deliver and install a wattle to prevent future erosion of the HICS Right of Way. Installation of a Straw wattle will be performed using best standard practices. This item paid per EA.
EST QTY
Wattle
EA
0001 BA. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
EST QTY
Bonding
Lump Sum
Estimated Total CLINS 0001 AA- 0001BA ______________
OPTION YEAR 1
1001 AA. Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Mobilization." The Government will exercise every effort to keep the mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Mobilization shall be paid as Each (EA).
EST QTY
1001 AB. 4” Conduit. Includes the purchase and delivery of a 4” SDR 11 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per Site.
EST QTY
PRICE
Install Fused/Continuous
LF
1001 AC. 4” Conduit over 500 Feet. Includes the purchase and delivery of a 4” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Estimated 500-1000 LF per Site.
EST QTY
PRICE
Install Fused/Continuous
LF
1001 AD. 6” Conduit. Includes the purchase and delivery of a 6” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 6” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF site.
EST QTY
PRICE
Install Fused/Continuous
LF
1001 AE. Directional Bore Clay 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Clay 4”
LF
1001 AF. Directional Bore Clay 6”Conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 6”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Clay 6”
LF
1001 AG. Directional Bore Clay 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Clay 4”
LF
1001 AH. Directional Bore Cobble 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Cobble 4”
LF
1001 AJ. Directional Bore Cobble 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 6”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Cobble 6”
LF
1001 AK. Directional Bore Cobble 4”Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Cobble 6”
LF
1001 AL. Directional Bore Rock 4”Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Rock
LF
1001 AM. Directional Bore Rock 6”Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 6”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Rock
LF
1001 AN. Directional Bore Rock 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Estiamted 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Rock 4”
LF
1001 AP. Directional Bore Shale 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Shale 4”
LF
1001 AQ. Directional Bore Shale 4”Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Shale 4”
LF
1001 AR. Directional Bore Shale 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 6”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Shale 6”
LF
1001 AS. Major Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include major rip rap. Major rip rap rock will be a minimum size of 36-42 inch. Not to exceed 900 cubic yards per site.
EST QTY
1001 AT. Medium Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include medium rip rap. Medium rip rap rock will be a minimum size of 24-36 inch. Not to exceed 800 cubic yards per site.
EST QTY
1001 AU. Small Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, and stockpile, excavate, haul, fill, grade and compact all materials to include small rip rap this item. Small rip rap rock will be a minimum size of 6-24 inch. Not to exceed 800 cubic yards per site.
EST QTY
1001 AV. Fill Dirt Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include fill dirt, this item also includes water needed for compaction. This is item also includes placing fill dirt around cable and bringing area back to original grade as much as possible. Fill dirt is with rock less than 2 inches in diameter. Not to exceed 500 cubic yards per site.
EST QTY
1001 AW. Top Soil Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, this item also includes water needed for compaction. This item also includes placing top soil over erosion area. Not to exceed 300 cubic yards per site.
EST QTY
1001 AX. Erosion Repair under 50 CY Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, and rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area under 50 cubic yards will be paid by site. This item will be paid by site.
EST QTY
1001 AY. Erosion Repair Over 50 Cubic Yards Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area over 50 cubic yards will be paid by cubic yards (CY).
EST QTY
1001 AZ. Straw Wattle Includes all work, equipment, and materials necessary to deliver and install a wattle to prevent future erosion of the HICS Right of Way. Installation of a Straw wattle will be performed using best standard practices. This item paid per EA.
EST QTY
1001 BA. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
EST QTY
Estimated Total CLINS 1001 AA- 1001BA ______________
OPTION YEAR 2
2001 AA. Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Mobilization." The Government will exercise every effort to keep the mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Mobilization shall be paid as Each (EA).
EST QTY
2001 AB. 4” Conduit. Includes the purchase and delivery of a 4” SDR 11 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per Site.
EST QTY
PRICE
Install Fused/Continuous
LF
2001 AC. 4” Conduit over 500 Feet. Includes the purchase and delivery of a 4” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Estimated 500-1000 LF per Site.
EST QTY
PRICE
Install Fused/Continuous
LF
2001 AD. 6” Conduit. Includes the purchase and delivery of a 6” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 6” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Install Fused/Continuous
LF
2001 AE. Directional Bore Clay 4”Conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Clay 4”
LF
2001 AF. Directional Bore Clay 6”Conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 6”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Clay 6”
LF
2001 AG. Directional Bore Clay 4”Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Clay 4”
LF
2001 AH. Directional Bore Cobble 4”Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Cobble 4”
LF
2001 AJ. Directional Bore Cobble 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 6”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Cobble 6”
LF
2001 AK. Directional Bore Cobble 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Cobble 6”
LF
2001 AL. Directional Bore Rock 4” Conduti Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Rock
LF
2001 AM. Directional Bore Rock 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 6”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Rock
LF
2001 AN. Directional Bore Rock 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Rock 4”
LF
2001 AP. Directional Bore Shale 4”Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Shale 4”
LF
2001 AQ. Directional Bore Shale 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Shale 4”
LF
2001 AR. Directional Bore Shale 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 6”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Shale 6”
LF
2001 AS. Major Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include major rip rap. Major rip rap rock will be a minimum size of 36-42 inch. Not to exceed 900 cubic yards per site.
EST QTY
2001 AT. Medium Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include medium rip rap. Medium rip rap rock will be a minimum size of 24-36 inch. Not to exceed 800 cubic yards per site.
EST QTY
2001 AU. Small Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, and stockpile, excavate, haul, fill, grade and compact all materials to include small rip rap. Small rip rap rock will be a minimum size of 6-24 inch. Not to exceed 800 cubic yards per site.
EST QTY
2001 AV. Fill Dirt Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include fill dirt this item also includes water needed for compaction. This is item also includes placing fill dirt around cable and bringing area back to original grade as much as possible. Fill dirt is with rock less than 2 inches in diameter. Not to exceed 500 cubic yards per site.
EST QTY
2001 AW. Top Soil Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, this item also includes water needed for compaction. This item also includes placing top soil over erosion area. Not to exceed 300 cubic yards per site.
EST QTY
2001 AX. Erosion Repair under 50 CY Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction, this item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area under 50 cubic yards will be paid by site. This item will be paid by site.
EST QTY
2001 AY. Erosion Repair Over 50 Cubic Yards Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap and water for compaction, this item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area over 50 cubic yards will be paid by cubic yards (CY).
EST QTY
2001 AZ. Straw Wattle Includes all work, equipment, and materials necessary to deliver and install a wattle to prevent future erosion of the HICS Right of Way. Installation of a Straw wattle will be performed using best standard practices. This item paid per EA.
EST QTY
2001 BA. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
EST QTY
Estimated Total CLINS 2001 AA- 2001BA ______________
OPTION YEAR 3
3001 AA. Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Mobilization." The Government will exercise every effort to keep the mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Mobilization shall be paid as Each (EA).
EST QTY
3001 AB. 4” Conduit. Includes the purchase and delivery of a 4” SDR 11 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per Site.
EST QTY
PRICE
Install Fused/Continuous
LF
3001 AC 4” Conduit over 500 Feet. Includes the purchase and delivery of a 4” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Estimated 500-1000 LF per Site.
EST QTY
PRICE
Install Fused/Continuous
LF
3001 AD. 6” conduit. Includes the purchase and delivery of a 6” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 6” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Install Fused/Continuous
LF
3001 AE. Directional Bore Clay 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Clay 4”
LF
3001 AF. Directional Bore Clay 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 6”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Clay 6”
LF
3001 AG. Directional Bore Clay 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Clay 4”
LF
3001 AH. Directional Bore Cobble 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Cobble 4”
LF
3001 AJ. Directional Bore Cobble 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 6”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Cobble 6”
LF
3001 AK. Directional Bore Cobble 4”Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Cobble 6”
LF
3001 AL. Directional Bore Rock 4”Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Rock
LF
3001 AM. Directional Bore Rock 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 6”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Rock
LF
3001 AN. Directional Bore Rock 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Rock 4”
LF
3001 AP. Directional Bore Shale 4”Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Shale 4”
LF
3001 AQ. Directional Bore Shale 4”Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Shale 4”
LF
3001 AR. Directional Bore Shale 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 6”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Shale 6”
LF
3001 AS. Major Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include major rip rap. Major rip rap rock will be a minimum size of 36-42 inch. Not to exceed 900 cubic yards per site.
EST QTY
3001 AT. Medium Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include medium rip rap. Medium rip rap rock will be a minimum size of 24-36 inch. Not to exceed 800 cubic yards per site.
EST QTY
3001 AU. Small Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, and stockpile, excavate, haul, fill, grade and compact all materials to include small rip rap. Small rip rap rock will be a minimum size of 6-24 inch. Not to exceed 800 cubic yards per site.
EST QTY
3001 AV. Fill Dirt Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include fill dirt, this item also includes water needed for compaction. This is item also includes placing fill dirt around cable and bringing area back to original grade as much as possible. Fill dirt is with rock less than 2 inches in diameter. Not to exceed 500 cubic yards per site.
EST QTY
3001 AW. Top Soil Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, this item also includes water needed for compaction. This item also includes placing top soil over erosion area. Not to exceed 300 cubic yards per site.
EST QTY
3001 AX. Erosion Repair under 50 CY Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area under 50 cubic yards will be paid by site. This item will be paid by site.
EST QTY
3001 AY. Erosion Repair Over 50 Cubic Yards Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area over 50 cubic yards will be paid by cubic yards (CY).
EST QTY
3001 AZ. Straw Wattle Includes all work, equipment, and materials necessary to deliver and install a wattle to prevent future erosion of the HICS Right of Way. Installation of a Straw wattle will be performed using best standard practices. This item paid per EA.
EST QTY
3001 BA. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
EST QTY
Estimated Total CLINS 3001 AA- 3001BA ______________
OPTION YEAR 4
4001 AA. Mobilization. All costs related to general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Mobilization." The Government will exercise every effort to keep the mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Mobilization shall be paid as Each (EA).
EST QTY
4001 AB. 4” conduit. Includes the purchase and delivery of a 4” SDR 11 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per Site.
EST QTY
PRICE
Install Fused/Continuous
LF
4001 AC. 4” Conduit over 500 Feet. Includes the purchase and delivery of a 4” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Estimated 500-1000 LF per Site.
EST QTY
PRICE
Install Fused/Continuous
LF
4001 AD. 6” Conduit. Includes the purchase and delivery of a 6” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 6” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Install Fused/Continuous
LF
4001 AE. Directional Bore Clay 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Clay 4”
LF
4001 AF. Directional Bore Clay 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 6”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Clay 6”
LF
4001 AG Directional Bore Clay 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Clay 4”
LF
4001 AH. Directional Bore Cobble 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Cobble 4”
LF
4001 AJ. Directional Bore Cobble 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 6”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Cobble 6”
LF
4001 AK. Directional Bore Cobble 4”Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Cobble 6”
LF
4001 AL. Directional Bore Rock 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Rock
LF
4001 AM. Directional Bore Rock 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 6”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Rock
LF
4001 AN. Directional Bore Rock 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Rock 4”
LF
4001 AP. Directional Bore Shale 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Shale 4”
LF
4001 AQ. Directional Bore Shale 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). 500-1,000 LF per site.
EST QTY
PRICE
Directional Bore Shale 4”
LF
4001 AR. Directional Bore Shale 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 6”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
EST QTY
PRICE
Directional Bore Shale 6”
LF
4001 AS. Major Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include major rip rap. Major rip rap rock will be a minimum size of 36-42 inch. Not to exceed 900 cubic yards per site.
EST QTY
4001 AT. Medium Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include medium rip rap. Medium rip rap rock will be a minimum size of 24-36 inch. Not to exceed 800 cubic yards per site.
EST QTY
4001 AU. Small Rock Rip Rap Includes all work, equipment, and materials necessary to deliver, and stockpile, excavate, haul, fill, grade and compact all materials to include small rip rap. Small rip rap rock will be a minimum size of 6-24 inch. Not to exceed 800 cubic yards per site.
EST QTY
4001 AV. Fill Dirt Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include fill dirt this item also includes water needed for compaction. This is item also includes placing fill dirt around cable and bringing area back to original grade as much as possible. Fill dirt is with rock less than 2 inches in diameter. Not to exceed 500 cubic yards per site.
EST QTY
4001 AW. Top Soil Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, this item also includes water needed for compaction. This item also includes placing top soil over erosion area. Not to exceed 300 cubic yards per site.
EST QTY
4001 AX. Erosion Repair under 50 CY Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill,…