Attach_2_Submittal_Schedule(1).xls

XLS spreadsheet 35 KB Posted

Attached to
Horizontal Boring and RipRap Federal contract opportunity
Solicitation number
FA4626-12-R-0005
Issued by
Department of the Air Force Global Strike Command

About this file

Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Horizontal Boring and RipRap, newest first.
File Type Posted
12-R-0005-0002.pdf PDF
02200 Misile Conduit Erosion Repair 2.doc DOC document
Amendment 001.doc DOC document
Attendees.pdf PDF
Attach 4 Base Entry Policy.pdf PDF
Solicitation.doc DOC document
Attach 3 Cascade Wage Determination.docx DOCX document
Attach 3 Lewis and Clark Wage determination.docx DOCX document
Attach 2 Submittal Schedule.xls XLS spreadsheet
attach 1 specifications.zip ZIP file
Attach 3 Other Counties Wage Determination.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
CAO 12-1001Cable Missle Conduit Erosion Repair
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSOTHERREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
101000-14 3.13.B Quality Control Plan410 CD ANP
201000-8 3.21.A Utility Locates (811)410 CD PSW
301001-1 3.24.A.5 Contractor onsite safety and health plan4430CD PSW
401050-1 1.1.B. Site Layout Field Notes45 WD AFI
501360-7 3.5.1. Class II ODC Written Request4410 D PSW
601360-7 7.1.2. AF Form 3952 Chem/Haz Material Request410 D PBC
701360-7 8.0. EPRCA Section 313 Form R410 D AFA
801360-11 11.6. Attachment 1. Waste Management Plan410 D PSW
901360-11 11.6. Attachment 2. Recovered Material Written Determination Form410 D AFA
1001360-11 11.6. Attachment 3. Recycled Material Use Report410 D AFA
1101360-11 11.6. Attachment 4. Monthly Solid Waste Disposal Diversion and Disposal410 D EOM
1201360-11 12.1, Affirmative Procurement410 D PSW
D - DaysCD - Calendar DaysPBC - Prior to Beginning Construction
AFA- After Final AcceptanceEOM - End Of MonthPFI - Prior to Final Inspection
AFI - After Final InspectionPSW - Prior to Start WorkPPC - Prior to Project Completion
ANP - After Notice to ProceedBBCW - Before Beginning Concrete WorkPT - Prior to Testing
ATT - After Test is TakenBD - Before DeliveryWD- Working Days
1302200-2.2A.1 Class III Rip Rap410 D PSW
1402200-2 2A.2 Class II Rip Rap410 D PSW
1502200-2 2A.3 Class I Rip Rap410 D PSW
1602200-2 2A.4 Fill Dirt410 D PSW
1702200-2 2A.5 Top Soil410 D PSW
1802200-3 2B.1.a.i SDR 11 HDPE Conduit410 D EOM
1902200-3 2B.1.a.ii SDR 9 HDPE Conduit410 D PSW
2002200-3 2C Straw Wattles410 D PSW
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

&L&"Times New Roman,Regular"&12Attachment 2&R&"Times New Roman,Regular"&12FA4626-11-R-0001 &L&"Times New Roman,Regular"&12AF Form 66

02: 000510_AC01_00_90-

&F-&D&C&"Times New Roman,Regular"&12SS-&P of &N Change from Large Rock to Class III Changed from Medium rock to Class II Changed from Small rock to read Class I

File details come from the government source that posted it. Updated .