12-R-0005-0002.pdf
PDF 173 KB Posted
- Attached to
- Horizontal Boring and RipRap Federal contract opportunity
- Solicitation number
- FA4626-12-R-0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 02200 Misile Conduit Erosion Repair 2.doc | DOC document | |
| Attach_2_Submittal_Schedule(1).xls | XLS spreadsheet | |
| Amendment 001.doc | DOC document | |
| Attendees.pdf | ||
| Attach 4 Base Entry Policy.pdf | ||
| Attach 2 Submittal Schedule.xls | XLS spreadsheet | |
| attach 1 specifications.zip | ZIP file | |
| Solicitation.doc | DOC document | |
| Attach 3 Cascade Wage Determination.docx | DOCX document | |
| Attach 3 Lewis and Clark Wage determination.docx | DOCX document | |
| Attach 3 Other Counties Wage Determination.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F2W2C51252A002 CAO 12-1001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to replace the specif ication, submital schedule, and bid schedule to reflect the addition of three new CLINS and change in rip rap classif ication.
A. Replace Section J Attach 1, Technical Specif ications Section 02200 B. Replace Section B, Bid Schedule C. Replace the Submittal Schedule D. The proposal closing date of 27 July 2012 remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 32
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jul-2012
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4626-12-R-0005
X 9B. DATED (SEE ITEM 11)
01-May-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jul-2012
CODE
FA4626 341ST CONTRACTING SQUADRON
7015 GODDARD DRIVE BLDG 145
MALMSTROM AFB MT 59402-6863
FA4626 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4626-12-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
Global Changes
CLIN 0001 -- CLIN 4001
The CLIN extended description has changed from The prices provided for CLINS 0001AA thru 0001BA will be the prices used for any sites, mobilization, and bonding for the calendar year 2012. Sites to be identified per Delivery Order. See Section B for bid schedule. to The prices provided for CLINS 0001AA thru 0001BC will be the prices used for any sites, mobilization, and bonding for the calendar year 2012. Sites to be identified per Delivery Order. See Section B for bid schedule..
The following have been modified:
BID SCHEDULE
Section B - Supplies or Services and Prices
SECTION B CONTINUATION SHEET
BASE YEAR
ITEM
0001 AA. Bore Rig Mobilization. This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Horizontal Directional Drilling (HDD). These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Bore Rig Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for " Bore Rig Mobilization." The Government will exercise every effort to keep the Bore Rig mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Bore Rig Mobilization shall be paid as Each (EA).
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Bore Rig Mobilization Each _________ 1 ___________
0001 AB. Erosion Control Mobilization. This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Erosion Control measures as outlined in the this project. These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Erosion Control Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Erosion Control Mobilization." The Government will exercise every effort to keep the Erosion Control mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Erosion Control Mobilization shall be paid as Each (EA).
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Erosion Control Mobilization Each _________ 1 ___________
0001 AC. 4” Conduit. Includes the purchase and delivery of a 4” SDR 11 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Install Fused/Continuous LF __________ 1 _________ Length HDPE
0001 AD. 4” Conduit over 500 Feet. Includes the purchase and delivery of a 4” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Estimated 500-1000 LF per Site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Install Fused/Continuous LF __________ 1 __ ________ Length HDPE
0001 AE. 6” Conduit. Includes the purchase and delivery of a 6” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 6” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Install Fused/Continuous LF _________ 1 __ ________
0001 AF. Directional Bore Clay 4” conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry.
Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
Directional Bore Clay 4” LF _ ________ 1 _________
0001 AG. Directional Bore Clay 6”conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 6”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry.
Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
Directional Bore Clay 6” LF __________ 1 _________
0001 AH. Directional Bore Clay 4”Conduit over 500 feet Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
UNIT UNIT EXTENDED
Directional Bore Clay 4” LF ________ 1 __________
0001 AJ. Directional Bore Cobble 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches.
Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
Directional Bore Cobble 4” LF __________ 1 __________
0001 AK. Directional Bore Cobble 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 6”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches.
Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
Directional Bore Cobble 6” LF __________ 1 __________
0001 AL. Directional Bore Cobble 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
UNIT UNIT EXTENDED
Directional Bore Cobble 6” LF __________ 1 _________
0001 AM. Directional Bore Rock 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone.Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
Directional Bore Rock LF _________ 1 _________
0001 AN. Directional Bore Rock 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 6”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
Directional Bore Rock LF __________ 1 ____________
0001 AP. Directional Bore Rock 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
UNIT UNIT EXTENDED
Directional Bore Rock 4” LF ________ 1 _________
0001 AQ. Directional Bore Shale 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF).
Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
Directional Bore Shale 4” LF __________ 1 __________
0001 AR. Directional Bore Shale 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500-1000 LF per site.
UNIT UNIT EXTENDED
0001 AS. Directional Bore Shale 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 6”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF).
Not to exceed 500 LF per site.
Directional Bore Shale 6” LF __________ 1 ___________
0001 AT. Class III Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include Class III rip rap. Class III rip rap rock will be a minimum size of
9.24 – 33.84 inch. Not to exceed 900 cubic yards per site.
UNIT UNIT EXTENDED
Class III Rock CY ________ 1 _________
0001 AU. Class II Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include class II rip rap. Class II rip rap rock will be a minimum size of
7.32 - 24 inch. Not to exceed 800 cubic yards per site.
UNIT UNIT EXTENDED
Class II Rock CY ________ 1 __________
0001 AV. Class I Rip Rap Includes all work, equipment, and materials necessary to deliver, and stockpile, excavate, haul, fill, grade and compact all materials to include Class I rip rap. Class I rip rap rock will be a minimum size of 3.24
– 12.6 inch. Not to exceed 800 cubic yards per site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Class I Rock CY ________ 1 __________
0001 AW. Rip Rap Hauling Includes all labor, equipment, and materials necessary to transport/haul Class I, II, III rip rap from the approved quarry to the Erosion Control work location. Rip Rap Hauling will be paid by the Ton/Mile measured from the Malmstrom AFB, MT to the work Location.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Rip Rap Hauling Ton/Mile ________ 1 _________
0001 AX. Fill Dirt Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include fill dirt and water needed for compaction. This item also includes placing fill dirt around cable and bringing area back to original grade as much as possible. Fill dirt is with rock less than 2 inches in diameter. Not to exceed 500 cubic yards per site.
Fill Dirt CY ________ 1 _________
0001 AY. Top Soil Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil and water needed for compaction. This item also includes placing top soil over erosion area. Not to exceed 300 cubic yards per site.
Top Soil Dirt CY ________ 1 __________
0001 AZ. Erosion Repair under 50 CY Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area under 50 cubic yards will be paid by site. This item will be paid by site.
Erosion Repair Site _______ 1 _________
0001 BA. Erosion Repair Over 50 Cubic Yards Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area over 50 cubic yards will be paid by cubic yards (CY).
Erosion Repair CY __________ 1 ____________
0001 BB. Straw Wattle Includes all work, equipment, and materials necessary to deliver and install a wattle to prevent future erosion of the HICS Right of Way. Installation of a Straw wattle will be performed using best standard practices. This item paid per EA.
Wattle EA ________ 1 ____________
0001 BC. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
Bonding Lump Sum _______ 1 ____________
Estimated Total CLINS 0001 AA- 0001BC ______________
ITEM
1001 AA. Bore Rig Mobilization. This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Horizontal Directional Drilling (HDD). These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Bore Rig Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for " Bore Rig Mobilization." The Government will exercise every effort to keep the Bore Rig mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Mobilization shall be paid as Each (EA).
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
1001 AB. Erosion Control Mobilization. This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Erosion Control measures as outlined in the this project. These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Erosion Control Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Erosion Control Mobilization." The Government will exercise every effort to keep the Erosion Control mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Mobilization shall be paid as Each (EA).
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Erosion Control Mobilization Each _________ 1 ___________
1001 AC. 4” Conduit. Includes the purchase and delivery of a 4” SDR 11 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
Install Fused/Continuous LF __________ 1 _________
OPTION
YEAR 1
1001 AD. 4” Conduit over 500 Feet. Includes the purchase and delivery of a 4” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Estimated 500-1000 LF per Site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
1001 AE. 6” Conduit. Includes the purchase and delivery of a 6” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 6” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
1001 AF. Directional Bore Clay 4” conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry.
Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
1001 AG. Directional Bore Clay 6”conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 6”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry.
Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
1001 AH. Directional Bore Clay 4”Conduit over 500 feet Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
1001 AJ. Directional Bore Cobble 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches.
Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
1001 AK. Directional Bore Cobble 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 6”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches.
Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
1001 AL. Directional Bore Cobble 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
UNIT UNIT EXTENDED
1001 AM. Directional Bore Rock 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone.Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
1001 AN. Directional Bore Rock 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 6”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
1001 AP. Directional Bore Rock 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
UNIT UNIT EXTENDED
1001 AQ. Directional Bore Shale 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF).
Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
1001 AR. Directional Bore Shale 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500-1000 LF per site.
UNIT UNIT EXTENDED
1001 AS. Directional Bore Shale 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 6”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF).
Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
1001 AT. Class III Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include Class III rip rap. Class III rip rap rock will be a minimum size of
9.24 – 33.84 inch. Not to exceed 900 cubic yards per site.
1001 AU. Class II Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include class II rip rap. Class II rip rap rock will be a minimum size of
7.32 - 24 inch. Not to exceed 800 cubic yards per site.
UNIT UNIT EXTENDED
1001 AV. Class I Rip Rap Includes all work, equipment, and materials necessary to deliver, and stockpile, excavate, haul, fill, grade and compact all materials to include Class I rip rap. Class I rip rap rock will be a minimum size of 3.24
– 12.6 inch. Not to exceed 800 cubic yards per site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Class I Rock CY ________ 1 __________
1001 AW. Rip Rap Hauling Includes all labor, equipment, and materials necessary to transport/haul Class I, II, III rip rap from the approved quarry to the Erosion Control work location. Rip Rap Hauling will be paid by the Ton/Mile measured from the Malmstrom AFB, MT to the work Location.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Rip Rap Hauling Ton/Mile ________ 1 _________
1001 AX. Fill Dirt Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include fill dirt and water needed for compaction. This item also includes placing fill dirt around cable and bringing area back to original grade as much as possible. Fill dirt is with rock less than 2 inches in diameter. Not to exceed 500 cubic yards per site.
1001 AY. Top Soil Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil and water needed for compaction. This item also includes placing top soil over erosion area. Not to exceed 300 cubic yards per site.
1001 AZ. Erosion Repair under 50 CY Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area under 50 cubic yards will be paid by site. This item will be paid by site.
1001 BA. Erosion Repair Over 50 Cubic Yards Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area over 50 cubic yards will be paid by cubic yards (CY).
1001 BB. Straw Wattle Includes all work, equipment, and materials necessary to deliver and install a wattle to prevent future erosion of the HICS Right of Way. Installation of a Straw wattle will be performed using best standard practices. This item paid per EA.
1001 BC. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
Estimated Total CLINS 1001 AA- 1001BC ______________
OPTION YEAR 2
2001 AA. Bore Rig Mobilization. This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Horizontal Directional Drilling (HDD). These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Bore Rig Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for " Bore Rig Mobilization." The Government will exercise every effort to keep the Bore Rig mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Mobilization shall be paid as Each (EA).
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
2001 AB. Erosion Control Mobilization. This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Erosion Control measures as outlined in the this project. These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Erosion Control Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Erosion Control Mobilization." The Government will exercise every effort to keep the Erosion Control mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Mobilization shall be paid as Each (EA).
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Erosion Control Mobilization Each _________ 1 ___________
2001 AC. 4” Conduit. Includes the purchase and delivery of a 4” SDR 11 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
2001 AD. 4” Conduit over 500 Feet. Includes the purchase and delivery of a 4” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Estimated 500-1000 LF per Site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
2001 AE. 6” Conduit. Includes the purchase and delivery of a 6” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 6” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
2001 AF. Directional Bore Clay 4” conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry.
Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
2001 AG. Directional Bore Clay 6”conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 6”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry.
Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
2001 AH. Directional Bore Clay 4”Conduit over 500 feet Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
UNIT UNIT EXTENDED
2001 AJ. Directional Bore Cobble 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches.
Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
2001 AK. Directional Bore Cobble 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 6”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches.
Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
2001 AL. Directional Bore Cobble 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
UNIT UNIT EXTENDED
2001 AM. Directional Bore Rock 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone.Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
2001 AN. Directional Bore Rock 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 6”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
2001 AP. Directional Bore Rock 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
UNIT UNIT EXTENDED
2001 AQ. Directional Bore Shale 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF).
Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
2001 AR. Directional Bore Shale 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500-1000 LF per site.
UNIT UNIT EXTENDED
2001 AS. Directional Bore Shale 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 6”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF).
Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
2001 AT. Class III Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include Class III rip rap. Class III rip rap rock will be a minimum size of
9.24 – 33.84 inch. Not to exceed 900 cubic yards per site.
2001 AU. Class II Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include class II rip rap. Class II rip rap rock will be a minimum size of
7.32 - 24 inch. Not to exceed 800 cubic yards per site.
UNIT UNIT EXTENDED
2001 AV. Class I Rip Rap Includes all work, equipment, and materials necessary to deliver, and stockpile, excavate, haul, fill, grade and compact all materials to include Class I rip rap. Class I rip rap rock will be a minimum size of 3.24
– 12.6 inch. Not to exceed 800 cubic yards per site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Class I Rock CY ________ 1 __________
2001 AW. Rip Rap Hauling Includes all labor, equipment, and materials necessary to transport/haul Class I, II, III rip rap from the approved quarry to the Erosion Control work location. Rip Rap Hauling will be paid by the Ton/Mile measured from the Malmstrom AFB, MT to the work Location.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Rip Rap Hauling Ton/Mile ________ 1 _________
2001 AX. Fill Dirt Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include fill dirt and water needed for compaction. This item also includes placing fill dirt around cable and bringing area back to original grade as much as possible. Fill dirt is with rock less than 2 inches in diameter. Not to exceed 500 cubic yards per site.
2001 AY. Top Soil Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil and water needed for compaction. This item also includes placing top soil over erosion area. Not to exceed 300 cubic yards per site.
2001 AZ. Erosion Repair under 50 CY Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area under 50 cubic yards will be paid by site. This item will be paid by site.
2001 BA. Erosion Repair Over 50 Cubic Yards Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area over 50 cubic yards will be paid by cubic yards (CY).
2001 BB. Straw Wattle Includes all work, equipment, and materials necessary to deliver and install a wattle to prevent future erosion of the HICS Right of Way. Installation of a Straw wattle will be performed using best standard practices. This item paid per EA.
2001 BC. Bonding. Shall be paid for as a Lump Sum (LS) at the amount per Government contract requirements.
Estimated Total CLINS 2001 AA- 2001BC ______________
OPTION YEAR 3
3001 AA. Bore Rig Mobilization. This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Horizontal Directional Drilling (HDD). These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Bore Rig Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for " Bore Rig Mobilization." The Government will exercise every effort to keep the Bore Rig mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Mobilization shall be paid as Each (EA).
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
3001 AB. Erosion Control Mobilization. This line item shall be used to cover all costs related to mobilization of an equipment set necessary to perform Erosion Control measures as outlined in the this project. These costs may include general contract requirements, administration, and overhead shall be merged and included in the contract lump sum costs for "Erosion Control Mobilization". The cost of all insurance, permits, safety, fees, and licenses, shop drawings and samples, general administration and overhead, movement of equipment, tools, and other incidental work required for occupying the site and performing the work shall be merged and included in the contract lump sum price for "Erosion Control Mobilization." The Government will exercise every effort to keep the Erosion Control mobilization from one site to the next to a minimum distance. The Government will only pay for 1 mobilization per site. Mobilization shall be paid as Each (EA).
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Erosion Control Mobilization Each _________ 1 ___________
3001 AC. 4” Conduit. Includes the purchase and delivery of a 4” SDR 11 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
3001 AD. 4” Conduit over 500 Feet. Includes the purchase and delivery of a 4” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 4” conduit shall be paid by the Lineal Foot (LF). Estimated 500-1000 LF per Site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
3001 AE. 6” Conduit. Includes the purchase and delivery of a 6” SDR 9 HDPE continuous length conduit. All Directional Bores will start and stop within the Missile Cable Right of Way. 6” conduit shall be paid by the Lineal Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
3001 AF. Directional Bore Clay 4” conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry.
Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
3001 AG. Directional Bore Clay 6”conduit Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 6”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry.
Directional Bore in clay shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
3001 AH. Directional Bore Clay 4”Conduit over 500 feet Includes all work, equipment, and materials necessary to Directional Bore through clay and pull back a 4”conduit. Clay is a fine grained soil or the fine grained portion of a soil that can be made to exhibit plasticity within a range of water contents, and which exhibits considerable strength when air dry. Directional Bore in clay shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
UNIT UNIT EXTENDED
3001 AJ. Directional Bore Cobble 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches.
Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
3001 AK. Directional Bore Cobble 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 6”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches.
Directional Bore in cobble shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
3001 AL. Directional Bore Cobble 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through cobble and pull back a 4”conduit. Cobble is described as a class of rock with a particle size of 3-12 inches. Directional Bore in cobble shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
UNIT UNIT EXTENDED
3001 AM. Directional Bore Rock 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone.Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
3001 AN. Directional Bore Rock 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 6”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
3001 AP. Directional Bore Rock 4” Conduit over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through rock and pull back a 4”conduit. Rock is defined as any consolidated material consisting of more than one mineral and, sometimes, organic material, e.g. granite or limestone. Directional Bore in rock shall be paid by Linear Foot (LF). Estimated 500-1,000 LF per site.
UNIT UNIT EXTENDED
3001 AQ. Directional Bore Shale 4” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF).
Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
3001 AR. Directional Bore Shale 4” Conduit Over 500 Feet Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 4”conduit. Shale is defined as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF). Not to exceed 500-1000 LF per site.
UNIT UNIT EXTENDED
3001 AS. Directional Bore Shale 6” Conduit Includes all work, equipment, and materials necessary to Directional Bore through shale and pull back a 6”conduit. Shale is described as a sedimentary rock composed of silt and clay size particles. Shale tends to break and separate into thin layers. Directional Bore in shale shall be paid by Linear Foot (LF).
Not to exceed 500 LF per site.
UNIT UNIT EXTENDED
3001 AT. Class III Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include Class III rip rap. Class III rip rap rock will be a minimum size of
9.24 – 33.84 inch. Not to exceed 900 cubic yards per site.
3001 AU. Class II Rip Rap Includes all work, equipment, and materials necessary to deliver, stockpile, excavate, haul, fill, grade and compact all materials to include class II rip rap. Class II rip rap rock will be a minimum size of
7.32 - 24 inch. Not to exceed 800 cubic yards per site.
UNIT UNIT EXTENDED
3001 AV. Class I Rip Rap Includes all work, equipment, and materials necessary to deliver, and stockpile, excavate, haul, fill, grade and compact all materials to include Class I rip rap. Class I rip rap rock will be a minimum size of 3.24
– 12.6 inch. Not to exceed 800 cubic yards per site.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Class I Rock CY ________ 1 __________
3001 AW. Rip Rap Hauling Includes all labor, equipment, and materials necessary to transport/haul Class I, II, III rip rap from the approved quarry to the Erosion Control work location. Rip Rap Hauling will be paid by the Ton/Mile measured from the Malmstrom AFB, MT to the work Location.
UNIT UNIT EXTENDED
UNIT PRICE EST QTY PRICE
Rip Rap Hauling Ton/Mile ________ 1 _________
3001 AX. Fill Dirt Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include fill dirt and water needed for compaction. This item also includes placing fill dirt around cable and bringing area back to original grade as much as possible. Fill dirt is with rock less than 2 inches in diameter. Not to exceed 500 cubic yards per site.
3001 AY. Top Soil Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil and water needed for compaction. This item also includes placing top soil over erosion area. Not to exceed 300 cubic yards per site.
3001 AZ. Erosion Repair under 50 CY Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt, rip rap, and water for compaction. This item also includes the installation of Broad Based Dips, Water turn outs, and Wattles to prevent future erosion of the HICS Right of Way. Erosion area under 50 cubic yards will be paid by site. This item will be paid by site.
3001 BA. Erosion Repair Over 50 Cubic Yards Includes all work, equipment, and materials necessary to deliver, strip, and stockpile, excavate, haul, fill, grade and compact all materials to include native clean top soil, fill dirt,…