Pre-Proposal Site Visit Meeting Minutes.doc

DOC document 31 KB Posted

Attached to
RECOVERY--NZAS041053, Repair Logistics Readiness Squadron Facility Exterior (Bldg 910)
Solicitation number
FA4626-09-R-0041
Issued by

About this file

Pre-Proposal Site Visit Meeting Minutes

View the file

Other files

File Type Posted
Amended Wage Det.docx DOCX document
Amendment 1.pdf PDF
Questions and Answers.doc DOC document
Attach 5 Wage Determination.docx DOCX document
Attach 1 Specifications.zip ZIP file
Solicitation.doc DOC document
Attach 2 Submittal Schedule.xls XLS spreadsheet
Attach 4 Drawings.zip ZIP file
Attach 3 Schedule of Drawings.docx DOCX document
Attach 6 Past Performance.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRE-PROPOSAL CONFERENCE/SITE VISIT MEETING MINUTES

RECOVERY ACT - REPLACE GENERATORS MAFs

FA4626-09-R-0041

10 Aug 2009/ 9:00 am

· PROJECT: Repair Exterior, Bldg 910, LRS

· INDIVIDUALS IN ATTENDANCE: Luke LaLiberty,Project Engineer, 341 CES; Darrin Small, Project Inspector, 341 CES; Jen Regel, Engineer, 341 CES; Jake Berger, Jackson Contractor Group; Mike Barsness, John Talcott Construction; Deborah Lacy, Contract Administrator, 341 CCS.

· PERFORMANCE PERIOD: 120 calendar days with winter exclusion period from 1 Nov 09 – 1 Apr 10.

· LIQUIDATED DAMAGES: $342.21 per day

· PAST PERFORMANCE: Past/Present Performance is due 1400 MST, 24 Aug 09, but NLT 1400 MST, 3 Sep 09.

· CLOSING DATE: 3 Sep 09 at 1400 hours

· REPRESENTATION & CERTIFICATION: Fill them out completely and make sure they are submitted along with your proposal. Online Representations and Certifications Application (ORCA).

· REMINDERS:

· All amendments and answers to any questions will be posted on the internet (FBO http://www.fedbizopps.gov/)

· Read sections L & M thoroughly, pay attention to dates.

· Make sure you have a DUNS & CAGE CODE number—see website (sec I)

· Magnitude of project: $500,000 -$1,000,000

· Discussed specs and drawings: There were no immediate requests for clarification.

· Went to Bldg 910 Meeting was adjourned.

File details come from the government source that posted it. Updated .