Attachment 2 Submittal Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amended Wage Det.docx | DOCX document | |
| Amendment 1.pdf | ||
| Questions and Answers.doc | DOC document | |
| Pre-Proposal Site Visit Meeting Minutes.doc | DOC document | |
| Attach 5 Wage Determination.docx | DOCX document | |
| Attach 1 Specifications.zip | ZIP file | |
| Solicitation.doc | DOC document | |
| Attach 4 Drawings.zip | ZIP file | |
| Attach 3 Schedule of Drawings.docx | DOCX document | |
| Attach 6 Past Performance.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 04-1053 | REPAIR EXTERIOR BUILDING 910, LRS | FA4626-09-R-0041 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST REPORTS | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| 1 | GENERAL REQUIREMENTS 01000 - 3.7 | 4 | |||||||||||||||||||
| 2 | GENERAL REQUIREMENTS 01000 - 3.8 | 4 | 4 | ||||||||||||||||||
| 3 | GENERAL REQUIREMENTS 01000 - 3.9 | 4 | |||||||||||||||||||
| 4 | PRODUCT REQUIREMENTS 01600 - 1.01A | 4 | |||||||||||||||||||
| 5 | PRODUCT REQUIREMENTS 01600 - 1.01B | 4 | |||||||||||||||||||
| 6 | PRODUCT REQUIREMENTS 01600 - 1.01C | 4 | |||||||||||||||||||
| 7 | DEMOLITION 02225 - 1.04B (Demolition Plan) | 4 | |||||||||||||||||||
| 8 | DEMOLITION 02225 - 1.04C (Project Record Documents) | 4 | |||||||||||||||||||
| 9 | MASONRY VENEER 04816 - 1.04B | 4 | |||||||||||||||||||
| 10 | MASONRY VENEER 04816 - 1.04C | 4 | |||||||||||||||||||
| 11 | METAL FABRICATIONS 05500 - 1.04B | 4 | |||||||||||||||||||
| 12 | METAL WALL PANELS 07410 - 1.03B | 4 | |||||||||||||||||||
| 13 | METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03A (Manufacturer's Qualifications) | 4 | |||||||||||||||||||
| 14 | METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03B | 4 | |||||||||||||||||||
| 15 | METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03C | 4 | |||||||||||||||||||
| 16 | METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03D | 4 | |||||||||||||||||||
| 17 | METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03E | 4 | |||||||||||||||||||
| 18 | METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03F (Installer's Qualifications) | 4 | |||||||||||||||||||
| 19 | METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03G (Manufacturer's Field Report) | 4 | |||||||||||||||||||
| 20 | METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03H (Maintenance Data) | 4 | |||||||||||||||||||
| 21 | METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03I (Executed Warranty) | 4 | |||||||||||||||||||
| 22 | SHEET METAL FLASHING & TRIM 07620 - 1.03B | 4 | |||||||||||||||||||
| 23 | JOINT SEALERS 07900 - 1.04B | 4 | |||||||||||||||||||
| 24 | PAINTS & COATINGS 09900 - 1.05B | 4 | |||||||||||||||||||
| 25 | PAINTS & COATINGS 09900 - 1.05C | 4 | |||||||||||||||||||
| 26 | PAINTS & COATINGS 09900 - 1.05D | 4 | |||||||||||||||||||
| 27 | PAINTS & COATINGS 09900 - 1.05E | 4 | |||||||||||||||||||
| 28 | PAINTS & COATINGS 09900 - 1.05F | 4 | |||||||||||||||||||
| 29 | PAINTS & COATINGS 09900 - 1.05G (Maintenance Data) | 4 | |||||||||||||||||||
| 30 | FIRE PROTECTION BASIC MATERIALS & METHODS 13910 - 1.03B | 4 | |||||||||||||||||||
| 31 | FIRE PROTECTION BASIC MATERIALS & METHODS 13910 - 1.03C | 4 | |||||||||||||||||||
| 32 | FIRE SUPPRESSION SPRINKLERS 13925 - 1.04B | 4 | |||||||||||||||||||
| 33 | FIRE SUPPRESSION SPRINKLERS 13925 - 1.04B | 4 | |||||||||||||||||||
| 34 | DUCTS 15810 - 1.04B | 4 | |||||||||||||||||||
| 35 | GENERAL PROVISIONS FOR ELECTRICAL WORK 16000 - 2.1A | 4 | |||||||||||||||||||
| 36 | GENERAL PROVISIONS FOR ELECTRICAL WORK 16000 - 2.1A (Project Record Documents) | 4 | |||||||||||||||||||
| 37 | GENERAL PROVISIONS FOR ELECTRICAL WORK 16000 - 2.1B | 4 | |||||||||||||||||||
| 38 | LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES 16123 - 1.03B | 4 | |||||||||||||||||||
| 39 | LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES 16123 - 1.03C | 4 | |||||||||||||||||||
| 40 | LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES 16123 - 1.03D | 4 | |||||||||||||||||||
| 41 | LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES 16123 - 1.03E (Project Record Documents) | 4 | |||||||||||||||||||
| 42 | CONDUIT 16131 - 1.03B | 4 | |||||||||||||||||||
| 43 | CONDUIT 16131 - 1.03C (Project Record Documents) | 4 | |||||||||||||||||||
| 44 | BOXES 16138 - 1.03B | 4 | |||||||||||||||||||
| 45 | BOXES 16138 - 1.03C (Project Record Documents) | 4 | |||||||||||||||||||
| 46 | EXTERIOR LUMINAIRES 16520 - 1.3B | 4 | |||||||||||||||||||
| 47 | EXTERIOR LUMINAIRES 16520 - 1.3C | 4 | |||||||||||||||||||
| Schedule of Abbreviations | |||||||||||||||||||||
| AWC | = After Work Completed | BMF | = | Before Material Delivery | |||||||||||||||||
| PTSW | = Prior to Starting Work | SN | = | Advance Notification | |||||||||||||||||
| AFA | = After Final Acceptance | SRO | = | After Each Occurrence | |||||||||||||||||
| PTO | = Prior to Outage | PTFI | = | Prior to Final Inspection | |||||||||||||||||
| PTNT | = Prior to Notice to Proceed | PTFP | = | Prior to Final Payment | |||||||||||||||||
| ANTP | = After Notice to Proceed | PTCW | = | Prior to Completing Work | |||||||||||||||||
| EWD | = Each work day AF Form 3000 not required | AFI | = | After Final Inspection | |||||||||||||||||
| PTFA | = Prior to Final Acceptance | PT | = | Prior To | |||||||||||||||||
| ACA | = After Contract Award |
&R&"Times New Roman,Regular"&11Attachment 2 &L&"Times New Roman,Regular"&12AF Form 66
02: 000510_AC01_00_90-
&F-&D&C&"Times New Roman,Regular"&12SS-&P
File details come from the government source that posted it. Updated .