Attach 2 Submittal Schedule.xls

XLS spreadsheet 34 KB Posted

Attached to
RECOVERY--NZAS041053, Repair Logistics Readiness Squadron Facility Exterior (Bldg 910)
Solicitation number
FA4626-09-R-0041
Issued by

About this file

Attachment 2 Submittal Schedule

View the file

Other files

File Type Posted
Amended Wage Det.docx DOCX document
Amendment 1.pdf PDF
Questions and Answers.doc DOC document
Pre-Proposal Site Visit Meeting Minutes.doc DOC document
Attach 5 Wage Determination.docx DOCX document
Attach 1 Specifications.zip ZIP file
Solicitation.doc DOC document
Attach 4 Drawings.zip ZIP file
Attach 3 Schedule of Drawings.docx DOCX document
Attach 6 Past Performance.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 04-1053REPAIR EXTERIOR BUILDING 910, LRSFA4626-09-R-0041
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSTEST REPORTSOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1GENERAL REQUIREMENTS 01000 - 3.74
2GENERAL REQUIREMENTS 01000 - 3.844
3GENERAL REQUIREMENTS 01000 - 3.94
4PRODUCT REQUIREMENTS 01600 - 1.01A4
5PRODUCT REQUIREMENTS 01600 - 1.01B4
6PRODUCT REQUIREMENTS 01600 - 1.01C4
7DEMOLITION 02225 - 1.04B (Demolition Plan)4
8DEMOLITION 02225 - 1.04C (Project Record Documents)4
9MASONRY VENEER 04816 - 1.04B4
10MASONRY VENEER 04816 - 1.04C4
11METAL FABRICATIONS 05500 - 1.04B4
12METAL WALL PANELS 07410 - 1.03B4
13METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03A (Manufacturer's Qualifications)4
14METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03B4
15METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03C4
16METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03D4
17METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03E4
18METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03F (Installer's Qualifications)4
19METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03G (Manufacturer's Field Report)4
20METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03H (Maintenance Data)4
21METAL COMPOSITE MATERIAL WALL PANELS 07431 - 1.03I (Executed Warranty)4
22SHEET METAL FLASHING & TRIM 07620 - 1.03B4
23JOINT SEALERS 07900 - 1.04B4
24PAINTS & COATINGS 09900 - 1.05B4
25PAINTS & COATINGS 09900 - 1.05C4
26PAINTS & COATINGS 09900 - 1.05D4
27PAINTS & COATINGS 09900 - 1.05E4
28PAINTS & COATINGS 09900 - 1.05F4
29PAINTS & COATINGS 09900 - 1.05G (Maintenance Data)4
30FIRE PROTECTION BASIC MATERIALS & METHODS 13910 - 1.03B4
31FIRE PROTECTION BASIC MATERIALS & METHODS 13910 - 1.03C4
32FIRE SUPPRESSION SPRINKLERS 13925 - 1.04B4
33FIRE SUPPRESSION SPRINKLERS 13925 - 1.04B4
34DUCTS 15810 - 1.04B4
35GENERAL PROVISIONS FOR ELECTRICAL WORK 16000 - 2.1A4
36GENERAL PROVISIONS FOR ELECTRICAL WORK 16000 - 2.1A (Project Record Documents)4
37GENERAL PROVISIONS FOR ELECTRICAL WORK 16000 - 2.1B4
38LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES 16123 - 1.03B4
39LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES 16123 - 1.03C4
40LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES 16123 - 1.03D4
41LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES 16123 - 1.03E (Project Record Documents)4
42CONDUIT 16131 - 1.03B4
43CONDUIT 16131 - 1.03C (Project Record Documents)4
44BOXES 16138 - 1.03B4
45BOXES 16138 - 1.03C (Project Record Documents)4
46EXTERIOR LUMINAIRES 16520 - 1.3B4
47EXTERIOR LUMINAIRES 16520 - 1.3C4
Schedule of Abbreviations
AWC= After Work CompletedBMF=Before Material Delivery
PTSW= Prior to Starting WorkSN=Advance Notification
AFA= After Final AcceptanceSRO=After Each Occurrence
PTO= Prior to OutagePTFI=Prior to Final Inspection
PTNT= Prior to Notice to ProceedPTFP=Prior to Final Payment
ANTP= After Notice to ProceedPTCW=Prior to Completing Work
EWD= Each work day AF Form 3000 not requiredAFI=After Final Inspection
PTFA= Prior to Final AcceptancePT=Prior To
ACA= After Contract Award

&R&"Times New Roman,Regular"&11Attachment 2 &L&"Times New Roman,Regular"&12AF Form 66

02: 000510_AC01_00_90-

&F-&D&C&"Times New Roman,Regular"&12SS-&P

File details come from the government source that posted it. Updated .