FA462524Q1050_Amendment 1.pdf

PDF 74 KB Posted

Attached to
Wastewater Treatment Plant Belt Filter Press Control Panel Federal contract opportunity
Solicitation number
FA462524Q1050
Issued by
Department of the Air Force Global Strike Command

About this file

This document is an amendment to a solicitation for the Wastewater Treatment Plant Belt Filter Press Control Panel at Whiteman Air Force Base. The amendment contains information about a mandatory site visit on May 16, 2024, with RSVP required by May 13, 2024. It also provides answers to several questions, including that the use of a Programmable Logic Controller (PLC) is not acceptable, there is no cost estimate or budget provided, the period of performance is 6 months from award with a 30-day installation timeline, and this is a new acquisition with no incumbent. The related federal contract opportunity is for the removal of the existing Belt Filter Press Control Panel and the fabrication and installation of a new one, with the existing functionality to be replicated using modern components and functional upgrades as outlined in the attached documents.

View the file

Other files for this federal contract opportunity

Other files attached to Wastewater Treatment Plant Belt Filter Press Control Panel, newest first.
File Type Posted
FA462524Q1050 Amendment 3.pdf PDF
FA462524Q1050_Amendment 2.pdf PDF
WWTP Panel COMBO_FA462524Q1050.pdf PDF
Atch 1_PWS_24 April 2024.pdf PDF
Atch 3_Existing Schematics.pdf PDF
Atch 2_Provisions and Clauses.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wastewater Treatment Plant Control Panel

FA462524Q1050

Amendment 1: Questions and Answers

Site Visit

There will be a site visit 16 May 2024 at 10 AM Central Time. Offerors will meet at the

Wastewater Treatment Plant (875 SE 170, Knob Noster, MO 65336). Only two attendees from each company shall be allowed.

RSVP NLT 2 PM Central Time, 13 May 2024 to the email address in the solicitation with the:

• company name

• attendee name/email address/phone number

Questions and Answers

1. Is the use of a Programmable Logic Controller (PLC), in lieu of traditional relays and timers acceptable?

a. No. The Government does not consider the use of a Programmable Logic Controller

(PLC) in lieu of traditional relays and timers to be acceptable.

2. Is there a cost estimate, budget or ballpark figure for the project listed?

a. No.

3. Is there an actual start date for the project?

a. IAW paragraph 6.3 of the PWS “The Period of Performance (PoP) shall be 6 months from the signing of the award. All removal, fabrication, installation, and troubleshooting shall occur within the PoP.”

b. IAW paragraph 3.3.1 of the PWS “Installation shall begin following fabrication and must occur and be completed within 30 days of existing panel removal.”

4. We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services.

a. This is a combined synopsis/solicitation for a new acquisition yet to be awarded.

5. If not brand new, could you please provide the current / previous contract number?

a. See question 4.