Attachment 3 Bid Schedule revised 22Apr21..xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- Whiteman AFB Airfield Pavements RFP Federal contract opportunity
- Solicitation number
- FA462521R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 11 Questions and Answers.pdf | ||
| Attachment 12 Revised Section L Part III Past Performance Information.pdf | ||
| FA462521R00010003 Amendment 3.pdf | ||
| FA462521R00010002 Amendment 2.pdf | ||
| FA462521R00010001 SF 30 Amendment 1.pdf | ||
| Attachment 2 SOW Dated revised 22Apr21.pdf | ||
| Attachment 3 Bid Schedule.xlsx | XLSX spreadsheet | |
| Attachment 9 AF 3064 Progress Schedule - graph.xlsx | XLSX spreadsheet | |
| Attachment 10 AF 3065 Contract Progress Report.pdf | ||
| Attachment 1 Solicitation - FA462521R0001.pdf | ||
| Attachment 2 SOW Dated 9.30.2020.pdf | ||
| Attachment 5 Cell Phone Use WAFBI 31-116.pdf | ||
| Attachment 6 Past Performance Questionnaire.docx | DOCX document | |
| Attachment 7. Airfield IDIQ Seed Project SOW.pdf | ||
| Attachment 8 Seed Project Site Visit Instructions.docx | DOCX document | |
| Attachment 4 DBA Wage Determination MO20210001 Heavy and Highway dated 02-12-2021.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Period | Total Price |
| Base Year | $0.00 |
| Option Period 1 | $0.00 |
| Option Period 2 | $0.00 |
| Option Period 3 | $0.00 |
| Option Period 4 | $0.00 |
| GRAND TOTAL | $0.00 |
| &"Arial,Regular"FA462521R0001 | &"Arial,Regular"Airfield Pavement Bid Schedule |
| &"Arial,Regular"Attachment 3 |
&"Arial,Regular"22 April 2021 Totals
Base Year
| CLIN Ref. # | DESCRIPTION | UNIT | EST. QTY. | UNIT PRICE | TOTAL UNIT PRICE |
| 0001 | Base Year | ||||
| 0002 | Concrete Surface Repair (02611) | SF | 1,125 | ||
| 0003 | Spall Repair-Epoxy Bond PCC (02611) | SF | 1,500 | ||
| 0004 | Joint Sealing (02580) | LF | 40,000 | ||
| 0005 | Repair Pop Outs (02574) | EA | 4,250 | ||
| 0006 | Dowel Bars 1.25” X 20” (02611.2) | EA | 175 | ||
| 0007 | Dowel Bars 1.25” X 20” Epoxyed (02611.2) | EA | 175 | ||
| 0008 | Remove/Replace Striping All Affected Areas (02577) | LF | 250 | ||
| 0009 | Remove/Replace Striping Reflective 36”(02577) | LF | 250 | ||
| 0010 | Remove/Replace Striping Non-reflective Black Border 6” Airfield (1-10000 LF) (02577) | LF | 500 | ||
| 0011 | Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) | LF | 2,750 | ||
| 0012 | Reflective Striping Airfield Standard 6” (>10000 LF) (02577) | LF | 1,250 | ||
| 0013 | Non-reflective Black Border 6” Airfield Striping (1-10000 LF) (02577) | LF | 2,750 | ||
| 0014 | Non-reflective Black Border 6” Airfield Striping (>10000 LF) (02577) | LF | 2,750 | ||
| 0015 | Aircraft Tie Down Points | EA | 7 | ||
| 0016 | Aircraft Ground Points | EA | 7 | ||
| 0017 | Slab Replacement per Ft Depth 750 Flex (02611.2) | SY | 2,475 | ||
| 0018 | Portland Sub-base Stabilization Course 8” (02239) | SY | 2,475 | ||
| 0019 | Core Drilling/Incl. Repair Hole 4” x 2’ depth (02611) | EA | 15 | ||
| 0020 | Reinforced Concrete Pipe (RCP) Remove/Replace 18 “x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 0021 | Reinforced Concrete Pipe (RCP) Remove/Replace 24“x Std. Length (0 – 6 ft. depth) | LG | 1 | ||
| 0022 | Reinforced Concrete Pipe (RCP) Remove/Replace 30-36“x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 0023 | Reinforced Concrete Pipe (RCP) Remove/Replace 48“x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 0024 | Manhole/Area Inlet Cover Adjust to Elevation (SFCA 16') (2' to 6' Depth) | EA | 1 | ||
| 0025 | Groove Runway Slabs (1-1,500 square yards) | SY | 500 | ||
| 0026 | Groove Runway Slabs (>1,500 square yards) | SY | 1,125 | ||
| 0027 | Remove/Replace Striping Reflective 36”(02577) Type III Beads | LF | 250 | ||
| 0028 | Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type III Beads | LF | 2,750 | ||
| 0029 | Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type III Beads | LF | 1,125 | ||
| Total Base Year | $0.00 | ||||
| Project: | |||||
| Period of Performance (days): | |||||
| Prepared by: | |||||
| Date: |
&"Arial,Regular"FA462521R0001 &"Arial,Regular"Airfield Pavement Bid Schedule &"Arial,Regular"Attachment 3
&"Arial,Regular"Base Year - 1 July 2021 - 30 June 2022 22 April 2021
Option Yr 1
| CLIN Ref. # | DESCRIPTION | UNIT | EST. QTY. | UNIT PRICE | TOTAL UNIT PRICE |
| 1001 | Option Year 1 | ||||
| 1002 | Concrete Surface Repair (02611) | SF | 1,125 | ||
| 1003 | Spall Repair-Epoxy Bond PCC (02611) | SF | 1,500 | ||
| 1004 | Joint Sealing (02580) | LF | 40,000 | ||
| 1005 | Repair Pop Outs (02574) | EA | 4,250 | ||
| 1006 | Dowel Bars 1.25” X 20” (02611.2) | EA | 175 | ||
| 1007 | Dowel Bars 1.25” X 20” Epoxyed (02611.2) | EA | 175 | ||
| 1008 | Remove/Replace Striping All Affected Areas (02577) | LF | 250 | ||
| 1009 | Remove/Replace Striping Reflective 36”(02577) Type I Beads | LF | 250 | ||
| 1010 | Remove/Replace Striping Non-reflective Black Border 6” Airfield (1-10000 LF) (02577) | LF | 500 | ||
| 1011 | Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type I Beads | LF | 2,750 | ||
| 1012 | Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type 1 Beads | LF | 1,250 | ||
| 1013 | Non-reflective Black Border 6” Airfield Striping (1-10000 LF) (02577) | LF | 2,750 | ||
| 1014 | Non-reflective Black Border 6” Airfield Striping (>10000 LF) (02577) | LF | 2,750 | ||
| 1015 | Aircraft Tie Down Points | EA | 7 | ||
| 1016 | Aircraft Ground Points | EA | 7 | ||
| 1017 | Slab Replacement per Ft Depth 750 Flex (02611.2) | SY | 2,475 | ||
| 1018 | Portland Sub-base Stabilization Course 8” (02239) | SY | 2,475 | ||
| 1019 | Core Drilling/Incl. Repair Hole 4” x 2’ depth (02611) | EA | 15 | ||
| 1020 | Reinforced Concrete Pipe (RCP) Remove/Replace 18 “x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 1021 | Reinforced Concrete Pipe (RCP) Remove/Replace 24“x Std. Length (0 – 6 ft. depth) | LG | 1 | ||
| 1022 | Reinforced Concrete Pipe (RCP) Remove/Replace 30-36“x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 1023 | Reinforced Concrete Pipe (RCP) Remove/Replace 48“x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 1024 | Manhole/Area Inlet Cover Adjust to Elevation (SFCA 16') (2' to 6' Depth) | EA | 1 | ||
| 1025 | Groove Runway Slabs (1-1,500 square yards) | SY | 500 | ||
| 1026 | Groove Runway Slabs (>1,500 square yards) | SY | 1,125 | ||
| 1027 | Remove/Replace Striping Reflective 36”(02577) Type III Beads | LF | 250 | ||
| 1028 | Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type III Beads | LF | 2,750 | ||
| 1029 | Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type III Beads | LF | 1,125 | ||
| Total Option Year 1 | $0.00 |
| Project: |
| Period of Performance (days): |
| Prepared by: |
| Date: |
&"Arial,Regular"FA462521R0001 &"Arial,Regular"Airfield Pavement Bid Schedule &"Arial,Regular"Attachment 3
&"Arial,Regular"Option Year 1 - 1 July 2022 - 30 June 2023 22 April 2021
Option Yr 2
| CLIN Ref. # | DESCRIPTION | UNIT | EST. QTY. | UNIT PRICE | TOTAL UNIT PRICE |
| 2001 | Option Year 2 | ||||
| 2002 | Concrete Surface Repair (02611) | SF | 1,125 | ||
| 2003 | Spall Repair-Epoxy Bond PCC (02611) | SF | 1,500 | ||
| 2004 | Joint Sealing (02580) | LF | 40,000 | ||
| 2005 | Repair Pop Outs (02574) | EA | 4,250 | ||
| 2006 | Dowel Bars 1.25” X 20” (02611.2) | EA | 175 | ||
| 2007 | Dowel Bars 1.25” X 20” Epoxyed (02611.2) | EA | 175 | ||
| 2008 | Remove/Replace Striping All Affected Areas (02577) | LF | 250 | ||
| 2009 | Remove/Replace Striping Reflective 36”(02577) Type I Beads | LF | 250 | ||
| 2010 | Remove/Replace Striping Non-reflective Black Border 6” Airfield (1-10000 LF) (02577) | LF | 500 | ||
| 2011 | Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type I Beads | LF | 2,750 | ||
| 2012 | Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type I Beads | LF | 1,250 | ||
| 2013 | Non-reflective Black Border 6” Airfield Striping (1-10000 LF) (02577) | LF | 2,750 | ||
| 2014 | Non-reflective Black Border 6” Airfield Striping (>10000 LF) (02577) | LF | 2,750 | ||
| 2015 | Aircraft Tie Down Points | EA | 7 | ||
| 2016 | Aircraft Ground Points | EA | 7 | ||
| 2017 | Slab Replacement per Ft Depth 750 Flex (02611.2) | SY | 2,475 | ||
| 2018 | Portland Sub-base Stabilization Course 8” (02239) | SY | 2,475 | ||
| 2019 | Core Drilling/Incl. Repair Hole 4” x 2’ depth (02611) | EA | 15 | ||
| 2020 | Reinforced Concrete Pipe (RCP) Remove/Replace 18 “x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 2021 | Reinforced Concrete Pipe (RCP) Remove/Replace 24“x Std. Length (0 – 6 ft. depth) | LG | 1 | ||
| 2022 | Reinforced Concrete Pipe (RCP) Remove/Replace 30-36“x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 2023 | Reinforced Concrete Pipe (RCP) Remove/Replace 48“x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 2024 | Manhole/Area Inlet Cover Adjust to Elevation (SFCA 16') (2' to 6' Depth) | EA | 1 | ||
| 2025 | Groove Runway Slabs (1-1,500 square yards) | SY | 500 | ||
| 2026 | Groove Runway Slabs (>1,500 square yards) | SY | 1,125 | ||
| 2027 | Remove/Replace Striping Reflective 36”(02577) Type III Beads | LF | 250 | ||
| 2028 | Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type III Beads | LF | 2,750 | ||
| 2029 | Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type III Beads | LF | 1,125 | ||
| Total Option Year 2 | $0.00 |
&"Arial,Regular"FA462521R0001 &"Arial,Regular"Airfield Pavement Bid Schedule &"Arial,Regular"Attachment 3
&"Arial,Regular"Option Year 2 - 1 July 2023 - 30 June 2024 22 April 2021
Option Yr 3
| CLIN Ref. # | DESCRIPTION | UNIT | EST. QTY. | UNIT PRICE | TOTAL UNIT PRICE |
| 3001 | Option Year 3 | ||||
| 3002 | Concrete Surface Repair (02611) | SF | 1,125 | ||
| 3003 | Spall Repair-Epoxy Bond PCC (02611) | SF | 1,500 | ||
| 3004 | Joint Sealing (02580) | LF | 40,000 | ||
| 3005 | Repair Pop Outs (02574) | EA | 4,250 | ||
| 3006 | Dowel Bars 1.25” X 20” (02611.2) | EA | 175 | ||
| 3007 | Dowel Bars 1.25” X 20” Epoxyed (02611.2) | EA | 175 | ||
| 3008 | Remove/Replace Striping All Affected Areas (02577) | LF | 250 | ||
| 3009 | Remove/Replace Striping Reflective 36”(02577) Type I Beads | LF | 250 | ||
| 3010 | Remove/Replace Striping Non-reflective Black Border 6” Airfield (1-10000 LF) (02577) | LF | 500 | ||
| 3011 | Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type I Beads | LF | 2,750 | ||
| 3012 | Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type I Beads | LF | 1,250 | ||
| 3013 | Non-reflective Black Border 6” Airfield Striping (1-10000 LF) (02577) | LF | 2,750 | ||
| 3014 | Non-reflective Black Border 6” Airfield Striping (>10000 LF) (02577) | LF | 2,750 | ||
| 3015 | Aircraft Tie Down Points | EA | 7 | ||
| 3016 | Aircraft Ground Points | EA | 7 | ||
| 3017 | Slab Replacement per Ft Depth 750 Flex (02611.2) | SY | 2,475 | ||
| 3018 | Portland Sub-base Stabilization Course 8” (02239) | SY | 2,475 | ||
| 3019 | Core Drilling/Incl. Repair Hole 4” x 2’ depth (02611) | EA | 15 | ||
| 3020 | Reinforced Concrete Pipe (RCP) Remove/Replace 18 “x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 3021 | Reinforced Concrete Pipe (RCP) Remove/Replace 24“x Std. Length (0 – 6 ft. depth) | LG | 1 | ||
| 3022 | Reinforced Concrete Pipe (RCP) Remove/Replace 30-36“x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 3023 | Reinforced Concrete Pipe (RCP) Remove/Replace 48“x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 3024 | Manhole/Area Inlet Cover Adjust to Elevation (SFCA 16') (2' to 6' Depth) | EA | 1 | ||
| 3025 | Groove Runway Slabs (1-1,500 square yards) | SY | 500 | ||
| 3026 | Groove Runway Slabs (>1,500 square yards) | SY | 1,125 | ||
| 3027 | Remove/Replace Striping Reflective 36”(02577) Type III Beads | LF | 250 | ||
| 3028 | Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type III Beads | LF | 2,750 | ||
| 3029 | Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type III Beads | LF | 1,125 | ||
| Total Option Year 3 | $0.00 |
&"Arial,Regular"FA462521R0001 &"Arial,Regular"Airfield Pavement Bid Schedule &"Arial,Regular"Attachment 3
&"Arial,Regular"Option Year 3 - 1 July 2024 - 30 June 2025 22 April 2021
Option Yr 4
| CLIN Ref. # | DESCRIPTION | UNIT | EST. QTY. | UNIT PRICE | TOTAL UNIT PRICE |
| 4001 | Option Year 4 | ||||
| 4002 | Concrete Surface Repair (02611) | SF | 1,125 | ||
| 4003 | Spall Repair-Epoxy Bond PCC (02611) | SF | 1,500 | ||
| 4004 | Joint Sealing (02580) | LF | 40,000 | ||
| 4005 | Repair Pop Outs (02574) | EA | 4,250 | ||
| 4006 | Dowel Bars 1.25” X 20” (02611.2) | EA | 175 | ||
| 4007 | Dowel Bars 1.25” X 20” Epoxyed (02611.2) | EA | 175 | ||
| 4008 | Remove/Replace Striping All Affected Areas (02577) | LF | 250 | ||
| 4009 | Remove/Replace Striping Reflective 36”(02577) | LF | 250 | ||
| 4010 | Remove/Replace Striping Non-reflective Black Border 6” Airfield (1-10000 LF) (02577) | LF | 500 | ||
| 4011 | Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) | LF | 2,750 | ||
| 4012 | Reflective Striping Airfield Standard 6” (>10000 LF) (02577) | LF | 1,250 | ||
| 4013 | Non-reflective Black Border 6” Airfield Striping (1-10000 LF) (02577) | LF | 2,750 | ||
| 4014 | Non-reflective Black Border 6” Airfield Striping (>10000 LF) (02577) | LF | 2,750 | ||
| 4015 | Aircraft Tie Down Points | EA | 7 | ||
| 4016 | Aircraft Ground Points | EA | 7 | ||
| 4017 | Slab Replacement per Ft Depth 750 Flex (02611.2) | SY | 2,475 | ||
| 4018 | Portland Sub-base Stabilization Course 8” (02239) | SY | 2,475 | ||
| 4019 | Core Drilling/Incl. Repair Hole 4” x 2’ depth (02611) | EA | 15 | ||
| 4020 | Reinforced Concrete Pipe (RCP) Remove/Replace 18 “x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 4021 | Reinforced Concrete Pipe (RCP) Remove/Replace 24“x Std. Length (0 – 6 ft. depth) | LG | 1 | ||
| 4022 | Reinforced Concrete Pipe (RCP) Remove/Replace 30-36“x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 4023 | Reinforced Concrete Pipe (RCP) Remove/Replace 48“x Std. Length (0 – 6 ft. depth) | LG | 2 | ||
| 4024 | Manhole/Area Inlet Cover Adjust to Elevation (SFCA 16') (2' to 6' Depth) | EA | 1 | ||
| 4025 | Groove Runway Slabs (1-1,500 square yards) | SY | 500 | ||
| 4026 | Groove Runway Slabs (>1,500 square yards) | SY | 1,125 | ||
| 4027 | Remove/Replace Striping Reflective 36”(02577) Type III Beads | LF | 250 | ||
| 4028 | Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type III Beads | LF | 2,750 | ||
| 4029 | Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type III Beads | LF | 1,125 | ||
| Total Option Year 4 | $0.00 |
&"Arial,Regular"FA462521R0001 &"Arial,Regular"Airfield Pavement Bid Schedule &"Arial,Regular"Attachment 3
&"Arial,Regular"Option Year 4 - 1 July 2025 - 30 June 2026 22 April 2021
File details come from the government source that posted it. Updated .