Attachment 3 Bid Schedule revised 22Apr21..xlsx

XLSX spreadsheet 35 KB Posted

Attached to
Whiteman AFB Airfield Pavements RFP Federal contract opportunity
Solicitation number
FA462521R0001
Issued by
Department of the Air Force Global Strike Command

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary

PeriodTotal Price
Base Year$0.00
Option Period 1$0.00
Option Period 2$0.00
Option Period 3$0.00
Option Period 4$0.00
GRAND TOTAL$0.00
&"Arial,Regular"FA462521R0001&"Arial,Regular"Airfield Pavement Bid Schedule
&"Arial,Regular"Attachment 3

&"Arial,Regular"22 April 2021 Totals

Base Year

CLIN Ref. #DESCRIPTIONUNITEST. QTY.UNIT PRICETOTAL UNIT PRICE
0001Base Year
0002Concrete Surface Repair (02611)SF1,125
0003Spall Repair-Epoxy Bond PCC (02611)SF1,500
0004Joint Sealing (02580)LF40,000
0005Repair Pop Outs (02574)EA4,250
0006Dowel Bars 1.25” X 20” (02611.2)EA175
0007Dowel Bars 1.25” X 20” Epoxyed (02611.2)EA175
0008Remove/Replace Striping All Affected Areas (02577)LF250
0009Remove/Replace Striping Reflective 36”(02577)LF250
0010Remove/Replace Striping Non-reflective Black Border 6” Airfield (1-10000 LF) (02577)LF500
0011Reflective Striping Airfield Standard 6” (1-10000 LF) (02577)LF2,750
0012Reflective Striping Airfield Standard 6” (>10000 LF) (02577)LF1,250
0013Non-reflective Black Border 6” Airfield Striping (1-10000 LF) (02577)LF2,750
0014Non-reflective Black Border 6” Airfield Striping (>10000 LF) (02577)LF2,750
0015Aircraft Tie Down PointsEA7
0016Aircraft Ground PointsEA7
0017Slab Replacement per Ft Depth 750 Flex (02611.2)SY2,475
0018Portland Sub-base Stabilization Course 8” (02239)SY2,475
0019Core Drilling/Incl. Repair Hole 4” x 2’ depth (02611)EA15
0020Reinforced Concrete Pipe (RCP) Remove/Replace 18 “x Std. Length (0 – 6 ft. depth)LG2
0021Reinforced Concrete Pipe (RCP) Remove/Replace 24“x Std. Length (0 – 6 ft. depth)LG1
0022Reinforced Concrete Pipe (RCP) Remove/Replace 30-36“x Std. Length (0 – 6 ft. depth)LG2
0023Reinforced Concrete Pipe (RCP) Remove/Replace 48“x Std. Length (0 – 6 ft. depth)LG2
0024Manhole/Area Inlet Cover Adjust to Elevation (SFCA 16') (2' to 6' Depth)EA1
0025Groove Runway Slabs (1-1,500 square yards)SY500
0026Groove Runway Slabs (>1,500 square yards)SY1,125
0027Remove/Replace Striping Reflective 36”(02577) Type III BeadsLF250
0028Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type III BeadsLF2,750
0029Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type III BeadsLF1,125
Total Base Year$0.00
Project:
Period of Performance (days):
Prepared by:
Date:

&"Arial,Regular"FA462521R0001 &"Arial,Regular"Airfield Pavement Bid Schedule &"Arial,Regular"Attachment 3

&"Arial,Regular"Base Year - 1 July 2021 - 30 June 2022 22 April 2021

Option Yr 1

CLIN Ref. #DESCRIPTIONUNITEST. QTY.UNIT PRICETOTAL UNIT PRICE
1001Option Year 1
1002Concrete Surface Repair (02611)SF1,125
1003Spall Repair-Epoxy Bond PCC (02611)SF1,500
1004Joint Sealing (02580)LF40,000
1005Repair Pop Outs (02574)EA4,250
1006Dowel Bars 1.25” X 20” (02611.2)EA175
1007Dowel Bars 1.25” X 20” Epoxyed (02611.2)EA175
1008Remove/Replace Striping All Affected Areas (02577)LF250
1009Remove/Replace Striping Reflective 36”(02577) Type I BeadsLF250
1010Remove/Replace Striping Non-reflective Black Border 6” Airfield (1-10000 LF) (02577)LF500
1011Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type I BeadsLF2,750
1012Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type 1 BeadsLF1,250
1013Non-reflective Black Border 6” Airfield Striping (1-10000 LF) (02577)LF2,750
1014Non-reflective Black Border 6” Airfield Striping (>10000 LF) (02577)LF2,750
1015Aircraft Tie Down PointsEA7
1016Aircraft Ground PointsEA7
1017Slab Replacement per Ft Depth 750 Flex (02611.2)SY2,475
1018Portland Sub-base Stabilization Course 8” (02239)SY2,475
1019Core Drilling/Incl. Repair Hole 4” x 2’ depth (02611)EA15
1020Reinforced Concrete Pipe (RCP) Remove/Replace 18 “x Std. Length (0 – 6 ft. depth)LG2
1021Reinforced Concrete Pipe (RCP) Remove/Replace 24“x Std. Length (0 – 6 ft. depth)LG1
1022Reinforced Concrete Pipe (RCP) Remove/Replace 30-36“x Std. Length (0 – 6 ft. depth)LG2
1023Reinforced Concrete Pipe (RCP) Remove/Replace 48“x Std. Length (0 – 6 ft. depth)LG2
1024Manhole/Area Inlet Cover Adjust to Elevation (SFCA 16') (2' to 6' Depth)EA1
1025Groove Runway Slabs (1-1,500 square yards)SY500
1026Groove Runway Slabs (>1,500 square yards)SY1,125
1027Remove/Replace Striping Reflective 36”(02577) Type III BeadsLF250
1028Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type III BeadsLF2,750
1029Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type III BeadsLF1,125
Total Option Year 1$0.00
Project:
Period of Performance (days):
Prepared by:
Date:

&"Arial,Regular"FA462521R0001 &"Arial,Regular"Airfield Pavement Bid Schedule &"Arial,Regular"Attachment 3

&"Arial,Regular"Option Year 1 - 1 July 2022 - 30 June 2023 22 April 2021

Option Yr 2

CLIN Ref. #DESCRIPTIONUNITEST. QTY.UNIT PRICETOTAL UNIT PRICE
2001Option Year 2
2002Concrete Surface Repair (02611)SF1,125
2003Spall Repair-Epoxy Bond PCC (02611)SF1,500
2004Joint Sealing (02580)LF40,000
2005Repair Pop Outs (02574)EA4,250
2006Dowel Bars 1.25” X 20” (02611.2)EA175
2007Dowel Bars 1.25” X 20” Epoxyed (02611.2)EA175
2008Remove/Replace Striping All Affected Areas (02577)LF250
2009Remove/Replace Striping Reflective 36”(02577) Type I BeadsLF250
2010Remove/Replace Striping Non-reflective Black Border 6” Airfield (1-10000 LF) (02577)LF500
2011Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type I BeadsLF2,750
2012Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type I BeadsLF1,250
2013Non-reflective Black Border 6” Airfield Striping (1-10000 LF) (02577)LF2,750
2014Non-reflective Black Border 6” Airfield Striping (>10000 LF) (02577)LF2,750
2015Aircraft Tie Down PointsEA7
2016Aircraft Ground PointsEA7
2017Slab Replacement per Ft Depth 750 Flex (02611.2)SY2,475
2018Portland Sub-base Stabilization Course 8” (02239)SY2,475
2019Core Drilling/Incl. Repair Hole 4” x 2’ depth (02611)EA15
2020Reinforced Concrete Pipe (RCP) Remove/Replace 18 “x Std. Length (0 – 6 ft. depth)LG2
2021Reinforced Concrete Pipe (RCP) Remove/Replace 24“x Std. Length (0 – 6 ft. depth)LG1
2022Reinforced Concrete Pipe (RCP) Remove/Replace 30-36“x Std. Length (0 – 6 ft. depth)LG2
2023Reinforced Concrete Pipe (RCP) Remove/Replace 48“x Std. Length (0 – 6 ft. depth)LG2
2024Manhole/Area Inlet Cover Adjust to Elevation (SFCA 16') (2' to 6' Depth)EA1
2025Groove Runway Slabs (1-1,500 square yards)SY500
2026Groove Runway Slabs (>1,500 square yards)SY1,125
2027Remove/Replace Striping Reflective 36”(02577) Type III BeadsLF250
2028Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type III BeadsLF2,750
2029Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type III BeadsLF1,125
Total Option Year 2$0.00

&"Arial,Regular"FA462521R0001 &"Arial,Regular"Airfield Pavement Bid Schedule &"Arial,Regular"Attachment 3

&"Arial,Regular"Option Year 2 - 1 July 2023 - 30 June 2024 22 April 2021

Option Yr 3

CLIN Ref. #DESCRIPTIONUNITEST. QTY.UNIT PRICETOTAL UNIT PRICE
3001Option Year 3
3002Concrete Surface Repair (02611)SF1,125
3003Spall Repair-Epoxy Bond PCC (02611)SF1,500
3004Joint Sealing (02580)LF40,000
3005Repair Pop Outs (02574)EA4,250
3006Dowel Bars 1.25” X 20” (02611.2)EA175
3007Dowel Bars 1.25” X 20” Epoxyed (02611.2)EA175
3008Remove/Replace Striping All Affected Areas (02577)LF250
3009Remove/Replace Striping Reflective 36”(02577) Type I BeadsLF250
3010Remove/Replace Striping Non-reflective Black Border 6” Airfield (1-10000 LF) (02577)LF500
3011Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type I BeadsLF2,750
3012Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type I BeadsLF1,250
3013Non-reflective Black Border 6” Airfield Striping (1-10000 LF) (02577)LF2,750
3014Non-reflective Black Border 6” Airfield Striping (>10000 LF) (02577)LF2,750
3015Aircraft Tie Down PointsEA7
3016Aircraft Ground PointsEA7
3017Slab Replacement per Ft Depth 750 Flex (02611.2)SY2,475
3018Portland Sub-base Stabilization Course 8” (02239)SY2,475
3019Core Drilling/Incl. Repair Hole 4” x 2’ depth (02611)EA15
3020Reinforced Concrete Pipe (RCP) Remove/Replace 18 “x Std. Length (0 – 6 ft. depth)LG2
3021Reinforced Concrete Pipe (RCP) Remove/Replace 24“x Std. Length (0 – 6 ft. depth)LG1
3022Reinforced Concrete Pipe (RCP) Remove/Replace 30-36“x Std. Length (0 – 6 ft. depth)LG2
3023Reinforced Concrete Pipe (RCP) Remove/Replace 48“x Std. Length (0 – 6 ft. depth)LG2
3024Manhole/Area Inlet Cover Adjust to Elevation (SFCA 16') (2' to 6' Depth)EA1
3025Groove Runway Slabs (1-1,500 square yards)SY500
3026Groove Runway Slabs (>1,500 square yards)SY1,125
3027Remove/Replace Striping Reflective 36”(02577) Type III BeadsLF250
3028Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type III BeadsLF2,750
3029Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type III BeadsLF1,125
Total Option Year 3$0.00

&"Arial,Regular"FA462521R0001 &"Arial,Regular"Airfield Pavement Bid Schedule &"Arial,Regular"Attachment 3

&"Arial,Regular"Option Year 3 - 1 July 2024 - 30 June 2025 22 April 2021

Option Yr 4

CLIN Ref. #DESCRIPTIONUNITEST. QTY.UNIT PRICETOTAL UNIT PRICE
4001Option Year 4
4002Concrete Surface Repair (02611)SF1,125
4003Spall Repair-Epoxy Bond PCC (02611)SF1,500
4004Joint Sealing (02580)LF40,000
4005Repair Pop Outs (02574)EA4,250
4006Dowel Bars 1.25” X 20” (02611.2)EA175
4007Dowel Bars 1.25” X 20” Epoxyed (02611.2)EA175
4008Remove/Replace Striping All Affected Areas (02577)LF250
4009Remove/Replace Striping Reflective 36”(02577)LF250
4010Remove/Replace Striping Non-reflective Black Border 6” Airfield (1-10000 LF) (02577)LF500
4011Reflective Striping Airfield Standard 6” (1-10000 LF) (02577)LF2,750
4012Reflective Striping Airfield Standard 6” (>10000 LF) (02577)LF1,250
4013Non-reflective Black Border 6” Airfield Striping (1-10000 LF) (02577)LF2,750
4014Non-reflective Black Border 6” Airfield Striping (>10000 LF) (02577)LF2,750
4015Aircraft Tie Down PointsEA7
4016Aircraft Ground PointsEA7
4017Slab Replacement per Ft Depth 750 Flex (02611.2)SY2,475
4018Portland Sub-base Stabilization Course 8” (02239)SY2,475
4019Core Drilling/Incl. Repair Hole 4” x 2’ depth (02611)EA15
4020Reinforced Concrete Pipe (RCP) Remove/Replace 18 “x Std. Length (0 – 6 ft. depth)LG2
4021Reinforced Concrete Pipe (RCP) Remove/Replace 24“x Std. Length (0 – 6 ft. depth)LG1
4022Reinforced Concrete Pipe (RCP) Remove/Replace 30-36“x Std. Length (0 – 6 ft. depth)LG2
4023Reinforced Concrete Pipe (RCP) Remove/Replace 48“x Std. Length (0 – 6 ft. depth)LG2
4024Manhole/Area Inlet Cover Adjust to Elevation (SFCA 16') (2' to 6' Depth)EA1
4025Groove Runway Slabs (1-1,500 square yards)SY500
4026Groove Runway Slabs (>1,500 square yards)SY1,125
4027Remove/Replace Striping Reflective 36”(02577) Type III BeadsLF250
4028Reflective Striping Airfield Standard 6” (1-10000 LF) (02577) Type III BeadsLF2,750
4029Reflective Striping Airfield Standard 6” (>10000 LF) (02577) Type III BeadsLF1,125
Total Option Year 4$0.00

&"Arial,Regular"FA462521R0001 &"Arial,Regular"Airfield Pavement Bid Schedule &"Arial,Regular"Attachment 3

&"Arial,Regular"Option Year 4 - 1 July 2025 - 30 June 2026 22 April 2021

File details come from the government source that posted it. Updated .