Attachment 9 AF 3064 Progress Schedule - graph.xlsx
XLSX spreadsheet 85 KB Posted
- Attached to
- Whiteman AFB Airfield Pavements RFP Federal contract opportunity
- Solicitation number
- FA462521R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 12 Revised Section L Part III Past Performance Information.pdf | ||
| FA462521R00010003 Amendment 3.pdf | ||
| Attachment 11 Questions and Answers.pdf | ||
| FA462521R00010002 Amendment 2.pdf | ||
| Attachment 3 Bid Schedule revised 22Apr21..xlsx | XLSX spreadsheet | |
| Attachment 2 SOW Dated revised 22Apr21.pdf | ||
| FA462521R00010001 SF 30 Amendment 1.pdf | ||
| Attachment 4 DBA Wage Determination MO20210001 Heavy and Highway dated 02-12-2021.pdf | ||
| Attachment 2 SOW Dated 9.30.2020.pdf | ||
| Attachment 5 Cell Phone Use WAFBI 31-116.pdf | ||
| Attachment 6 Past Performance Questionnaire.docx | DOCX document | |
| Attachment 7. Airfield IDIQ Seed Project SOW.pdf | ||
| Attachment 8 Seed Project Site Visit Instructions.docx | DOCX document | |
| Attachment 3 Bid Schedule.xlsx | XLSX spreadsheet | |
| Attachment 10 AF 3065 Contract Progress Report.pdf | ||
| Attachment 1 Solicitation - FA462521R0001.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
1. Prepare one copy of AF Form 3064, in accordance with these instructions, and submit to the contracting officer at the time stated in the contract or as established by the contracting officer.
2. Blocks 1, 2, and 3. Enter the contract number, starting date, and completion date as shown on the contract.
3. Block 8. Enter the title of the project as shown on the contract.
4. Block 9. Enter name and address of your firm. The copy submitted to the contracting officer must be dated and signed by the contractor or an authorized representative of the firm.
5. Lines 1 through 16. Major elements of work (whether unit price or lump sum contract) such as excavation, concrete work, carpentry, engineering, installation of communication electronic facilities, etc., will be shown in Column B in logical sequence and in sufficient detail to identify the element. If the contract calls for more than 11 work elements, additional copies of the AF Form 3064 may be used as a continuation for the work elements.
6. The percentage of each listed work element to the complete job will be shown opposite each element in Column C. As an example, if 3 work elements are shown: excavation, concrete work, and backfill, and it is estimated that excavation is 50% of the total job, concrete 30%, and backfill 20%, these percentages will be shown opposite each element. The total must equal 100%.
7. Columns D through Q will be used to show planned periodic progress, as required by the contracting officer, during the period of the contract. Only the top half of the space under these columns will be used by contractors. Using the example cited above and assuming that the contract period for performance is 8 weeks, and it is planned to accomplish 10% of the excavation work the 1st week and 20% each week until excavation is complete, 10 would be shown in the upper half of Line 1 under Column D, 20 under Column E, and 20 under Column F for a total of 50%. If it is planned to accomplish the concrete work during the 4th, 5th, and 6th weeks in equal amounts, 10 would be entered under Columns G, H, and I on Line 2. Assuming the backfill will be accomplished during the 7th and 8th weeks, 10 would be entered under Columns J and K on Line 3. If the contract extends beyond 14 weeks, additional copies of AF Form 3064 may be used as a continuation of performance record.
8. Total amount of work planned at intervals as shown in Columns D through Q will be totaled and entered in the top half of the space under the appropriate column of Line 12. Again, using the example cited above, the totals under Columns D through K would read 10, 20, 20, 10, 10, 10, 10, 10 for a total of 100%. These totals will be used to plot an overlay graph using Lines 4 through 11, beginning with Column D and extending to the right the number of columns (weeks) authorized by the contract for performance time.
9. In the event the contract is modified by the contracting officer under terms of the contract, changing the progress of work as originally scheduled, adding or deleting work or changing the original completion date, a revised progress schedule will be prepared and submitted to the contracting officer for approval. In preparing the revised schedule, the amount of work completed will be considered, together with the changed new completion date set forth in the contract modification. Considering these factors, the work under the contract will be rescheduled over the new total performance time in the same manner that the original schedule was prepared. The new completion date will be entered in Block 3. "First Revised Schedule," "Second Revised Schedule," etc., will be entered to the left of the form title. Time of submission of the revised schedule will be determined by the contracting officer.
10. At such intervals as may be established by the contracting officer, the contractor will submit to the contracting officer AF Form 3065, "Contract Progress Report," indicating the percentage of work accomplished for each work element during the established reporting period. Accurate reports are of the utmost importance to the contractor and to the Government, since the percentage of completion, or progress, thus reported is used in administration of the contract and may be used in connection with approval of partial payments under the contract. Care should be taken to plan the work in such manner that it can be accomplished as stated in this schedule. If, for any reason, it becomes known that any part of the progress under this contract will be delayed, this fact should be reported to the contracting officer immediately.
Sheet 1
| CONTRACT PROGRESS SCHEDULE | |||
| Sheet 1 | |||
| CONTRACT NO | SUBMITTED BY | DATE SIGNED | BCE APPROVAL RECOMMENDED BY |
| PROJECT TITLE | |||||||||||||||||
| SIGNATURE | |||||||||||||||||
| STARTING DATE | |||||||||||||||||
| COMPLETION DATE | |||||||||||||||||
| DELIVERY ORDER NO | CONTRACTOR'S NAME & ADDRESS | DATE SIGNED | APPROVED BY: (Contracting Official) | ||||||||||||||
| PROJECT NO | |||||||||||||||||
| ACTUAL STARTING DATE | |||||||||||||||||
| ACTUAL COMPLETION DATE | |||||||||||||||||
| LINE | WORK ELEMENTS | % | 3-Oct-17 | 9-Oct-17 | 23-Oct-17 | 6-Nov-17 | 20-Nov-17 | 4-Dec-17 | 18-Dec-17 | 1-Jan-18 | 15-Jan-18 | 29-Jan-18 | 12-Feb-18 | 26-Feb-18 | 12-Mar-18 | 26-Mar-18 | Sum |
| NO. | 8-Oct-17 | 22-Oct-17 | 5-Nov-17 | 19-Nov-17 | 3-Dec-17 | 17-Dec-17 | 31-Dec-17 | 14-Jan-18 | 28-Jan-18 | 11-Feb-18 | 25-Feb-18 | 11-Mar-18 | 25-Mar-18 | 8-Apr-18 | Scheduled | ||
| PR 1 | PR 2 | PR 3 | PR 4 | PR 5 | PR 6 | PR 7 | PR 8 | PR 9 | PR 10 | PR 11 | PR 12 | PR 13 | PR 14 | ||||
| 1 | 5 | 0 | 0.00 | ||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 2 | 20 | 0 | 0.00 | ||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 3 | 50 | 0 | 0.00 | ||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 4 | 25 | 0 | 0.00 | ||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 5 | 0 | 0.00 | |||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 6 | 0 | 0.00 | |||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 7 | 0 | 0.00 | |||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 8 | 0 | 0.00 | |||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 9 | 0 | 0.00 | |||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 10 | 0 | 0.00 | |||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 11 | 0 | 0.00 | |||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 12 | 0 | 0.00 | |||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 13 | 0 | 0.00 | |||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 14 | 0 | 0.00 | |||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 15 | 0 | 0.00 | |||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 16 | 0 | 0.00 | |||||||||||||||
| 0 | 0.00 | ||||||||||||||||
| Subtotal | 100 | 0 |
| Projected WEEKLY PROGRESS % | ||||||||||||||||||
| CLIPPERT, TAMMIE S CIV USAF AFGSC 509 CONS/PKA: contractors estimate at project inception | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Actual WEEKLY PROGRESS % | ||||||||||||||||||
| CLIPPERT, TAMMIE S CIV USAF AFGSC 509 CONS/PKA: progress from weekly progress report | 0.00 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0.00 | |||
| Scheduled Weekly Progress % | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Scheduled Cumulative Progress % | ||||||||||||||||||
| CLIPPERT, TAMMIE S CIV USAF AFGSC 509 CONS/PKA: total progress to date | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 100% | Act Cumulative Prog/Sched | 0.00 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A |
0 0 0 0 0 0 0 0 0 0
Projected vs Actual Progress
Actual WEEKLY PROGRESS % 43016 43030 43044 43058 43072 43086 43100 43114 43128 43142 43156 43170 43184 43198 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Scheduled Cumulative Progress % 43016 43030 43044 43058 43072 43086 43100 43114 43128 43142 43156 43170 43184 43198 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sheet 2
| CONTRACT PROGRESS SCHEDULE | |||
| Sheet 2 | |||
| CONTRACT NO | SUBMITTED BY | DATE SIGNED | BCE APPROVAL RECOMMENDED BY |
| PROJECT TITLE | |||||||||||||||||
| Construct CDC Storm Protection | SIGNATURE | ||||||||||||||||
| STARTING DATE | |||||||||||||||||
| COMPLETION DATE | |||||||||||||||||
| DELIVERY ORDER NO | CONTRACTOR'S NAME & ADDRESS | DATE SIGNED | APPROVED BY: (Contracting Official) | ||||||||||||||
| PROJECT NO | |||||||||||||||||
| ACTUAL STARTING DATE | |||||||||||||||||
| ACTUAL COMPLETION DATE | |||||||||||||||||
| LINE | WORK ELEMENTS | % | 26-Mar-18 | 9-Apr-18 | 23-Apr-18 | 7-May-18 | 21-May-18 | 4-Jun-18 | 12-Jun-18 | 20-Jun-18 | 28-Jun-18 | 6-Jul-18 | 14-Jul-18 | 22-Jul-18 | 30-Jul-18 | 7-Aug-18 | Sum |
| NO. | 8-Apr-18 | 22-Apr-18 | 6-May-18 | 20-May-18 | 3-Jun-18 | 11-Jun-18 | 19-Jun-18 | 27-Jun-18 | 5-Jul-18 | 13-Jul-18 | 21-Jul-18 | 29-Jul-18 | 6-Aug-18 | 14-Aug-18 | Scheduled | ||
| PR 14 | PR 15 | PR 16 | PR 17 | PR 18 | PR 19 | PR 20 | PR 21 | PR 22 | PR 23 | PR 24 | PR 25 | PR 26 | PR 27 | ||||
| 1 | 0 | 5 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 2 | 0 | 20 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 3 | 0 | 50 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 4 | 0 | 25 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 5 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 6 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 7 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 8 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 9 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 10 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 11 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 12 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 13 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 14 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 15 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 16 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| Subtotal | 100 | 0 |
| Projected WEEKLY PROGRESS % | ||||||||||||||||||
| CLIPPERT, TAMMIE S CIV USAF AFGSC 509 CONS/PKA: contractors estimate at project inception | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Actual WEEKLY PROGRESS % | ||||||||||||||||||
| CLIPPERT, TAMMIE S CIV USAF AFGSC 509 CONS/PKA: progress from weekly progress report | 0.00 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0.00 | |||
| Scheduled Weekly Progress % | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Scheduled Cumulative Progress % | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 100% | Act Weekly Prog/Sched | 0.00 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A |
0 0 0 0 0 0 0 0 0 0
Actual WEEKLY PROGRESS % 43198 43212 43226 43240 43254 43262 43270 43278 43286 43294 43302 43310 43318 43326 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Scheduled Cumulative Progress % 43198 43212 43226 43240 43254 43262 43270 43278 43286 43294 43302 43310 43318 43326 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sheet 3
| CONTRACT PROGRESS SCHEDULE | |||
| Sheet 3 | |||
| CONTRACT NO | SUBMITTED BY | DATE SIGNED | BCE APPROVAL RECOMMENDED BY |
| PROJECT TITLE | |||||||||||||||||
| SIGNATURE | |||||||||||||||||
| STARTING DATE | |||||||||||||||||
| COMPLETION DATE | |||||||||||||||||
| DELIVERY ORDER NO | CONTRACTOR'S NAME & ADDRESS | DATE SIGNED | APPROVED BY: (Contracting Official) | ||||||||||||||
| PROJECT NO | |||||||||||||||||
| ACTUAL STARTING DATE | |||||||||||||||||
| ACTUAL COMPLETION DATE | |||||||||||||||||
| LINE | WORK ELEMENTS | % | 7-Aug-18 | 15-Aug-18 | 29-Aug-18 | 12-Sep-18 | 26-Sep-18 | 10-Oct-18 | 24-Oct-18 | 7-Nov-18 | 21-Nov-18 | 5-Dec-18 | 19-Dec-18 | 2-Jan-19 | 16-Jan-19 | 30-Jan-19 | Sum |
| NO. | 14-Aug-18 | 28-Aug-18 | 11-Sep-18 | 25-Sep-18 | 9-Oct-18 | 23-Oct-18 | 6-Nov-18 | 20-Nov-18 | 4-Dec-18 | 18-Dec-18 | 1-Jan-19 | 15-Jan-19 | 29-Jan-19 | 12-Feb-19 | Scheduled | ||
| PR 27 | PR 28 | PR 29 | PR 30 | PR 31 | PR 32 | PR 33 | PR 34 | PR 35 | PR 36 | PR 37 | PR 38 | PR 39 | PR 40 | ||||
| 1 | 0 | 5 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 2 | 0 | 20 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 3 | 0 | 50 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 4 | 0 | 25 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 5 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 6 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 7 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 8 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 9 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 10 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 11 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 12 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 13 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 14 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 15 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| 16 | 0 | 0 | 0 | 0.00 | |||||||||||||
| 0 | 0.00 | ||||||||||||||||
| Subtotal | 100 | 0 |
| Projected WEEKLY PROGRESS % | ||||||||||||||||||
| CLIPPERT, TAMMIE S CIV USAF AFGSC 509 CONS/PKA: contractors estimate at project inception | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Actual WEEKLY PROGRESS % | ||||||||||||||||||
| CLIPPERT, TAMMIE S CIV USAF AFGSC 509 CONS/PKA: progress from weekly progress report | 0.00 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | 0.00 | |||
| Scheduled Weekly Progress % | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| Scheduled Cumulative Progress % | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | ||||
| 100% | Act Cumulative Prog/Sched | 0.00 | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A | ERROR:#N/A |
0 0 0 0 0 0 0 0 0 0
Actual WEEKLY PROGRESS % 43326 43340 43354 43368 43382 43396 43410 43424 43438 43452 43466 43480 43494 43508 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Scheduled Cumulative Progress % 43326 43340 43354 43368 43382 43396 43410 43424 43438 43452 43466 43480 43494 43508 0 0 0 0 0 0 0 0 0 0 0 0 0 0