This is a Questions and Answers document for solicitation FA462126Q0041, which concerns the replacement of an auto hobby shop vehicle lift for the U.S. Air Force under the Federal Supply Schedule (FSS).

The procurement requires delivery of a replacement scissor vehicle lift and 12,000-pound rolling jacks within 60 calendar days after receipt of order, with contract award contingent on fund availability prior to the September 30, 2026 fiscal year close date. Quotes must be submitted by email to james.gomez.9@us.af.mil and sugeys.allen.1@us.af.mil no later than August 28, 2026 at 10:00 AM CST, with submissions including a complete copy of the solicitation with all representations filled in. The lift must be compatible with single-phase power only and fit within a 12.5-foot clearance from concrete floor to the lowest fixture, with a 9-foot garage door entry. The auto lift must qualify as a domestic end product or an eligible product from a Free Trade Agreement country under FAR Clause 52.225-3; Chinese-manufactured lifts imported by American companies do not meet this requirement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA462126Q0041

Q&A - FY26 – 22 FSS Auto Hobby Shop Lift Replacement

Q1. The solicitation schedule lists a requested delivery date of September 30, 2026, while the Statement of Need requires completion within 60 calendar days after receipt of order. Which delivery requirement will control?

Answer: The contractor shall complete delivery of each line item no later than 60 calendar days after receipt of the order. Contract award is subject to the availability of funds prior to the fiscal year close date on September 30, 2026.

Q2. Please confirm the required quote submission method and package contents.

Specifically, should the quote be submitted by email, and are there any required forms, technical data sheets, or signed solicitation pages that must be included with the pricing?

Answer: Please submit copy of solicitation with all representations filled in to james.gomez.9@us.af.mil and sugeys.allen.1@us.af.mil no later than 28 August 2026 at

10:00AM CST.

Q3. What is the height from the concrete floor to the ceiling?

Answer: Concrete floor to lowest fixture in lift space is 12.5ft with a garage door entry of 9ft

Q4. Is there 3-phase power available in the area?

Answer: No, 1 Phase only.

Q5. Please verify that you are looking for a Four-post lift and not a replacement scissor lift for this opportunity.

Answer: The solicitation has been amended to clarify the requirement. A replacement of the existing scissor vehicle lift is being requested.

Q6. Do you require that it is American made? Or is a Chinese lift imported by an American Company sufficient?

Answer: The auto lift must qualify as a domestic end product or an eligible product from a Free Trade Agreement country under FAR Clause 52.225-3. A Chinese-manufactured lift imported by an American company is considered a foreign end product and does not meet these requirements.

mailto:james.gomez.9@us.af.mil mailto:sugeys.allen.1@us.af.mil

Q7. The only place the 12k lb. rolling jacks are listed is in the Statement of Need. Are they also part of the solicitation?

Answer: Yes, 12K lb. rolling jacks shall be included as part of the vendor’s quote along with the scissor lift.