Pre-proposal_Conference_Minutes_24_JUNE_15.pdf
PDF 399 KB Posted
- Attached to
- Simplified Acquisition of Base Engineer Requirements (SABER) at Fort Riley, KS and McConnell AFB, KS
- Solicitation number
- FA462115R0002
About this file
Attached are the meeting minutes and sign in sheet for the site visit conducted on Fort Riley 24 June 2015.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_2.pdf | ||
| FA4621-15-R-0002-0003.pdf | ||
| 15-R-0002-0002.pdf | ||
| Building_7026_Utilities.pdf | ||
| Cad_standards_in_lieu_of_Microstation.pdf | ||
| Questions_and_Answers.pdf | ||
| Funston_Utility_Map.pdf | ||
| Pre-proposal_Conference_Minutes_23_JUNE_15.pdf | ||
| FA4621-15-R-0002-0001.pdf | ||
| Attachment_6_-_Listing_of_Incorporated_Wage_Decisions.docx | DOCX document | |
| Attachment_9_-_iRAPT_Worksheet.docx | DOCX document | |
| Attachment_8_-_PPPQ.docx | DOCX document | |
| Attachment_3_-_CTC.pdf | ||
| Attachment_7_-_NAF_General_Provisions.pdf | ||
| Attachment_4_-_Seed_Project_SOW.doc | DOC document | |
| Attachment_1_-_Price_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_5_-_Drawings.pdf | ||
| RFP_-_FA4621-15-R-0002.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
22d CONTRACTING SQUADRON (AMC)
MCCONNELL AIR FORCE BASE KANSAS
24 June 2015
MEMORANDUM FOR PROSPECTIVE OFFERORS
FROM: 22d Contracting Squadron
53384 Kansas St Ste 121 McConnell AFB KS 67210
SUBJECT: Pre-proposal Conference Minutes for Solicitation FA4621-15-R-0002, McConnell
AFB and Ft. Riley SABER Requirement
1. The pre-proposal conference started at McConnell AFB was continued at Fort Riley, KS, on
Wednesday, 24 June 2015 at 1000 hours for the above referenced request for proposal in accordance with AFFARS provision 5352.215-9001. The Division of Public Works (DPW) conducted a site visit at the Seed Project Building along with drive-by views of various locations.
2. SrA Gregory Smith, the Contract Administrator (CA), introduced key personnel and defined their associated responsibilities:
□ Contracting Administrator (CA) – SrA Gregory Smith is the main point of contact between the Government and prospective offerors; acts as the agent for the CO.
□ Technical Expert – Mr. Chris Brown, Ft Riley DPW is the technical expert intimately familiar with the performance work requirements associated with the solicitation
□ Technical Expert – Mr. Fred Moody, Ft Riley DPW is the technical expert intimately familiar with the performance work requirements associated with the solicitation
3. The CA identified the schedule for the day and gave an overview of the site visit:
a. The first stop of the day was at the seed project location. Contractors were given the opportunity to takes notes, pictures, and examine the future site in order to submit an accurate proposal. All questions were directed to be in writing to the contract administrator and Contracting Officer. This helps delineate any confusion because only the Contracting Officer has the ability bind the Government.
b. Next, we took the contractors to the contractor yard site. We could not visibly see where the contractor’s yard would be because of a training exercise. Fort Riley Department of Public Works did explain that utilities would be available and that a map of the utilities would be provided to all contractors.
c. Lastly, we drove by the access gate which the contractor’s vehicles would come through.
We then headed back to the main visitors gate and the site visit concluded. Before dispersing for the day the contractors were asked if everyone had enough time at the seed project. All contractors agreed that they had received ample time at the seed project location.
d. All questions asked are being posted to FBO in order to maintain fairness between the contractors.
Attachment:
Sign-In Sheet
7/1/2015
X
JOHN C. PERSON, GS-11, USAF
Contracting Officer Signed by: PERSON.JOHN.C.1023010972
| Pre-proposal Conference Minutes 24 JUNE 15 |
| MEMORANDUM FOR PROSPECTIVE OFFERORS |
Sign In Sheet Ft Riley