Amend 2 SF30.pdf

PDF 253 KB Posted

Attached to
CES Cross-Connection Survey
Solicitation number
FA462026QA210
Issued by

About this file

This is Amendment 0002 to solicitation FA462026QA210, issued by the 92nd Contracting Squadron at Fairchild Air Force Base, Washington on April 27, 2026. The amendment provides responses to contractor questions, revises the Statement of Work, and updates the Combined Synopsis/Solicitation (COMBO). Offerors must acknowledge receipt of this amendment prior to the solicitation deadline; failure to do so may result in rejection of the offer. Contractors are required to sign and return one copy of the amendment to the issuing office.

The amendment addresses two key questions from prospective contractors regarding certification requirements. First, the government clarified that it will not accept a Cross-Connection Control Program Specialist certification from the University of Southern California Foundation in lieu of a Washington State-certified Cross-Connection Control Specialist; only Washington State certification is acceptable. Second, the government agreed to modify the certification requirement to apply only to the "team lead" proposed for performance, rather than all personnel, provided that the team lead is the individual who will sign off on survey reports. Attachment 1: Statement of Work (REV1) and the 26QA210 COMBO (REV1) have been revised to reflect these modifications and supersede all previous versions. All other contract terms and conditions remain unchanged.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXCEPTION OF SF 30, APPROVED BY NARS 5/79

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

FA462026QA210

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

27 April 2026

4. REQUISITION/PURCHASE REQ. NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY

CODE

FA4620 7. ADMINISTERED BY (If other than Item 6)

CODE

92nd Contracting Sq./PKA 110 W Ent St., Suite 200 SAME AS BLOCK 6 Fairchild AFB, WA 99011 Attn: kathleen.rauch@us.af.mil

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (√) 9A. AMENDMENT OF SOLICITATION NO.

X

FA462026QA210

All Offerors 9B. DATED (SEE ITEM 11)

14 April 2026

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended, [X] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning _1_ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [] is not, [X] is required to sign this document and return _1_ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE SUMMARY OF CHANGES

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10 A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

KATHLEEN L. RAUCH, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 30-105-03 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FA462026QA210

Amendment 0002 Page 2

SUMMARY OF CHANGES

The purpose of this amendment is to provide additional responses to questions submitted by prospective contractors, to revise the Statement of Work, and to revise the COMBO.

1. Responses to Contractor Questions All questions and answers are provided below. All applicable revisions have been incorporated into Attachment 1: Statement of Work (REV1).

Q1: Will the government consider a Cross-Connection Control Program Specialist certified through the University of Southern California Foundation for Cross-Connection Control and Hydraulic Research (USC FCCCHR) in lieu of the Washington State-certified Cross-Connection Control Specialist?

A1: No. The government cannot accept the USC FCCCHR certification in lieu of the Washington State-certified Cross-Connection Control Specialist. The required certification must be through Washington State. See updated SOW paragraph 6.2.2.

Q2: Regarding the Required Certifications in SOW paragraph 6.2.2, would the government consider modifying the language to require only "the team lead" proposed for performance to hold the certification?

A2: Yes. The government agrees to modify the requirement from "all personnel" to the "team lead," provided that the team lead is the individual who will sign off on the survey reports. See updated SOW paragraph 6.2.2.

2. Revised Statement of Work

Attachment 1: Statement of Work is hereby replaced with Attachment 1: Statement of Work (REV1).

Attachment 1: Statement of Work (REV1) supersedes and replaces all previous versions of the Statement of Work. There is no change to the SOW Appendices.

3. Revised Combined Synopsis/Solicitation (COMBO) FAR Provision 52.212-1 Instructions to Offerors, Subparagraph (4) Technical Description – Required Certifications has been revised to reflect the revised certifications requirements in Attachment 1:

Statement of Work (REV1).

26QA210 COMBO is hereby replaced with 26QA210 COMBO (REV1). 26QA210 COMBO (REV1) supersedes and replaces all previous versions of the COMBO.

All other items remain unchanged.

Fill out blocks 15a, 15b, and 15c and provide a copy with your proposal.

END SUMMARY OF CHANGES

Attachments:

26QA210 COMBO (REV1)

Attachment 1 – Statement of Work (REV1)

27 April 2026

File details come from the government source that posted it. Updated .