25QA913 Amend 0001.pdf
PDF 605 KB Posted
- Attached to
- Bldg 2036 Asbestos Abatement
- Solicitation number
- FA462025QA913
About this file
This is Amendment 0001 to solicitation FA462025QA913, issued by the 92nd Contracting Squadron at Fairchild AFB, WA, effective December 16, 2024. The amendment provides answers to three contractor questions regarding asbestos abatement work in Building 2036.
The clarifications specify that contractors are only required to remove asbestos insulation, not the valves themselves. The material is being assumed to contain asbestos and must be handled according to Washington State regulations WAC 296-62-07701 through 296-62-07753, with no prior testing required. The scope of work involves removing insulation from three valves, specifically 3 feet before and after each valve plus 3 linear feet directly over each valve, totaling 9 linear feet per valve and 27 linear feet total. Contractors must acknowledge this amendment and complete blocks 15a, 15b, and 15c when submitting their proposals. The amendment does not extend the original proposal due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25QA913 Amend 0004.pdf | ||
| 25QA913 Amend 0003.pdf | ||
| 25QA913 Amend 0002.pdf | ||
| 25QA913 Attach 2 - WD 2015-5537 Rev 23.pdf | ||
| 25QA913 COMBO.pdf | ||
| 25QA913 Attach 1 - SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXCEPTION OF SF 30, APPROVED BY NARS 5/79
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
FA462025QA913
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
16 December 2024
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY
CODE
FA4620 7. ADMINISTERED BY (If other than Item 6)
CODE
92nd Contracting Sq./PKA 110 W Ent St., Suite 200 SAME AS BLOCK 6 Fairchild AFB, WA 99011 Attn: kathleen.rauch@us.af.mil
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.
X
FA462025QA913
All Offerors 9B. DATED (SEE ITEM 11)
12 December 2024
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning _1_ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor [] is not, [X] is required to sign this document and return _1_ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SEE SUMMARY OF CHANGES
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10 A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
KATHLEEN L. RAUCH, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 30-105-03 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FA462025QA913
Amendment 0001 Page 2
SUMMARY OF CHANGES
The purpose of this Amendment is to answer contractor questions:
Q1. Does the contractor need to remove the asbestos only or both the valves and asbestos?
A1. Asbestos only.
Q2. Are there any asbestos testing results that can be provided for the referenced requirement? This report will be required before any abatement can take place.
A2. This material is being assumed to contain Asbestos and should be treated as ACM for this requirement. In Washington State, an asbestos inspection is not required if the owner or their agent assumes that a material contains asbestos and handles it in accordance with WAC 296-62-07701 through 296-62-07753.
Q3. Does the contractor need to remove the insulation in its entirety or only a few sections totaling 27 feet?
A3. They are responsible for removing the insulation for 3 ft. before and after the valve, and the 3 linear ft of insulation directly over the valve, totaling 9 linear ft for each valve, and 27 linear ft total for all 3 valves.
All other items remain unchanged.
Fill out blocks 15a, 15b, and 15c and provide a copy with your proposal.
END SUMMARY OF CHANGES