24QA318 Attach. 3 - SOW Bldg 2279 Rev1.pdf
PDF 11 MB Posted
- Attached to
- FY24 Pelco Cameras
- Solicitation number
- FA462024QA318
About this file
This document is a Statement of Work (SOW) for the installation of a Pelco Cameras System in various buildings as part of Solicitation FA462024QA318 issued by the Department of the Air Force Air Mobility Command.
The SOW requires the contractor to provide delivery and installation of the Pelco Cameras System in Dorm Buildings 2268, 2278, 2279, and Warehouse Building 2045. The work shall be performed in accordance with the requirements and specifications detailed in the SOW. No other specific details regarding pricing, response dates, award dates, or set-asides are provided in this document.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
_____________________________________________________________________________________1
STATEMENT OF WORK (SOW)
FOR
PURCHASE AND INSTALLATION OF
PELCO CAMERAS VIDEO SURVEILLANCE
AT
BUILDING 2279
FAIRCHILD AFB, WA
6 AUGUST 2024
FA462024QA318 Amendment 002 Attachment 3 - Statement of Work Building 2279
_____________________________________________________________________________________2
1. BACKGROUND: 92 ARW utilizes BRAND NAME PELCO cameras for security across Fairchild Air Force Base (FAFB). Building 2279 requires the placement, installation, and integration of BRAND NAME PELCO cameras in several locations. The cameras shall integrate with existing infrastructure, controls, and switches.
2. SCOPE OF WORK: The Contractor shall deliver, install, and test thirteen (13) BRAND NAME PELCO cameras on Bldg. 2279 and shall provide a one (1) Juniper 48-port network switch, Uninterrupted Power Supply (UPS), necessary fiber cables, in accordance with (IAW) this Statement of Work and all federal, local, and state regulations and guidelines.
3. OBJECTIVES: Enhance safety and security of FAFB personnel and assets with an integrated and operational closed circuit camera system installed on Bldg. 2279.
4. REQUIREMENTS: The contractor shall furnish, deliver, install, and test the following equipment:
Part Number Description Qty P2230L-ESR Fixed Interior Cameras (E1 to E3) with following salient characteristics:
1. Will be pan, tilt, and zoom (PTZ)
2. Power over Ethernet (POE)
3. Have Infrared (IR) minimum of 150 meters, low-light performance, auto-focusing, video encoding H.264/H.265,
4. Frame rate up to 60 frames
5. 30X optical zoom, 12X digital zoom
6. Aspect ratio 16:9
7. 2 Megapixels (MP), minimum resolution 1920 x 1080
8. Must access through web interface and use Firefox, Google
Chrome, or Explorer
SRXP4-5V10-EMD-IR Exterior Dome Camera (E4 to E10) with following salient characteristics:
1. Fixed and contained in environmental enclosure with heater
2. Color viewing with dome lens cover to obscure camera viewing direction
3. Have auto-focus, infrared minimum of 80 meters, with low light performance both day and night
4. Video encode H.264/H.265
5. Power-over-ethernet
6. Minimum resolution 2592 x 1944
7. 5 megapixels
8. Rated for outdoor use with Ingress Protection (IP) 66/67
9. Must access through web interface and use Firefox, Google
Chrome, or Explorer
SRXP4-5V10-IMD-IR Fixed Interior Dome Cameras (I1 to I3) with following salient characteristics:
1. Must be color viewing with dome lens cover to obscure camera viewing direction
2. Have auto-focus and infrared range 30 to 50 feet with low light performance both day and night
3. Video encode H.264/H.265
4. Power-Over-Ethernet
5. Audio capability
6. 5 megapixels
FA462024QA318 Amendment 002
_____________________________________________________________________________________3
7. Must access through web interface and use Firefox, Google Chrome, or Explorer Minimum resolution 2560 x 1152
4.1. Camera Naming Convention: See Appendix B Camera Naming Conventions. Each camera location has a designated name that will not change. The contractor will label each camera’s web interface the camera naming convention, uppercase is preferred. Additionally, see Appendices B thru T for Bldg. 2279 Camera Field of Views for minimum camera zooms and approximate field of view for determining a person.
4.2. Network Switch:
4.2.1. Contractor will purchase a Juniper network switch with two Power Supply Units (PSU), model EX3400-48P Layer 3 Switch, TAA 48-PORT 10/100/1000BASET, POE+, EX3400-48P-TAA.
4.2.2. Contractor will purchase two Mode Small Factor Pluggables (SFP) for the Juniper switch and a fiber patch cable long enough from the fiber patch panel to the switch inside the rack. The fiber patch cable on one end with have Lucent Connector (LC) connectors and the other Straight Tip (ST) connectors.
4.2.3. No additional Cybersecurity required by the contractor.
4.2.4. The 92 CS/SCOI is responsible for programming and installing the network switch and UPS. The contractor must provide the Juniper Network Switch to 92 CS Infrastructure team 5 business in advance for programming and installation efforts.
4.3. Equipment:
4.3.1. The contractor shall provide ladder(s), lift or other means for elevation accessing high points regarding cameras, boxes, conduit, etc.
4.3.2. The contractor shall provide all tools, equipment, and other specialized tools for installation.
4.3.3. The contractor is responsible for all damaged caused from installing cameras, conduit, boxes, etc.
4.4. Cabling and Connection:
4.4.1. All camera Ethernet runs will be CAT 6 and run between each respective camera and network switch(s).
4.4.2. Splices not permitted and cables will not lay on ceiling tiles.
4.4.3. Cables may run in existing cable trays or affixed to sheetrock walls above ceiling.
4.4.4. CAT 6 Cables will terminate by American National Standards Institute (ANSI) Telecommunications Infrastructure Standard (TIA) / Electronic Industries Alliance (EIA) T568B Standard unless otherwise dictated by hardware specifications.
4.4.5. There will be no loose or poorly fitted connections.
4.4.6. Exterior camera connections will be in exterior waterproof enclosures.
4.4.7. Pull through enclosures can be used. Enclosures used for exterior purposes shall be weatherproof.
4.4.8. All cabling shall be neat, organized, labeled, and have relief loops (minimum 24 inches). Cabling shall not be bent, crimped, any shape that degrades signal quality.
4.4.9. Ethernet cable will be purple color.
FA462024QA318 Amendment 002
_____________________________________________________________________________________4
4.4.10. There will be no exposed wires, cables, etc. Only exposed cables may reside in communication/ electrical rooms.
4.4.11. Ethernet switch connections will be labeled in accordance with Appendix B.
4.4.12. Basement will contain a 24-port CAT 6 patch panel and terminate in ANSI/TIA/EIA T568B Standard on the back side of the patch panel.
4.4.13. Above ceiling exposed cabling will be a minimum of 3 feet from lighting and 120 VAC or higher, electrical boxes, etc., electrical sources. However, wires concealed within EMT can be within 3 feet of lighting and electrical sources.
4.5. Power Over Ethernet (POE) Injectors:
4.5.1. Are allowed for longer distances and installed per manufacturer’s installation instructions.
4.5.2. Injectors are required to be on an UPS, this can share the switch UPS. Note: There will be no electrical extension cords plugged into the UPS.
4.5.3. If POE injectors are required, a UPS is required to sustain for 30 minutes. UPS will not sit on the floor.
4.5.4. If POE injectors are used, they will be labeled IAW Appendix B label column.
4.6. Camera Mounting:
4.6.1. Cameras requiring mounting boxes the contractor will affixed and supplied by the contractor. When the walls consist of concrete, mounting box(s) can be used. Mounting boxes will not be glued to the concrete.
4.6.2. Camera external mounting devices must handle high winds more than 50 MPH.
4.6.3. Drilling into the building for the purpose of mounting cameras and running cable is authorized.
4.6.4. Interior/exterior camera mounting must clear all surrounding door openings.
4.5. Conduit:
4.5.1. There will be no exposed cabling.
4.5.2. If conduit is required, conduit shall be electrical metallic tubing (EMT).
4.5.3. Liquid tight flex conduit shall be used between the camera and camera junction/pull through box or for complicated runs of three feet or less.
4.5.4. Conduit fittings shall be the applicable fittings for each respectable conduit types.
4.5.5. Conduit will be hidden where possible and will only be visible when other options are no longer acceptable.
4.5.6. Exterior cameras may have exposed conduit.
4.5.7. Other than flex, EMT and junction/pull boxes attached to brick will be painted black, conduit attached to sheetrock will color match existing paint.
4.5.8. All exterior conduit fitting swill have waterproof compression connectors.
FA462024QA318 Amendment 002
_____________________________________________________________________________________5
4.6. Mounting hardware and face plates. Pelco mounting brackets and camera housings will stay their original color.
4.7. Uninterrupted Power Supply (UPS):
4.7.1. Purchase and install one, Cyber Power 1000VA/800 W Model PR1000LCDRT1U or 92 CS/SCOI approved equivalent.
4.7.2. UPS will be co-located with the switch.
4.7.3. UPS must be racked configured for a Tripp-Lite Model SRWF6U36.
4.7.4. UPS will have a sticker stating date purchased. Sticker must be viewable when opening the rack.
4.7.5. There will be no daisy chaining UPS(s) with other UPS(s). Onsite Government UPS(s) will not be used for these power supplies.
4.8. Lockable Rack:
4.8.1. Purchase and install one Tripp-Lite Model SRWF6U36 lockable, 6U in Comm/Mechanical room.
4.8.2. Lockable rack will not be mounted to sheetrock, must be on a 3/4-inch plywood, painted color of existing colors within the same room.
4.8.3. The contractor will install UPS inside rack.
4.8.4. Keys will be turned over to Dave Sherman.
4.9. Electrical Room Requirements:
4.9.1. Per the National Electrical Code (NEC) Article 100, all electrical rooms must be capable of being reached quickly for operation, renewal, or inspections without requiring those to whom ready access is requisite to take actions such as to use tools (other than keys), to climb over or under, to remove obstacles, or to resort to portable ladders, and so forth.
4.9.2. Per the National Electrical Code (NEC) Article 110, Width of Working Space. The width of the working space in front of the electrical equipment shall be the width of the equipment or 762 millimeters / 30 inches, whichever is greater. In all case, the workspace shall permit at least a 90-degree opening of equipment doors or hinger panels.
4.9.3. Per the National Electrical Code (NEC) Article 110, Height of Working Space. The workspace shall be clear and extend from the grade, floor, or platform to a height of 2.0 meters / 6 ½ feet or the height of the equipment, whichever is greater. Within the height requirements of this section, other equipment that is associated with the electrical installation and is located above or below the electrical equipment shall be permitted to extend not more than 150 millimeters / 6 inches beyond the front of the electrical equipment.
4.9.4. Per the National Electrical Code (NEC) Article 110, Depth of Working Space.
4.9.4.1. Nominal Voltage 0 - 150, 900 millimeters / 3 feet.
4.9.4.2. Nominal Voltage 151 - 600, 1.2 meters / 4 feet.
4.9.4.3. Nominal Voltage 601 - 1000, 1.5 meters / 5 feet.
FA462024QA318 Amendment 002
_____________________________________________________________________________________6
4.10. Electrical Outlets:
4.10.1. If additional electrical outlets are required, the contractor is responsible for providing the required electrical outlets and terminating with the electrical breaker panel.
4.10.2. This installation will be performed by a license electrician.
4.10.3. The breaker will be labeled for the corresponding camera(s).
4.11. Camera Recordings. Once all cameras are programmed and assigned to record, the 92 SFS/ESS will verify camera recordings. Adding new cameras to the base network will not decrease the bandwidth or degrade video surveillance. There is ample video storage available to support this camera installation.
4.12. Camera Licenses:
4.12.1. The contractor shall purchase 13 camera applicable licenses for an offline VideoXpert and 144 TB recordings. The contractor is responsible for activating those licenses with VideoXpert Toolbox. Coordinate VideoXpert Toolbox access with 92 SFS/ESS.
4.12.2. After activation, the contractor will email 92 SFS/ESS all license(es), entitlement(s), activation keys and associated paperwork.
4.13. AS-Builts. Contain the following minimum in order using Microsoft Excel Spreadsheet (will be emailed to Dave Sherman, david.sherman.15@us.af.mil):
4.13.1. Camera ID, i.e., E1, I3, etc.
4.13.2. Camera naming convention.
4.13.3. MAC Address.
4.13.4. Serial number.
4.13.5. Network switch patch panel port number.
4.13.6. Camera Type, i.e., PTZ, Fixed.
4.13.7. Model number.
4.13.8. Manufacturer date.
4.13.9. Warranty date.
4.13.10. POE injector manufacturer, model, and serial number.
4.13.11. Provide floor plan(s) with the following:
4.13.11.1. Camera locations with naming convention.
4.13.11.2. Cable type and installed locations.
4.13.11.3. Any pull or junction box locations.
4.13.11.4. Network switch cabinet, UPS, patch panel.
FA462024QA318 Amendment 002
_____________________________________________________________________________________7
4.13.12. The Government will not provide AutoCAD building floor plans/drawings.
4.14. Equipment Testing.
4.14.1. Prior to Government testing all cameras will have the latest firmware installed.
4.14.2. Before connecting to the base network, each camera feed will be viewed by the contractor. Upon successful camera video views, the contractor will provide each camera’s MAC to 92 SFS/ESS 48 hours prior to testing. The 92 SFS/ESS will forward those MACs to 92 CS Infrastructure. The 92 CS will add those MACs to the applicable network switches.
4.14.3. Once the MACs are added to the respective network switches, 92 SFS/ESS will inform the contractor and schedule a date for testing.
4.14.4. Upon installation, each camera shall be tested for the following: Recording, live feed, using VideoXpert software verify each camera can be viewed based on the degree coverage (i.e., Fixed, 180, 360 degrees), zoom close, far, up, and down, validate picture quality (color washout, brightness), camera views are not pixelated or distorted, checking camera obstructions, distortion, tearing, hum-bars, rolling, camera movement, choppy/fluid, clean lens (free of dirt, smudges, cracks, protective film), pixilation and artifacts, be free of dirt, smudges, and cracks.
4.15. Final Acceptance. This SOW will be used for the Government Acceptance Test. A final walk through will be conducted by the contractor and the Government. The contractor will provide the written notice to the Government 48 hours prior to the final acceptance date and time.
4.16. Work Site. The contractor shall clean the work sites at the end of each installation day, remove, and dispose of all debris to an off-base location. Clean cardboard may be recycled at the base Recycle Center.
4.17. Installation Manuals, Guides, and Pamphlets. The contractor will provide soft or hard copy of all manufacturer installation manuals, guides, etc. literature to the Government.
4.17. Quality Control. The contractor shall utilize their own internal quality control processes and procedures in performance of this requirement, to guarantee quality services, develop, and implement procedures to identify, prevent, and ensure non-recurrence of unsatisfactory services. The Government will conduct random Quality Assurance Evaluation (QAE) of all contractor work. Should there be instances of repeated unsatisfactory performance, the contractor’s quality control plan and supporting documentation shall be made available to the government upon request.
4.18. Warranty. The contractor shall honor standard warranties by Pelco after the Government Acceptance Test (GAT). Acceptance by the government will be pursuant upon a completed test and certification of the installed equipment. Installed equipment will be newly purchased and not stored on a shelf whereby the warranty is voided or nearly warrantied. Prior to GAT, the contractor will provide the Government each installed component’s warranty manufacturer, date of purchase, model number, serial number, and warranty expiration date.
5. DELIVERY: Delivery and installation shall be at Fairchild Air Force Base, WA 99011 at Bldg. 2279.
6. SECURITY REQUIREMENTS: All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the government installation, shall abide by all Fairchild Air Force Base security regulations. Personnel performing the work requested will be escorted for the duration on the installation.
Individuals must be able to pass a background check that will be conducted prior to entry of the installation.
Individuals performing the work will be required to provide their full name, DOB, SSN, driver’s license issuing state and license number to gain access to the installation.
7. PLACE OF PERFORMANCE: All work shall be performed on Building 2079 at FAFB, WA 99011.
FA462024QA318 Amendment 002
_____________________________________________________________________________________8
8. PERIOD OF PERFORMANCE: All work shall be completed within 120 days ARO.
9. GENERAL INFORMATION:
9.1. HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays and any other designated down day. Work can be done at other than the normal hours of operation with the approval of the Contracting Officer. The contractor shall coordinate in advance all hours of work and any service interruptions with Mr. Dave Sherman at (509) 247-3424 or david.sherman.15@us.af.mil.
January 1 New Year’s Day 3rd Monday in January Martin Luther King, Jr. Day 3rd Monday in February President’s Day Last Monday in May Memorial Day June 19 Juneteenth July 4 Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day November 11 Veterans Day 4th Thursday in November Thanksgiving Day December 25 Christmas
10. Certifications. The contractor or subcontractor shall provide the Government with current (not expired) training documents/certificate copies upon new and/or recertification of manufacturer certification for Pelco and VideoXpert
3.20 systems, hardware, software, and equipment installation. The contractor or subcontractor will maintain recertification standards with Pelco and VideoXpert policies for the duration of the contract period of performance.
11. APPENDICES.
Appendix A Camera Software Appendix B Camera Naming Convention Appendix C Dorm Topographical View Appendix D Bldg. 2279 Front Entrance Appendix E Bldg. 2279 Rear Entrance Appendix F Bldg. 2279 Day Rm 4th Floor Appendix G Bldg. 2279 Topographical Appendix H Bldg. 2279 PTZ Topographical Appendix I Bldg. 2279 Exterior Appendix J Bldg. 2279 Southeast [E1] Appendix K Bldg. 2279 Front Center East [E2] Appendix L Bldg. 2279 Front Center West [E3] Appendix M Bldg. 2279 Rear West [E4] Appendix N Bldg. 2279 Rear Center [E5] Appendix O Bldg. 2279 Rear Northeast [E6] Appendix P Bldg. 2279 Stairwell Basement and 1st Floor [E7 and E8] Appendix Q Bldg. 2279 Stairwell Basement Northeast [E7] Appendix R Bldg. 2279 Stairwell 1st Floor Northwest [E8] Appendix S Bldg. 2279 Stairwells 2nd and 3rd Floors [E9 and E10] Appendix T Bldg. 2279 Stairwell 2nd Floor Northeast [E9] Appendix U Bldg. 2279 Stairwell 3rd Floor Northwest [E10] Appendix V Bldg. 2279 Mechanical and Comm
FA462024QA318 Amendment 002
_____________________________________________________________________________________9
APPENDIX A
CAMERA SOFTWARE
Pelco VideoXpert Ops Center 3.20
Pelco VideoXpert Toolbox 3.20
Air Force Network Operating System Windows 10
_____________________________________________________________________________________10
APPENDIX B
CAMERA NAMING CONVENTION
EXTERIOR CAMERAS [E]
ID
LABEL
TYPE
NOTES
APPROX FIELD OF
VIEW DISTANCE
E1 Bldg. 2279 Southeast PTZ Infrared/30X Zoom 1500 Ft E2 Bldg. 2279 Front Center East PTZ Infrared/30X Zoom 1500 Ft E3 Bldg. 2279 Front Center West PTZ Infrared/30X Zoom 1500 Ft E4 Bldg. 2279 Rear West Fixed Infrared 300 Ft E5 Bldg. 2279 Rear Center Fixed Infrared 300 Ft E6 Bldg. 2279 Rear Northeast Fixed Infrared 300 Ft
E7
Bldg. 2279 Stairwell Basement Northeast
Fixed
Infrared
30 Ft
E8
Bldg. 2279 Stairwell 1st Floor Northwest
E9
Bldg. 2279 Stairwell 2nd Floor Northeast
E10
Bldg. 2279 Stairwell 3rd Floor Northwest
INTERIOR CAMERAS [I]
ID
LABEL
TYPE
NOTES
APPROX FIELD OF
VIEW DISTANCE
I1 Bldg. 2279 Front Entrance Fixed Infrared 50 Ft I2 Bldg. 2279 Rear Entrance Fixed Infrared 50 Ft I3 Bldg. 2279 Day Rm 4th Floor Fixed Infrared 30 Ft
_____________________________________________________________________________________11
APPENDIX C
_____________________________________________________________________________________12
APPENDIX D
_____________________________________________________________________________________13
_____________________________________________________________________________________14
APPENDIX E
_____________________________________________________________________________________15
_____________________________________________________________________________________16
APPENDIX F
_____________________________________________________________________________________17
_____________________________________________________________________________________18
APPENDIX G
_____________________________________________________________________________________19
APPENDIX H
_____________________________________________________________________________________20
APPENDIX I
_____________________________________________________________________________________21
APPENDIX J
_____________________________________________________________________________________22
APPENDIX K
_____________________________________________________________________________________23
APPENDIX L
_____________________________________________________________________________________24
APPENDIX M
_____________________________________________________________________________________25
APPENDIX N
_____________________________________________________________________________________26
APPENDIX O
_____________________________________________________________________________________27
APPENDIX P
_____________________________________________________________________________________28
APPENDIX Q
_____________________________________________________________________________________29
APPENDIX R
_____________________________________________________________________________________30
APPENDIX S
_____________________________________________________________________________________31
APPENDIX T
_____________________________________________________________________________________32
APPENDIX U
_____________________________________________________________________________________33
APPENDIX V
File details come from the government source that posted it. Updated .