Attachment 7 MFR CUI RECEIPT.pdf
PDF 254 KB Posted
- Solicitation number
- FA4613241025
About this file
This document is a Controlled Unclassified Information (CUI) Release Memorandum related to Solicitation FA461324Q1025 for Weapons Generation Facility Furniture, Fixtures and Equipment (WGF FFE). The memorandum outlines the requirements for safeguarding and handling CUI information associated with this solicitation. It states that CUI information can only be released to vendors who have completed the NIST SP 800-171 assessment in the Supplier Performance Risk System (SPRS) within the Procurement Integrated Enterprise Environment (PIEE). The memorandum provides instructions on how to request the CUI documents and the methods for properly destroying the CUI materials.
The related federal contract opportunity is a Solicitation for the design, delivery, and installation of furniture, fixtures, and equipment for the new Weapons Generation Facility at F.E. Warren AFB. This is a total small business set-aside under NAICS code 337127. The Government intends to award a firm fixed-price contract. Responses/quotes are due by July 22, 2024 at 11:00 AM MT. The contractor shall complete all requirements by December 2, 2024. The Government will evaluate quotes on technical capability and price, using a lowest price technically acceptable (LPTA) approach.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
90TH MISSILE WING (AFGSC)
DETER • MODERNIZE • STRIKE
18 July 2024
MEMORANDUM FOR RECORD
FROM: 90TH CONTRACTING SQUADRON/PKB
SUBJECT: Controlled Unclassified Information Release, Solicitation FA461324Q1025
WEAPONS GENERATION FACILITY FURNITURE, FIXTURES AND EQUIPMENT
1. The purpose of this memorandum is to record receipt of Department of Defense (DoD) Controlled Unclassified Information (CUI).
2. Information Safeguarding is required for any information that is marked as CONTROLLED
UNCLASSIFIED INFORMATION (CUI).
3. Please provide your Commercial and Government Entity (CAGE) Code and sign below to confirm receipt and acknowledgement of the following statements concerning safeguarding of CUI material.
a. Information safeguarding is the responsibility of the individual, agency, and/or company requesting and taking possession of the CUI documents associated with Solicitation
FA461324Q1025.
b. Release or reproduction of this material or any part thereof, is prohibited, except for official use only. No public publication of this material—by any means—is authorized.
c. This material shall be destroyed properly. In accordance with Section 2002.14 of Title 32, CFR and National Institute of Standards and Technology (NIST) Special Publication (SP) 800-88, record and non-record CUI documents must be destroyed by means approved for destroying classified information or by any other means making it unreadable, indecipherable, and unrecoverable.
d. The CUI paper destruction methods the individual, agency, and/or company must use are cross-cut shredders that produce 1mm. x 5 mm. (0.04 in. x 0.20 in.) particles (or smaller); or pulverize/disintegrate paper using disintegrator devices equipped with a 2.4 mm. (3/32 in.)
security screen.
4. Direct any questions in regard to this policy to the F. E. Warren AFB Civil Engineer Squadron at (307) 773-3046. Information safeguarding and marking requirements are per the following (when applicable):
a. AFI 33-332, Records Management and Information Governance Program;
b. DoDI 5200.48_DAFI 16-1403, Controlled Unclassified Information (CUI);
c. Defense Federal Acquisition Regulation Supplement (DFARS) 252.204-7008, Compliance with Safeguarding Covered Defense Information Controls;
d. DFARS 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting;
e. DFARS 252.204-7019, Notice of NISTSP 800-171 DoD Assessment Requirements;
f. DFARS 252.204-7020, NIST SP 800-171 DoD Assessment Requirements;
g. DFARS 252.204-7021, Cybersecurity Maturity Model Certification Requirements; and/or
h. Executive Order 12958
5. The document(s) shall only be released to vendors who have demonstrated they are compliant with DFARS 252.204-7019 and DFARS 252.204-7020 by COMPLETING THE BASIC ASSESSMENT/ NIST SP 800-171 in the Supplier Performance Risk System (SPRS) within the Procurement Integrated Enterprise Environment (PIEE).
6. Once the assessment has been verified complete in SPRS, the Contractor shall request documents via email from 1st Lt Kamary Williams at kamary.williams@us.af.mil.
7. The CUI document(s) shall be provided via a DoD SAFE Link (safe.apps.mil) and sent to the Contractor representative.
LOU O. BUSTILLO
Contracting Officer
TO: 90 CONS/PKB
DATE: _________________________ CAGE: _________________________
I have read and understand the Information Safeguarding Statement above and agree that the denoted CUI material(s) received below shall be returned to the 90th Contracting Squadron with the Contractor’s proposal.
I acknowledge receipt of CUI drawings pertaining to Solicitation FA461324Q1025, WEAPONS GENERATION FACILITY FURNITURE, FIXTURES AND EQUIPMENT.
(Contractor Company Name) (Contractor Signature)
(Contractor Name AND Title in Print)
| 2024-07-18T16:58:53-0600 | |
| BUSTILLO.MARIA LOURDES.O.1184836943 |
File details come from the government source that posted it. Updated .