Atch 3 Mission Essential Ktr Plan REV01.docx

DOCX document 26 KB Posted

Attached to
Vestas Wind Turbine Generator (WTG) Maintenance AMD02
Solicitation number
FA461323R0006
Issued by

View the file

Other files

File Type Posted
Atch 7 Q and A 15 May 2023.pdf PDF
AMD02 FA461323R0006.pdf PDF
Atch 5 SCA Wage Det.pdf PDF
Atch 4 Maintenance Task List REV02.xlsx XLSX spreadsheet
Atch 2 Cost Proposal.xlsx XLSX spreadsheet
Atch 1 PWS REV02 15 May 2023.pdf PDF
Atch 6 Maintenance Reports Sample Size.pdf PDF
Atch 5 SCA Wage Det.pdf PDF
Atch 2 Cost Proposal.xlsx XLSX spreadsheet
Atch 1 PWS REV01 8 May 2023.pdf PDF
AMD01 FA461323R0006.pdf PDF
Atch 4 Maintenance Task List REV01.xlsx XLSX spreadsheet
Atch 7 Questions and Answers 8 May 2023.pdf PDF
Atch 6 Maintenance Reports Sample Size.pdf PDF
Solicitation - FA461323R0006.pdf PDF
Atch 3 Mission Essential Ktr Plan REV01.docx DOCX document
Atch 1 PWS 20 Apr 2023 .pdf PDF
Atch 2 Cost Proposal.xlsx XLSX spreadsheet
Solicitation - FA461323R0006.pdf PDF
Atch 3 Mission Essential Ktr Plan.docx DOCX document
Atch 5 SCA Wage Det.pdf PDF
Atch 4 Maintenance Task List.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mission-Essential Contractor Services Plan for Vestas Wind Turbine Generator Maintenance Services

FE Warren AFB, Wyoming ## Month 2023

1. INTRODUCTION. This Mission-Essential Contractor Services Plan has been developed in accordance with DFARS Clause 252.237-7023 – Continuation of Essential Contractor Services. It addresses how [Insert Name of Contractor] will continue providing the mission-essential Vestas Wind Turbine Generator operation and maintenance services identified in the solicitation during periods of crisis, upon notification by the Contracting Officer (CO) to activate the plan.

2. OBJECTIVE. In support of the 90th Civil Engineering Squadron, the objective is to provide mission-essential Wind Turbine Generator maintenance services for FE Warren AFB, Wyoming during a crisis. The essential contractor services are identified below and will be performed at the prices in the contract at the time the plan is activated.

3. CONTRACTOR PROCEDURES. Contractor MUST answer the following in this plan:

a. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed;

1)

b. How you will address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves (i.e. list efforts taken to maintain sufficient level of staff and ensure adequate supplies);

1)

c. How you will address time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site (i.e. discuss actions/time needed to get personnel and resources in place, actions to expedite the process, ability to work extended hours if base access is restricted);

1)

d. How you will address components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home (i.e. list actions that can be performed remotely, contract manager duty location, etc);

1)

e. How you will establish an alert and notification procedure for mobilizing identified “essential contractor service” personnel (i.e. explain if alert/notification will be made after Government direction and means of notification, etc); and 1)

f. The approach you will use for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis (i.e. explain means of communication, use of Quality Control Plan, checklists, or other additional duties).

1)

g. Identify how you will conduct plant operations to overcome adverse conditions and situations, such as significant weather situations, employee illnesses, or unexpected vacancies (i.e. explain means of maintaining operations if weather limits travel or loss of employees).

1)

4. PRICING. The mission-essential Wind Turbine Generator Maintenance Services are identified in paragraph 5 and will be paid at the prices in the contract at the time the Plan is activated. The prices will also be used as the basis for any equitable adjustments resulting from the activation of the Plan.

5. Mission-Essential Contractor Services.

CLIN

Description of Service
Qty
Unit
Unit Price
Total Price
X001
Full Service Quarterly Maintenance
1
JOB
Current Price
Current Price
X002
Unscheduled Maintenance
30
HRS
Current Price
Current Price
X003
Replacement Parts
1
JOB
Current Price
Current Price

6. QUALITY CONTROL PLAN (QCP). The contractor shall utilize its own internal QCP during the performance of this plan.

7. DEACTIVATION OF PLAN. [Insert Name of Contractor] shall perform the mission-essential contractor services during a crisis until notified by the CO to cease performance of the Plan.

SIGNATURE PAGE

Contractor Point of Contact:_______________________________________

Phone Number(s):_______________________________________

Email Address:_______________________________________

Date:_____________________________