This document contains questions and answers regarding a request for information (RFI) for maintaining cathodic protection at eight Minuteman III missile sites. The RFI specifies replacing existing rectifiers and junction boxes. Treated wood poles, and fencing at four sites, will need to be removed and reinstalled. Wells should be spaced five feet apart and no more than 25 feet from the rectifier. Drawings provide details on the rectifier and junction box mounting. All work at each site must be completed before moving to the next site. Bidders are advised to visit the sites on June 9, 2021 at 10:00 am. Proposals are due by June 28, 2021 at 2:00 pm and should be submitted electronically to the designated Contract Administrator and Contracting Officer at the Department of the Air Force Global Strike Command.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Maintain Cathodic Protection at 8 MMIII Sites RFI Questions and Answers
1. Are we to included replacing the rectifiers at these missile sites in our quotes? On page 4 of 38 on the solicitation it reads “use existing”. In the past we’ve always just replaced them. We would also like to know if new junction boxes are required as well.
Per the Page 3 of the Statement of Work under “4. SCOPE OF WORK” section, the rectifier is to be replaced.
2. Will the treated poles at the sites need to be replaced?
We completed an inspection of the treated poles at the sites. We will need to replace all the treated poles at these sites, the Detail for the treated poles is on Sheet 5 of 5 in the plans.
3. Is there any fencing or barriers that will need to be disassembled/reconstructed?
There is fencing at I-06, I-08, L-01, and L-04 that will need to be disassembled/reassembled.
4. At what distance from the old wells should the new wells be located? How far away from the rectifier?
Typically 5’ between the wells, and no more than 25’ from the rectifier.
5. Can you send us a drawing or pictures of the existing rectifier/junction box mounting, so we can determine what’s required for the new rectifier/junction box?
See the Detail for the rectifier/junction box mounting on Sheet 5 of 5 in the plans.
6. Is it the intention that all wells should be installed prior to winter shutdown in 2021?
Yes, but this is weather dependent.
7. Can the wells be installed in succession prior to installing the rectifiers/junction boxes, or shall each site be completed prior to moving to a new location?
Each site shall be completed prior to moving to the next site.
8. What is the input AC requirement for the rectifier?
Per the Page 12 of the Statement of Work under “15. EQUIPMENT FOR RECTIFIERS AND SHUNT BOXES” section, the rectifier model is specified and shall be installed according to the SOW and the rectifier manufacturer recommendation.