Maintain Cathodic Protection at 8 MMIII Sites Project 20-1014
Solicitation number
FA461321R0006
Issued by

About this file

This document contains a schedule of material submittals for a federal contract solicitation to maintain cathodic protection at eight Minuteman III sites. The solicitation number is FA461321R0006 and was issued by the Department of the Air Force Global Strike Command. The schedule lists 21 items requiring submission at various stages of the contract, including documentation, permits, material safety data sheets, project schedules, test results, and as-built drawings. It specifies the number of copies required, required submission dates prior to contract award and completion, and spaces for acknowledging receipt and approval of each submittal. A site visit is scheduled for 9 June 2021 at 10:00 am MT at parking lot B208 of FE Warren Air Force Base in Wyoming. Proposals must be submitted no later than 28 June 2021 at 2:00 pm MT via email to the designated Contract Administrator and Contracting Officer.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NUMBER SOLICITATION/CONTRACT NUMBER

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W

A R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

O

D

TE

TE

R

EC

EI

VE

C

N

TR

A C

TI

N

G

D A

TE

T

O C

IV

IL

EN

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

TO

R

ES

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPPROVED

1 EAL Documentation Sec 8.2

1 After Award

2 AF Form 103- Dig Permit Sec 10 1 After Award

All Permits (Local, State, and Federal) NPDES, ROW, or Other Sec 5.1

4 After Award

4 Material Safety Data Sheets Sec 21.4 4 After Award

5 Hazardous Materials Sec 21.4 4 After Award

6 Storage Plan (If Required) Sec 6.8 4 After Award

7 Project Schedule Sec 6.3 4

15 Days After

Award

8 Anodes Sec 16.4 4 4 4

21 Days After

Award

9 Anode Lead Wire Sec 16.5 4 4 4

21 Days After

Award

10 Backfill Sec 16.2 4 4

21 Days After

Award

11 Anode Centralizers Sec 16.6 4 4 4

21 Days After

Award

12 Vent Pipe Sec 16.1 4 4 4

21 Days After

Award

13 48V/30A Rectifier Sec 15 4 4 4 4 4

21 Days After

Award

14 18V-16A Rectifier Sec 15

15 #4 Cable 4 4 4 21 Days

After Award

16 As-Built Drawings For Each Site Sec 6.14 4 30 Prior to

CO

AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED See Specifications for Frequency

PROJECT TITLE

Maintain Cathodic Protection at 8 MMIII SitesGHLN 20-1014

PROJECT NUMBER SOLICITATION/CONTRACT NUMBER

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

LI

N

E N

U M

B

ER

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

E' S

R

EC

O M

M

EN

D A

TI

O

N S

M A

N U

FA

C

TU

R

ER

'S

W

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

ST

R U

C

TI

O N

S

TE

ST

S

R

EP

O R

TS

R

EQ

U

IR

ED

S

U B

M

IS

SI

TE

TE

R

EC

EI

VE

C

N

TR

A C

TI

N

G

D A

TE

T

O C

IV

IL

EN

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

FO

LL

O W

-U P

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

TO

ES

U

B M

IT

TA

L

FI

N

A L

A

PP

R O

VA

L

REMARKS

APPROVED DISAPPROVED

16 Anode Resistance Test Sec 18.1 4 5 Days After

Test

17 Anode Current Output Test Sec 18.2 4 5 Days After

Test

18 Drilling Logs Sec 17.1 4 5 Days After Test

19 Structure/Soil Test Sec 18.3 4 5 Days After

Test

Cathodic Protection Performance Survey Sec 18.4

30 Days Prior DO Close Out

AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED See Specifications for Frequency

PROJECT TITLE

GHLN 20-1014 Maintain Cathodic Protection at 8 MMIII Sites

Sheet 1