Atch_3_Price_Breakdown_VCC_SCS.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Vehicle Corrosion Control Services Federal contract opportunity
- Solicitation number
- FA461020Q0003
About this file
Attachment 3 Price Breakdown SCS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_1_PWS_Vehicle_Corrosion_Control_dtd_28_Aug_19.pdf | ||
| FA461020Q0003_Corrosion_Control_20191029.docx | DOCX document | |
| Atch_2_Price_Breakdown_VCC_LRS.xlsx | XLSX spreadsheet | |
| Atch_5_Wage_Determination_2015_5647_Rev_8_20190802.pdf | ||
| Atch_4_Technical_Response_Questionaire_20191010.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0002- Base Year SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the of the labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| CLIN 0002 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | |||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | ||
| 0002A | Automotive Glass Worker | x | Labor Hour | 0 | = | $ - 0 | |
| 0002B | Motor Equipment Metal Worker | x | Labor Hour | 15 | = | $ - 0 | |
| 0002C | Motor Vehicle Mechanic | x | Labor Hour | 30 | = | $ - 0 | |
| 0002D | Painter, Automotive | x | Labor Hour | 120 | = | $ - 0 | |
| 0002E | Truck Driver, Heavy | x | Labor Hour | 0 | = | $ - 0 |
Total Proposed Labor Price $ - 0 (Block D)
0002F Government Estimated Cost for Materials $ 10,000.00 (Block E)
Total Proposed Price for CLIN 0001 (Sum of Blocks D + E = F) $10,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 0001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with Joint Federal Travel Regulation (JFTR). |
&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (SCS) CLIN 0002 CLIN 0002, Base Year
1 Dec 2019 - 31 May 2020 (Base Period) CLIN 0002 Vehicle Corrosion Control
CLIN 1002 - OY1
SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| CLIN 1002 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | |||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | ||
| 1002A | Automotive Glass Worker | x | Labor Hour | 0 | = | $ - 0 | |
| 1002B | Motor Equipment Metal Worker | x | Labor Hour | 30 | = | $ - 0 | |
| 1002C | Motor Vehicle Mechanic | x | Labor Hour | 60 | = | $ - 0 | |
| 1002D | Painter, Automotive | x | Labor Hour | 240 | = | $ - 0 | |
| 1002E | Truck Driver, Heavy | x | Labor Hour | 0 | = | $ - 0 |
Total Proposed Labor Price $ - 0 (Block D)
1002F Government Estimated Cost for Materials $ 15,000.00 (Block E)
Total Proposed Price for CLIN 1002 (Sum of Blocks D + E = F) $15,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 1001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR. |
&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (SCS) CLIN 1002 CLIN 1002, Option Year 1
1 Jun 2020 - 31 May 2021 (Option Year 1) CLIN 1002 Vehicle Corrosion Control
CLIN 2002 - OY2
SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| CLIN 2002 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | |||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | ||
| 2002A | Automotive Glass Worker | x | Labor Hour | 0 | = | $ - 0 | |
| 2002B | Motor Equipment Metal Worker | x | Labor Hour | 30 | = | $ - 0 | |
| 2002C | Motor Vehicle Mechanic | x | Labor Hour | 60 | = | $ - 0 | |
| 2002D | Painter, Automotive | x | Labor Hour | 240 | = | $ - 0 | |
| 2002E | Truck Driver, Heavy | x | Labor Hour | 0 | = | $ - 0 |
Total Proposed Labor Price $ - 0 (Block D)
2002F Government Estimated Cost for Materials $ 15,000.00 (Block E)
Total Proposed Price for CLIN 2002 (Sum of Blocks D + E = F) $15,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 2001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR. |
&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (SCS) CLIN 2002, Option Year 2
1 Jun 2021 - 31 May 2022 (Option Year 2) CLIN 2002 Vehicle Corrosion Control
CLIN 3002- OY3
SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| CLIN 3002 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | |||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | ||
| 3002A | Automotive Glass Worker | x | Labor Hour | 0 | = | $ - 0 | |
| 3002B | Motor Equipment Metal Worker | x | Labor Hour | 30 | = | $ - 0 | |
| 3002C | Motor Vehicle Mechanic | x | Labor Hour | 60 | = | $ - 0 | |
| 3002D | Painter, Automotive | x | Labor Hour | 240 | = | $ - 0 | |
| 3002E | Truck Driver, Heavy | x | Labor Hour | 0 | = | $ - 0 |
Total Proposed Labor Price $ - 0 (Block D)
3002F Government Estimated Cost for Materials $ 15,000.00 (Block E)
Total Proposed Price for CLIN 2001 (Sum of Blocks D + E = F) $15,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 3001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR. |
&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) CLIN 3002, Option Year 3
1 Jun 2022 - 31 May 2023 (Option Year 3) CLIN 3002 Vehicle Corrosion Control
CLIN 4002- OY4
SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| CLIN 4002 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | |||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | ||
| 4002A | Automotive Glass Worker | x | Labor Hour | 0 | = | $ - 0 | |
| 4002B | Motor Equipment Metal Worker | x | Labor Hour | 30 | = | $ - 0 | |
| 4002C | Motor Vehicle Mechanic | x | Labor Hour | 60 | = | $ - 0 | |
| 4002D | Painter, Automotive | x | Labor Hour | 240 | = | $ - 0 | |
| 4002E | Truck Driver, Heavy | x | Labor Hour | 0 | = | $ - 0 |
Total Proposed Labor Price $ - 0 (Block D)
4002F Government Estimated Cost for Materials $ 15,000.00 (Block E)
Total Proposed Price for CLIN 4001 (Sum of Blocks D + E = F) $15,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 4001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR. |
&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (SCS) CLIN 4002, Option Year 4
1 Jun 2023 - 31 May 2024 (Option Year 4) CLIN 4002 Vehicle Corrosion Control
CLIN 5002- 6 Month SCS Vehicle Corrosion Control
| A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category |
| required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose |
| an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet. |
| CLIN 5002 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates | |||||||
| Labor Category Name | Hourly Rate | Unit of Issue | Estimated Hours | = | Total | ||
| 5002A | Automotive Glass Worker | x | Labor Hour | 0 | = | $ - 0 | |
| 5002B | Motor Equipment Metal Worker | x | Labor Hour | 15 | = | $ - 0 | |
| 5002C | Motor Vehicle Mechanic | x | Labor Hour | 30 | = | $ - 0 | |
| 5002D | Painter, Automotive | x | Labor Hour | 120 | = | $ - 0 | |
| 5002E | Truck Driver, Heavy | x | Labor Hour | 0 | = | $ - 0 |
Total Proposed Labor Price $ - 0 (Block D)
5002F Government Estimated Cost for Materials $ 10,000.00 (Block E)
Total Proposed Price for CLIN 5002 (Sum of Blocks D + E = F) $10,000.00 (Block F)
| Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 4001. |
| *If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose |
| travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR. |
&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) CLIN 5002, 6 Month
1 Jun 2024 - 30 Nov 2024 (6 Month) CLIN 5002 Vehicle Corrosion Control
File details come from the government source that posted it.