Atch_3_Price_Breakdown_VCC_SCS.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Vehicle Corrosion Control Services Federal contract opportunity
Solicitation number
FA461020Q0003
Issued by
Department of the Air Force Space Command

About this file

Attachment 3 Price Breakdown SCS

View the file

Other files for this federal contract opportunity

Other files attached to Vehicle Corrosion Control Services, newest first.
File Type Posted
Atch_1_PWS_Vehicle_Corrosion_Control_dtd_28_Aug_19.pdf PDF
FA461020Q0003_Corrosion_Control_20191029.docx DOCX document
Atch_2_Price_Breakdown_VCC_LRS.xlsx XLSX spreadsheet
Atch_5_Wage_Determination_2015_5647_Rev_8_20190802.pdf PDF
Atch_4_Technical_Response_Questionaire_20191010.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0002- Base Year SCS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the of the labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
CLIN 0002 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
0002AAutomotive Glass WorkerxLabor Hour0=$ - 0
0002BMotor Equipment Metal WorkerxLabor Hour15=$ - 0
0002CMotor Vehicle MechanicxLabor Hour30=$ - 0
0002DPainter, AutomotivexLabor Hour120=$ - 0
0002ETruck Driver, HeavyxLabor Hour0=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

0002F Government Estimated Cost for Materials $ 10,000.00 (Block E)

Total Proposed Price for CLIN 0001 (Sum of Blocks D + E = F) $10,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 0001.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with Joint Federal Travel Regulation (JFTR).

&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (SCS) CLIN 0002 CLIN 0002, Base Year

1 Dec 2019 - 31 May 2020 (Base Period) CLIN 0002 Vehicle Corrosion Control

CLIN 1002 - OY1

SCS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
CLIN 1002 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
1002AAutomotive Glass WorkerxLabor Hour0=$ - 0
1002BMotor Equipment Metal WorkerxLabor Hour30=$ - 0
1002CMotor Vehicle MechanicxLabor Hour60=$ - 0
1002DPainter, AutomotivexLabor Hour240=$ - 0
1002ETruck Driver, HeavyxLabor Hour0=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

1002F Government Estimated Cost for Materials $ 15,000.00 (Block E)

Total Proposed Price for CLIN 1002 (Sum of Blocks D + E = F) $15,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 1001.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (SCS) CLIN 1002 CLIN 1002, Option Year 1

1 Jun 2020 - 31 May 2021 (Option Year 1) CLIN 1002 Vehicle Corrosion Control

CLIN 2002 - OY2

SCS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
CLIN 2002 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
2002AAutomotive Glass WorkerxLabor Hour0=$ - 0
2002BMotor Equipment Metal WorkerxLabor Hour30=$ - 0
2002CMotor Vehicle MechanicxLabor Hour60=$ - 0
2002DPainter, AutomotivexLabor Hour240=$ - 0
2002ETruck Driver, HeavyxLabor Hour0=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

2002F Government Estimated Cost for Materials $ 15,000.00 (Block E)

Total Proposed Price for CLIN 2002 (Sum of Blocks D + E = F) $15,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 2001.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (SCS) CLIN 2002, Option Year 2

1 Jun 2021 - 31 May 2022 (Option Year 2) CLIN 2002 Vehicle Corrosion Control

CLIN 3002- OY3

SCS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
CLIN 3002 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
3002AAutomotive Glass WorkerxLabor Hour0=$ - 0
3002BMotor Equipment Metal WorkerxLabor Hour30=$ - 0
3002CMotor Vehicle MechanicxLabor Hour60=$ - 0
3002DPainter, AutomotivexLabor Hour240=$ - 0
3002ETruck Driver, HeavyxLabor Hour0=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

3002F Government Estimated Cost for Materials $ 15,000.00 (Block E)

Total Proposed Price for CLIN 2001 (Sum of Blocks D + E = F) $15,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 3001.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) CLIN 3002, Option Year 3

1 Jun 2022 - 31 May 2023 (Option Year 3) CLIN 3002 Vehicle Corrosion Control

CLIN 4002- OY4

SCS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
CLIN 4002 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
4002AAutomotive Glass WorkerxLabor Hour0=$ - 0
4002BMotor Equipment Metal WorkerxLabor Hour30=$ - 0
4002CMotor Vehicle MechanicxLabor Hour60=$ - 0
4002DPainter, AutomotivexLabor Hour240=$ - 0
4002ETruck Driver, HeavyxLabor Hour0=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

4002F Government Estimated Cost for Materials $ 15,000.00 (Block E)

Total Proposed Price for CLIN 4001 (Sum of Blocks D + E = F) $15,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 4001.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (SCS) CLIN 4002, Option Year 4

1 Jun 2023 - 31 May 2024 (Option Year 4) CLIN 4002 Vehicle Corrosion Control

CLIN 5002- 6 Month SCS Vehicle Corrosion Control

A Firm-Fixed Price proposal shall be provided to Government to include a breakdown of the number of labor hours for each labor category
required along with a list of the materials/parts needed for the repair within 5 workdays upon identification. Contractor is to propose
an hourly Firm-Fixed Price for each labor category outlined in Attachment 2 - Price Breakdown Sheet.
CLIN 5002 Vehicle Corrosion Control: Proposed Firm Fixed-Price Rates
Labor Category NameHourly RateUnit of IssueEstimated Hours=Total
5002AAutomotive Glass WorkerxLabor Hour0=$ - 0
5002BMotor Equipment Metal WorkerxLabor Hour15=$ - 0
5002CMotor Vehicle MechanicxLabor Hour30=$ - 0
5002DPainter, AutomotivexLabor Hour120=$ - 0
5002ETruck Driver, HeavyxLabor Hour0=$ - 0

Total Proposed Labor Price $ - 0 (Block D)

5002F Government Estimated Cost for Materials $ 10,000.00 (Block E)

Total Proposed Price for CLIN 5002 (Sum of Blocks D + E = F) $10,000.00 (Block F)

Note: Block F amount shall be inserted into the SF1449 for the unit price, extended amount and net amount for CLIN 4001.
*If there are travel costs associated with mobilization, unconnected with the regular scheduled maintenance, contractor may propose
travel costs (transportation, lodging and per diem) costs and shall be in accordance with JFTR.

&"-,Bold"&14Price Breakdown 30 Space Communications Squadron (30 SCS) CLIN 5002, 6 Month

1 Jun 2024 - 30 Nov 2024 (6 Month) CLIN 5002 Vehicle Corrosion Control

File details come from the government source that posted it.